Data Center Record.
Census GEOID: 53033 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 primary sources

● Running First recorded September 14, 2026 · 1 Building

Equinix SE4 Kent Data Center

Street address 6906 South 204th Street, Kent, WA 98032, King County verified address Exact, at the address [2] Equinix: Equinix SE4

Overview, regulatory gates and specifications

Equinix operates its SE4 International Business Exchange data center at 6906 South 204th Street in Kent, King County, Washington. [1] Filings on the record specify disclosed capacity of 10 MW (the developer's figure), 1 planned or operational building. [2] Equinix lists Equinix SE4 at Kent, Washington on its own page of data center locations, read September 14, 2026. [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
10 MW
the developer's figure

Equivalent to ~8,300 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.5% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 6906 South 204th Street, Kent, WA 98032.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
10 MW developer figure Equivalent to the continuous electricity demand of about 8,300 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.098 percent) of New York City's summer peak demand in 2024.
[2] equinix.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] equinix.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2016 (10 years)
Who leads it
Equinix as stated by the source
Official project website
equinix.com (opens in a new tab) verified October 28, 2026
equinix.com (opens in a new tab)
Archived promotional websites
equinix.com (offline) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Equinix SE4 Kent Data Center, capacity: 10 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 10 ÷ 10,245 = 0.00098 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Equinix
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Equinix SE4 Kent Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 10 MW 10 MW the developer's figure [2] equinix.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [2] equinix.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

June 10, 2026 Seattle, WA Seattle City Council One Year Data Center Moratorium Vote Seattle City Council 3 clips

On June 10, 2026, the Seattle City Council passed an interim ordinance imposing a one year moratorium on new data center development in Seattle to study Seattle City Light grid capacity and backup diesel generator pollution.

  1. KIRO 7 News Broadcast Report Broadcast Report transcribed from local broadcast report
    "data centers in Seattle. Thanks for joining us, I'm Elma Thomas. I'm Monique Ming Law Van and Cairo 7's Brandon Thompson is live at City Hall right now. Brandon, you have been reporting on big proposals in the city. Yeah, a couple months ago there was a proposal for five large data centers that would have soaked up nearly a third of the city's electricity according to Seattle City Light. Now, none of those got past the early stages, but it inspired in part this legislation as"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "than an hour ago, every single one of them voted for this pause. Stop the data centers. Stop the data centers. Near unanimous testimony at Seattle City Hall. We are already seeing the consequences of unchecked data center expansion in the Pacific Northwest. Calling to pause the filing, acceptance, and processing of any new or expanded large data centers for the next year. We're seeing data centers pop up"
  3. KIRO 7 News Broadcast Report Broadcast Report transcribed from local broadcast report
    "proper consideration of whether our water and energy systems can actually sustain sustain the buildings. In the ordinance he sponsored, Council member Ed Lee says Washington state is desirable for data centers because of the cheap electricity and access to water saying centers can use 300,000 gallons of water a day. It's sort of the wild west. We need to have appropriate regulations and controls to figure out, you know, where data centers can or should be located."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Equinix lists Equinix SE4 at Kent, Washington on its own page of data center locations, read September 14, 2026.

    [2] equinix.com

1 correction to this record

Every correction, with its reason
  1. · Timeline date

    Dated from its source: the row's own text states it: "... read September 14, 2026."

Every correction on the record is on the corrections page.

Nearest data centers in Washington

Verified data center records in Washington within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Centersquare Seattle Tukwila Data Center Campus (SEA1-A and SEA1-B) Seattle, King County 5 mi Running Centersquare 8 MW
Sabey Data Centers Intergate Seattle East Campus Tukwila, King County 5 mi Running Sabey Data Centers 50 MW
DataBank Tukwila Data Center (SEA2) Tukwila, King County 6 mi Running DataBank 12 MW
Sabey Data Centers Intergate Seattle West Campus Tukwila, King County 6 mi Running Sabey Data Centers 24 MW
EdgeConneX Seattle Tukwila Data Center (EDCSEA01) Tukwila, King County 6 mi Running EdgeConneX 8 MW
Colocation Northwest Bellevue Data Center Bellevue, King County 12 mi Running Colocation Northwest 4 MW

Blank cell: not disclosed by any source on file.

Common questions about Equinix SE4 Kent Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Equinix SE4 Kent Data Center?

Equinix is the developer. No construction contractor is named on the record yet.

How much power and water does Equinix SE4 Kent Data Center say it needs?

Power: 10 MW (the developer's figure, equinix.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Equinix SE4 Kent Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Equinix: United States and Canada colocation data centers (opens in a new tab), Equinix, September 14, 2026
  2. Equinix: Equinix SE4 (opens in a new tab), Equinix, September 14, 2026
  3. Equinix lists SE4 at Kent, Washington (opens in a new tab), Equinix

3 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Equinix SE4 Kent Data Center", https://datacenterrecord.org/projects/equinix-se4-kent-wa, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Equinix SE4 Kent Data Center", https://datacenterrecord.org/projects/equinix-se4-kent-wa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
47.420627, -122.247527
How the location is known
Location from the site's street address.
Location source
https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/seattle-data-centers/se4
Coordinate source
King County Assessor / Equinix
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
10 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Equinix SE4 Kent Data Center · 3 sources, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON