Data center laws in Washington

1 rule at the state level: 1 statute. Each says what it requires in the words of its text, with the effective date the text gives and a link to the bill or order.

Last verified

Rules on the record
1
Passed
1
Statutes
1

Rules in Washington

  • S.B. 6231 Statute

    Revised for engrossed: Removing a tax exemption for the replacement of equipment for data centers.

    Passed passed April 1, 2026. 2025-2026 Regular Session. This status is read from the bill's own record, not written here.

    S.B. 6231 of the 2025-2026 Regular Session was signed on April 1, 2026. The legislature titles it: Revised for engrossed: Removing a tax exemption for the replacement of equipment for data centers.

    What it requires

    Under both retail sales tax exemptions for data center equipment, RCW 82.08.986 and RCW 82.08.9861, eligible server equipment is the original server equipment installed in an eligible computer data center, or in the space a qualifying tenant leases there, within the dates each subsection sets.

    Under both retail sales tax exemptions for data center equipment, RCW 82.08.986 and RCW 82.08.9861, eligible server equipment is the original server equipment installed in an eligible computer data center, or in the space a qualifying tenant leases there, within the dates each subsection sets. Replacement server equipment remains eligible only for the data centers RCW 82.08.986 qualifies under (f)(i)(C)(I) and (II), and only where it was installed and put into regular use before April 1, 2018 and April 1, 2024 respectively. The act places no new duty on a data center, an operator, a utility or a local government: what it changes is what a buyer may claim.

    Describes the act as enacted.

    The text: app.leg.wa.gov (opens in a new tab) primary source

    Last verified September 20, 2026.

A law here is one statute, utility commission order, tariff, tax rule, moratorium or bill at the state level. What it requires is taken from the text, never summarized from coverage; a date the text does not give is left empty. Its status is one of five, defined on the laws index. The dated events beneath a law are the scorecard entries that cite it.

Bills tracked

5 bills tracked in the Washington legislature: 3 signed into law, 2 in committee. A row opens its own page, with its history, each recorded vote and the legislature's own text. A resolution states a position and does not change the law.

No official summary on file for any of these 5 bills; each links to the legislature's page for the text.

5 bills tracked in Washington; 2025-2026 Regular Session, legislature adjourned. No data center bills found as of October 26, 2026. Search terms: data center, data centre, large load, hyperscale, computing facility, server farm, high load factor (indirect), energy intensive facility (indirect), large electric load (indirect), digital asset mining (indirect), cryptocurrency mining (indirect), qualified technology facility (indirect), colocation (indirect), moratorium (with another term), sales tax exemption (with another term). The search on LegiScan. (opens in a new tab)

Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill. LegiScan is credited as the finder; the citation is the legislature's own page. How bills and votes are recorded.

This page as data CSV JSON
Cite this page

Data Center Record, "Data center laws in Washington", https://datacenterrecord.org/laws/wa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data