Data Center Record.
Census GEOID: 53063 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and 1 reporting sources

● Running Reported July 2, 2026 · 1 Building

TierPoint Downtown Spokane Data Center

Street address 601 West First Avenue, Spokane, WA 99201, Spokane County verified address Exact, at the address tierpoint.com (opens in a new tab)

Overview, regulatory gates and specifications

TierPoint operates its downtown Spokane colocation data center at 601 West First Avenue in Spokane, Spokane County, Washington. [3] Filings on the record specify disclosed capacity of 4 MW (the developer's figure), 1 planned or operational building. [3] TierPoint lists TierPoint Spokane Data Centers at Spokane, Washington on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
4 MW
the developer's figure

Equivalent to ~3,320 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 601 West First Avenue, Spokane, WA 99201.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
4 MW developer figure Equivalent to the continuous electricity demand of about 3,320 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.039 percent) of New York City's summer peak demand in 2024.
tierpoint.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
tierpoint.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
TierPoint as stated by the source
Official project website
tierpoint.com (opens in a new tab) verified October 28, 2026
tierpoint.com (opens in a new tab)
Archived promotional websites
tierpoint.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. TierPoint Downtown Spokane Data Center, capacity: 4 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 4 ÷ 10,245 = 0.00039 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: TierPoint
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for TierPoint Downtown Spokane Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 4 MW 4 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

July 25, 2026 Spokane, WA Why Spokane Is Fighting New Data Centers Spokane City Council 3 clips

The Center Square report on Spokane City Council and community proceedings in Spokane, WA: Why Spokane Is Fighting New Data Centers (July 25, 2026).

  1. The Center Square Broadcast Report Broadcast Report transcribed from local broadcast report
    "a one year moratorium on data center projects. And this week then Spokane County Commissioners followed suit proposing a nine month version of a moratorium for the county so that would cover a much larger area. Now three Republicans got involved and they proposed, "Okay, maybe we should just do kind of a zoning ordinance here, not put the kibosh completely on data center"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "we'll do, you know, in return for this. Maybe we'll create our own power supply for this. Maybe we're going to, you know, we'll have our own water system so that we're not sucking off of the power grid and, you know, off of the utilities and so the ratepayers aren't ultimately, you know, the ones who are victimized by this." So I I want to share part of my conversation with Congressman Michael"
  3. The Center Square Broadcast Report Broadcast Report transcribed from local broadcast report
    "We got to make sure data centers are done right in a way that communities understand. You know, no no community that you know, a lot of data centers are essentially a local government decision, but you know, I've introduced legislation that would make sure that data centers don't increase folks electricity rates and don't increase water rates. And then it's really into a community discussion. A lot of people worry about data centers and artificial"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running Moratorium (source date; the content gives no date of its own)

    Data center development in Spokane paused or stalled

    [3] spokanejournal.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    TierPoint lists TierPoint Spokane Data Centers at Spokane, Washington on its own page of data center locations, read September 14, 2026.

    [1] tierpoint.com

1 correction to this record

Every correction, with its reason
  1. · Timeline date

    Dated from its source: the row's own text states it: "... read September 14, 2026."

Every correction on the record is on the corrections page.

Nearest data centers in Washington

Verified data center records in Washington within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
TierPoint Liberty Lake Data Center (Spokane East) Liberty Lake, Spokane County 15 mi Running TierPoint 6 MW

Blank cell: not disclosed by any source on file.

Common questions about TierPoint Downtown Spokane Data Center

Answered directly from the verified filings and local actions on this page.

Who is building TierPoint Downtown Spokane Data Center?

TierPoint is the developer. No construction contractor is named on the record yet.

How much power and water does TierPoint Downtown Spokane Data Center say it needs?

Power: 4 MW (the developer's figure, tierpoint.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does TierPoint Downtown Spokane Data Center stand today?

It is running, as reported July 2, 2026. The newest entry, reported July 2, 2026: Data center development in Spokane paused or stalled [3].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. TierPoint: Browse our data centers (opens in a new tab), TierPoint, September 14, 2026
  2. TierPoint lists Spokane Data Centers at Spokane, Washington (opens in a new tab), TierPoint

Reporting

  1. Data center pause clouds Spokane's future - Spokane Journal of Business (opens in a new tab), Spokane Journal of Business, July 2, 2026, news outlet

3 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "TierPoint Downtown Spokane Data Center", https://datacenterrecord.org/projects/tierpoint-spokane-data-centers-wa, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "TierPoint Downtown Spokane Data Center", https://datacenterrecord.org/projects/tierpoint-spokane-data-centers-wa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
47.6568, -117.4215
How the location is known
Location from the site's street address.
Location source
https://www.tierpoint.com/data-centers/washington/spokane-downtown/
Coordinate source
Spokane County Assessor / TierPoint
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
4 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed