● Proposed Campus Recorded July 7, 2026 · 2 Buildings

Elk River Technology Park Data Center

Street address 171st Avenue NW and US Highway 10, Elk River, MN 55330, Sherburne County verified address Exact, at the address [1] cbsnews.com

Overview, regulatory gates and specifications

Swervo Development proposed a 2 building, 33 MW data center campus in Elk River, Sherburne County, Minnesota. [1] A proposed data center in Elk River faced resident opposition and was effectively blocked after the city rejected changing zoning rules to allow data centers. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
In local review
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
33 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
33 MW
the developer's figure

Equivalent to ~27,390 U.S. homes (U.S. EIA 830 homes/MW baseline) · 1.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
agency filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 171st Avenue NW and US Highway 10, Elk River, MN 55330.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
33 MW developer figure Equivalent to the continuous electricity demand of about 27,400 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.3 percent of New York City's summer peak demand in 2024.
[1] cbsnews.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] cbsnews.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Swervo Development as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Elk River Technology Park Data Center, capacity: 33 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 33 ÷ 10,245 = 0.0032 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Swervo Development
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Elk River Technology Park Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 33 MW the developer's figure [1] cbsnews.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings agency filing [1] cbsnews.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: stalled or cancelled (content date)

    A proposed data center in Elk River faced resident opposition and was effectively blocked after the city rejected changing zoning rules to allow data centers.

    [1] cbsnews.com

Every event in order

2 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Minnesota

Verified data center records in Minnesota within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Amazon Web Services Becker Data Center Campus Becker, Sherburne County 15 mi Proposed Amazon Web Services 250 MW
DataBank Brooklyn Park Data Center (MSP3 North Metro) Brooklyn Park, Hennepin County 15 mi Running DataBank 30 MW
Former Star Tribune Printing Plant Data Center Minneapolis, Hennepin County 28 mi Stalled or cancelled North Loop Redevelopment 1 building
Atomic Data Minneapolis Data Center (MSP250) Minneapolis, Hennepin County 28 mi Running Atomic Data 4 MW
TriTech Center Carrier Hotel Minneapolis Minneapolis, Hennepin County 28 mi Running DCI Technology 4 MW
T5 Data Centers Minneapolis (T5@Minneapolis) Minneapolis, Hennepin County 28 mi Running T5 Data Centers 12 MW

Blank cell: not disclosed by any source on file.

Common questions about Elk River Technology Park Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Elk River Technology Park Data Center?

Swervo Development is the developer. No construction contractor is named on the record yet.

How much power and water does Elk River Technology Park Data Center say it needs?

Power: 33 MW (the developer's figure, cbsnews.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Elk River Technology Park Data Center stand today?

It is proposed; the date it reached that stage is not sourced, only the day a page was read. The newest entry, July 7, 2026: A proposed data center in Elk River faced resident opposition and was effectively blocked after the city rejected changing zoning rules to allow data centers. [1]

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Elk River brewery owner says future of business depends on whether city approves data center next door - CBS News (opens in a new tab), CBS News, June 24, 2026, national outlet
  2. Elk River rejects changing rules to allow data centers - MPR News (opens in a new tab), MPR News, July 7, 2026, local outlet
  3. Proposed data center in Elk River faces opposition from residents - CBS News (opens in a new tab), CBS News, June 15, 2026, national outlet

3 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Elk River Technology Park Data Center", https://datacenterrecord.org/projects/elk-river-data-center-mn, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Elk River Technology Park Data Center", https://datacenterrecord.org/projects/elk-river-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
45.31722, -93.58111
How the location is known
Location from the site's street address.
Location source
https://www.elkrivermn.gov/
Coordinate source
City of Elk River EAW filing parcel
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
33 MW, the developer's figure
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Elk River Technology Park Data Center · 3 sources, 1 entry · basis and source tier on every row · verified November 6, 2026

Download CSV JSON