● Stalled or Cancelled Recorded August 23, 2026 · 1 Building

Former Star Tribune Printing Plant Data Center

Street address 800 North 1st Street, Minneapolis, MN 55401, Hennepin County verified address Exact, at the address [1] cbsnews.com

Overview, regulatory gates and specifications

Plans to convert the former Star Tribune Heritage Landing printing plant at 800 North 1st Street in Minneapolis, Hennepin County, Minnesota, into a data center were cancelled. [4] Filings on the record specify 1 planned or operational building. [1] Legacy Investing terminated purchase agreement for former Star Tribune printing facility [8]

Verified Site & Permit Summary
Verified address
800 North 1st Street, Minneapolis, MN 55401, Hennepin County verified address
Operator / developer
North Loop Redevelopment
Permit / registry ID
CBS News on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] cbsnews.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
North Loop Redevelopment as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

James Jorgenson

engineering drafting and design education assistant professor at Dunwoody College of Technology

DID Recorded statement at 5 EYEWITNESS NEWS (September 5, 2026) [6]
SAID James Jorgenson, an engineering drafting and design education assistant professor at Dunwoody College of Technology, said data centers affect daily life more than many people realize and it isn't just for AI. (September 5, 2026) [6]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: North Loop Redevelopment
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Former Star Tribune Printing Plant Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building agency filing [1] cbsnews.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Proposed redevelopment would have converted former printing facility into 20 megawatt data center

    [8] kstp.com

  2. Filing (source date; the content gives no date of its own)

    Legacy Investing withdrew land use application for proposed data center at former Star Tribune site

    [8] kstp.com

  3. (source date; the content gives no date of its own)

    Legacy Investing terminated purchase agreement for former Star Tribune printing facility

    [8] kstp.com

  4. (source date; the content gives no date of its own)

    Legacy Investing withdrew from a purchase agreement for a 20 megawatt data center at the former Star Tribune printing facility in the North Loop neighborhood.

    [10] mprnews.org

  5. (source date; the content gives no date of its own)

    Site is 13 acres in North Loop

    [7] finance-commerce.com

  6. (source date; the content gives no date of its own)

    Legacy Investing proposed 20 megawatt data center at former Star Tribune printing plant site

    [7] finance-commerce.com

  7. (source date; the content gives no date of its own)

    Legacy Investing ended purchase agreement for former Star Tribune printing plant

    [7] finance-commerce.com

  8. Filing (source date; the content gives no date of its own)

    Legacy Investing withdrew its application for a city conditional use permit and terminated its purchase agreement.

    [9] yahoo.com

2 earlier entries
  1. · cancelled Moratorium (source date; the content gives no date of its own)

    The former Star Tribune printing plant in Minneapolis' North Loop neighborhood is in talks to become the city's latest data center. The site is under the city's 350 thousand square foot moratorium limit.

    [6] kstp.com

  2. · proposed (content date)

    Developers proposed a data center at the former Star Tribune printing plant in the North Loop neighborhood of Minneapolis, drawing organized resident opposition at community meetings.

    [1] cbsnews.com

Every event in order

15 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Minnesota

Verified data center records in Minnesota within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Atomic Data Minneapolis Data Center (MSP250) Minneapolis, Hennepin County Less than 1 mi Running Atomic Data 4 MW
TriTech Center Carrier Hotel Minneapolis Minneapolis, Hennepin County Less than 1 mi Running DCI Technology 4 MW
T5 Data Centers Minneapolis (T5@Minneapolis) Minneapolis, Hennepin County Less than 1 mi Running T5 Data Centers 12 MW
Cologix Minneapolis Carrier Hotel Campus (MIN1 to MIN3) Minneapolis, Hennepin County 1 mi Running Cologix 15 MW
H5 Data Centers Twin Cities (Energy Park) St. Paul, Ramsey County 6 mi Running H5 Data Centers 6 MW
DataBank Twin Cities Edina Data Center (MSP1) Minneapolis, Hennepin County 9 mi Running DataBank 15 MW

Blank cell: not disclosed by any source on file.

Common questions about Former Star Tribune Printing Plant Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Former Star Tribune Printing Plant Data Center?

North Loop Redevelopment is the developer. No construction contractor is named on the record yet.

How much power and water does Former Star Tribune Printing Plant Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Former Star Tribune Printing Plant Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Data center developer walks away from plans to buy old printing facility in Minneapolis' North Loop - CBS News (opens in a new tab), CBS News, September 12, 2026, national outlet
  2. Residents react to data center developer scrapping plans to buy Minneapolis site - CBS News (opens in a new tab), CBS News, September 12, 2026, national outlet
  3. Data center plans canceled in Minneapolis - FOX 9 Minneapolis St. Paul (opens in a new tab), FOX 9 Minneapolis-St. Paul, September 11, 2026, local outlet
  4. Minneapolis North Loop residents express concerns over potential data center - CBS News (opens in a new tab), CBS News, August 19, 2026, national outlet
  5. North Loop residents question developers over proposed data center at former Star Tribune site - CBS News (opens in a new tab), CBS News, August 19, 2026, national outlet
  6. Most Minnesotans aren’t sold on data centers, but others say it’s not just AI that uses them - 5 EYEWITNESS NEWS (opens in a new tab), 5 EYEWITNESS NEWS, September 5, 2026, local outlet
  7. Data center developer pulls out of Strib plant purchase - finance commerce.com (opens in a new tab), finance-commerce.com, September 11, 2026, local outlet
  8. Minneapolis data center plan for former Star Tribune site dropped - 5 EYEWITNESS NEWS (opens in a new tab), 5 EYEWITNESS NEWS, September 12, 2026, local outlet
  9. Developer backs out of plan to convert former Star Tribune printing plant into data center - Bring Me The News (opens in a new tab), Bring Me The News, September 11, 2026, national outlet
  10. Developer withdraws proposed North Loop data center in former Star Tribune printing plant - MPR News (opens in a new tab), MPR News, September 11, 2026, local outlet
  11. Data center plans canceled in Minneapolis - fox9.com (opens in a new tab), fox9.com, September 11, 2026, local outlet
  12. ‘What’s in it for us?’ Residents slam data center plans for former Star Tribune printing plant - MPR News (opens in a new tab), MPR News, August 23, 2026, local outlet
1 more source
  1. North Loop residents pack community meeting over data center, and more headlines - CBS News (opens in a new tab), CBS News, August 20, 2026, national outlet

13 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Former Star Tribune Printing Plant Data Center", https://datacenterrecord.org/projects/former-star-tribune-printing-plant-data-center-minneapolis-mn, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Former Star Tribune Printing Plant Data Center", https://datacenterrecord.org/projects/former-star-tribune-printing-plant-data-center-minneapolis-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Stalled or cancelled
Tier
built from one source
Tags
Built from one source
Coordinates
44.98194, -93.26917
How the location is known
Location from the site's street address.
Location source
https://www.minneapolismn.gov/
Coordinate source
City of Minneapolis North Loop parcel
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed