DataBank Twin Cities Edina Data Center (MSP1)

Street address 7700 France Avenue South, Edina, MN 55435, Minneapolis, Hennepin County verified address Exact, at the address databank.com (opens in a new tab)

Overview, regulatory gates and specifications

DataBank operates the MSP1 commercial colocation data center at 7700 France Avenue South in the Minneapolis metro area, Hennepin County, Minnesota. [1] Filings on the record specify disclosed capacity of 15 MW (the developer's figure), 1 planned or operational building. [1] DataBank acquired the building housing MSP2 data center at 3255 Neil Armstrong Boulevard in Eagan Minnesota [4]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
15 MW
the developer's figure

Equivalent to ~12,450 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.7% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 7700 France Avenue South, Edina, MN 55435.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
15 MW developer figure Equivalent to the continuous electricity demand of about 12,500 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.1 percent of New York City's summer peak demand in 2024.
databank.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
databank.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2017 (9 years)
Who leads it
DataBank as stated by the source
Official project website
databank.com (opens in a new tab) verified October 28, 2026
databank.com (opens in a new tab)
Archived promotional websites
databank.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. DataBank Twin Cities Edina Data Center (MSP1), capacity: 15 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 15 ÷ 10,245 = 0.0015 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: DataBank
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for DataBank Twin Cities Edina Data Center (MSP1).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 15 MW 15 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    DataBank acquired the building housing MSP2 data center at 3255 Neil Armstrong Boulevard in Eagan Minnesota

    [4] prnewswire.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    DataBank lists DataBank Minneapolis data center at Minneapolis, Minnesota on its own page of data center locations, read September 14, 2026.

    [1] databank.com

1 correction to this record

Every correction, with its reason

Every correction on the record is on the corrections page.

Nearest data centers in Minnesota

Verified data center records in Minnesota within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
EdgeConneX Minneapolis Data Center (EDCMSP01) Eden Prairie, Hennepin County 4 mi Running EdgeConneX 5 MW
US Signal and OneNeck Eden Prairie Data Center (VISI) Eden Prairie, Hennepin County 4 mi Running OneNeck IT Solutions 8 MW
T5 Data Centers Minneapolis (T5@Minneapolis) Minneapolis, Hennepin County 8 mi Running T5 Data Centers 12 MW
Iron Gate Data Centers Eagan Eagan, Dakota County 8 mi Running Iron Gate Data Centers 6 MW
Cologix Minneapolis Carrier Hotel Campus (MIN1 to MIN3) Minneapolis, Hennepin County 8 mi Running Cologix 15 MW
TriTech Center Carrier Hotel Minneapolis Minneapolis, Hennepin County 9 mi Running DCI Technology 4 MW

Blank cell: not disclosed by any source on file.

Common questions about DataBank Twin Cities Edina Data Center (MSP1)

Answered directly from the verified filings and local actions on this page.

Who is building DataBank Twin Cities Edina Data Center (MSP1)?

DataBank is the developer. No construction contractor is named on the record yet.

How much power and water does DataBank Twin Cities Edina Data Center (MSP1) say it needs?

Power: 15 MW (the developer's figure, databank.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does DataBank Twin Cities Edina Data Center (MSP1) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, October 1, 2026: DataBank acquired the building housing MSP2 data center at 3255 Neil Armstrong Boulevard in Eagan Minnesota [4].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. DataBank: Data centers (opens in a new tab), DataBank, September 14, 2026

Reporting

  1. DataBank to expand MSP3 data center in Minneapolis, Minnesota - Data Center Dynamics (opens in a new tab), Data Center Dynamics, November 2, 2023, news outlet
  2. DataBank Plans 20MW Data Center in Minneapolis Market - Data Center Knowledge (opens in a new tab), Data Center Knowledge, June 23, 2014, news outlet
  3. DataBank Acquires Building Housing MSP2 Data Center in Minneapolis - PR Newswire (opens in a new tab), PR Newswire, October 1, 2026, press release

4 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "DataBank Twin Cities Edina Data Center (MSP1)", https://datacenterrecord.org/projects/databank-minneapolis-data-center-mn, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "DataBank Twin Cities Edina Data Center (MSP1)", https://datacenterrecord.org/projects/databank-minneapolis-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
44.862766, -93.330405
How the location is known
Location from the site's street address.
Location source
https://www.databank.com/data-centers/minneapolis/
Coordinate source
DataBank MSP1 France Avenue specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
15 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · DataBank Twin Cities Edina Data Center (MSP1) · 4 sources, 2 entries · basis and source tier on every row · verified October 27, 2026