Data Center Record.
Census GEOID: 47165 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 1 reporting sources

● Running Reported September 16, 2026 · 4 Buildings

Meta Gallatin Hyperscale Data Center Campus

Street address 1410 Hartsville Pike, Gallatin, TN 37066, Sumner County verified address Exact, at the address [1] Meta: Our U.S. data center fleet

Overview, regulatory gates and specifications

Meta operates its four building, 982,000 square foot hyperscale data center campus at 1410 Hartsville Pike in Gallatin, Sumner County, Tennessee. [1] Meta broke ground on Gallatin campus in 2020 and pledged more than $1.5 billion investment [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1410 Hartsville Pike, Gallatin, TN 37066.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[1] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2023 (3 years)
Who leads it
Meta as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Gallatin Hyperscale Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings 4 operator page [1] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

November 14, 2024 Gallatin, TN Meta opens data center in Gallatin Gallatin Industrial Development Board 3 clips

Gallatin Industrial Development Board approval record for property tax incentives and utility infrastructure supporting the $800 million Meta Gallatin data center campus (November 14, 2024).

  1. Gallatin Economic Development and Applicant Presentation (WKRN News 2 Report) Broadcast Report transcribed from local broadcast report
    "through those doors is where your profile lives meta also known as Facebook is now live in Gallatin $1.5 billion is invested in the state of Tennessee not only to house the state ofthe art data center but also to support gallon and suar County that we were able to accomplish it and get this fabulous company that has done so much"
  2. WKRN News 2 Broadcast Report Broadcast Report transcribed from local broadcast report
    "of dollars worth of contributions and donations eight years ago meta started the process of moving to gton under the name wool haulk in 2020 that's when they officially told the city of gton they were meta shocking city leaders oh my gosh we are in a new level of competition now according to meta it took 1,800 skilled workers to construct"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "infrastructure has everything they needed for the data center number one the access to fiber and renewable energy also a talented pool of trained and skilled construction workers and operational staff and most importantly great Community since groundbreaking meta has directly funded $1.4 million to suer County schools and nonprofits providing access to robotics equipment"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Meta Gallatin data center began serving global internet traffic in November 2024

    [2] yahoo.com

  2. (source date; the content gives no date of its own)

    Meta broke ground on Gallatin campus in 2020 and pledged more than $1.5 billion investment

    [2] yahoo.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta Gallatin Data Center at Gallatin, Tennessee on its own page of data center locations, read September 14, 2026.

    [1] datacenters.atmeta.com

Nearest data centers in Tennessee

Verified data center records in Tennessee within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
RadiusDC Nashville I Data Center Nashville, Davidson County 21 mi Being built RadiusDC 12 MW
EdgeConneX Nashville Data Center (EDCNAS01) Nashville, Davidson County 21 mi Running EdgeConneX 8 MW
H5 Data Centers Nashville Carrier Hotel (TN01) Nashville, Davidson County 23 mi Running H5 Data Centers 6 MW
TierPoint Downtown Nashville Data Center Nashville, Davidson County 23 mi Running TierPoint 4 MW
DC BLOX Grassmere Nashville Zoo Parcel Data Center Proposal Nashville, Davidson County 25 mi Stalled or cancelled DC Blox 1 building
Flexential Brentwood Data Center Campus (NAS01 and NAS04) Brentwood, Williamson County 34 mi Running Flexential 8 MW

Blank cell: not disclosed by any source on file.

Common questions about Meta Gallatin Hyperscale Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Meta Gallatin Hyperscale Data Center Campus?

Meta is the developer. No construction contractor is named on the record yet.

How much power and water does Meta Gallatin Hyperscale Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta Gallatin Hyperscale Data Center Campus stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 16, 2026: Meta Gallatin data center began serving global internet traffic in November 2024 [2].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026

Reporting

  1. Gallatin, home to Meta campus, weighs new data center moratorium - The Tennessean (opens in a new tab), The Tennessean, September 16, 2026, national outlet

2 sources on file.

Regional grid context

This site is in the SERC Tennessee Valley (SRTV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Gallatin Hyperscale Data Center Campus", https://datacenterrecord.org/projects/meta-gallatin-data-center-tn, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Gallatin Hyperscale Data Center Campus", https://datacenterrecord.org/projects/meta-gallatin-data-center-tn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
36.3801445, -86.4669573
How the location is known
Location from the site's street address.
Location source
https://datacenters.atmeta.com/us-locations/
Coordinate source
Sumner County Assessor / Meta
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta Gallatin Hyperscale Data Center Campus · 2 sources, 3 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON