H5 Data Centers operates its downtown Nashville carrier hotel and interconnection facility at 147 Fourth Avenue North in Nashville, Davidson County, Tennessee. [1] Filings on the record specify disclosed capacity of 6 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Tennessee state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]
Equivalent to ~4,980 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.3% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 147 Fourth Avenue North, Nashville, TN 37219.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for H5 Data Centers Nashville Carrier Hotel (TN01).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 6 MW | 6 MW | the developer's figure [1] h5datacenters.com |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] h5datacenters.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Davidson County and Nashville about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Nashville | U.S. District Judge Eli Richardson dismissed DC BLOX's nine claims against Metro Nashville's data center permitting moratorium, noting a perceived raw deal does not make a federal case, while granting 21 days until October 27, 2026 to replead three claims. | the901report.com (opens in a new tab) | |
| Nashville | D.C. Blox filed lawsuit against Nashville Davidson Metro claiming officials refusing to process permits in targeted attack violating federal constitutional protections | thecentersquare.com (opens in a new tab) | |
| Nashville | Nashville Davidson Metro placed temporary moratorium on data center development after D.C. Blox announced facility near Nashville Zoo | thecentersquare.com (opens in a new tab) | |
| Nashville | Nashville data center restrictions advanced after a record setting council meeting | wsmv.com (opens in a new tab) |
FOX Nashville report on Metropolitan Council of Nashville and Davidson County and community proceedings in Nashville, TN: New data center restrictions, moratorium up for final vote this week in Nashville (July 20, 2026).
"rules and boundaries for those data centers. Fox 17 news joins us live right now to break down where some of those different proposals stand right now. Hey, Jen and Justin. So Metro Council members in Nashville have multiple bills on their agendas this week regarding either restrictions or pauses or moratoriums on data centers in Davidson County. Tonight at the Metro Planning and Zoning Committee meeting, there's going to be three of"
"centers, placing noise size, water use and community impact rules on the new centers. Then there's also a moratorium or a pause, which council member Courtney Johnson tells Fox 17 news she's amending to hold up until December to give departments time to adapt. In order to give us time to get those reports in that are due at the end of August, and then to have a three reading ordinance, enough time to go through that process, assuming"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Tennessee state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
Verified data center records in Tennessee within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| TierPoint Downtown Nashville Data Center Nashville, Davidson County | Less than 1 mi | Running | TierPoint | 4 MW |
| EdgeConneX Nashville Data Center (EDCNAS01) Nashville, Davidson County | 4 mi | Running | EdgeConneX | 8 MW |
| RadiusDC Nashville I Data Center Nashville, Davidson County | 5 mi | Being built | RadiusDC | 12 MW |
| DC BLOX Grassmere Nashville Zoo Parcel Data Center Proposal Nashville, Davidson County | 6 mi | Stalled or cancelled | DC Blox | 1 building |
| Flexential Brentwood Data Center Campus (NAS01 and NAS04) Brentwood, Williamson County | 13 mi | Running | Flexential | 8 MW |
| Flexential Franklin Cool Springs Data Center Campus (NAS02 and NAS03) Franklin, Williamson County | 15 mi | Running | Flexential | 10 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
H5 Data Centers is the developer. No construction contractor is named on the record yet.
Power: 6 MW (the developer's figure, h5datacenters.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Nashville (rated restrictive): U.S. District Judge Eli Richardson dismissed DC BLOX's nine claims against Metro Nashville's data center permitting moratorium, noting a perceived raw deal does not make a federal case, while granting 21 days until October 27, 2026 to replead three claims (October 6, 2026, the901report.com (opens in a new tab)); and Nashville: D.C. Blox filed lawsuit against Nashville Davidson Metro claiming officials refusing to process permits in targeted attack violating federal constitutional protections (reported September 8, 2026, thecentersquare.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the SERC Tennessee Valley (SRTV) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. H5 Data Centers Nashville Carrier Hotel (TN01). Last verified October 27, 2026. https://datacenterrecord.org/projects/h5-data-centers-nashville-tn. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about H5 Data Centers Nashville Carrier Hotel (TN01)
Data Center Record, "H5 Data Centers Nashville Carrier Hotel (TN01)", https://datacenterrecord.org/projects/h5-data-centers-nashville-tn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.