Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 11 reporting sources
Imperial Valley Computer Manufacturing LLC proposed a 2 building, 330 MW AI data center campus on 74 acres in Imperial, Imperial County, California, where a California Superior Court ordered a full Environmental Impact Report under CEQA in September 2026. [1] Original recycled water cooling plan fell apart [5]
Equivalent to ~273,900 U.S. homes (U.S. EIA 830 homes/MW baseline) · 16% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 740 Industrial Way, Imperial, CA 92251.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Imperial Valley Computer Manufacturing AI Data Center Proposal.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 330 MW | the developer's figure [1] 8newsnow.com | |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 2 buildings | zoning filing [1] 8newsnow.com | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
Original recycled water cooling plan fell apart
(source date; the content gives no date of its own)
County Board of Supervisors approved a lot merger in April that paved the way for the data center project
· Status: proposed (source date; the content gives no date of its own)
The data center complex would include a giant battery system, a bank of natural gas generators and a new power substation, sitting directly next to the residential neighborhood of Victoria Ranch
· Status: permitting Filing (content date)
California's largest AI data center project filed a lawsuit seeking access to 287 million gallons of Colorado River water annually, representing 0.03% of Imperial Valley's supply, amid opposition over agricultural land and jobs concerns.
(source date; the content gives no date of its own)
Developer filed lawsuit seeking access to Colorado River water for cooling next generation computing infrastructure
· In court (source date; the content gives no date of its own)
Developer filed lawsuit against activist and environmental nonprofit for defamation and alleged greenmail
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
No other verified data center record in California is located within 60 miles of this site. Browse all data centers in California.
Answered directly from the verified filings and local actions on this page.
Imperial Valley Computer Manufacturing LLC is the developer, cleanview.co (opens in a new tab). No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: 330 MW (the developer's figure, 8newsnow.com (opens in a new tab)). Water: not disclosed by any source on file.
It is proposed, as reported September 10, 2026. The newest entry, reported September 12, 2026: Original recycled water cooling plan fell apart [5].
Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
11 sources on file.
This site is in the WECC California (CAMX) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Imperial Valley Computer Manufacturing AI Data Center Proposal. Last verified November 6, 2026. https://datacenterrecord.org/projects/imperial-valley-ai-data-center-ca. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Imperial Valley Computer Manufacturing AI Data Center Proposal
Data Center Record, "Imperial Valley Computer Manufacturing AI Data Center Proposal", https://datacenterrecord.org/projects/imperial-valley-ai-data-center-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.