Data Center Record.
Census GEOID: 48139 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 2 reporting sources

● Being Built Reported November 5, 2023 · 4 Buildings

Compass Red Oak campus

Street address 1500 N Central Blvd, Red Oak, TX 75154, Ellis County verified address Exact, at the address [1] U.S. Census Bureau TIGERweb city centroid, public domain

Overview, regulatory gates and specifications

Compass Datacenters lists a data center at Red Oak, Texas and says it is being built. [1] Filings on the record specify 4 planned or operational buildings. [1] Compass Datacenters lists Compass Red Oak campus at Red Oak, Texas on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Commercial data center facil
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
4 data center buildings verified via primary operator campus specification and EPA ECHO / TCEQ facility permit record

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1500 N Central Blvd, Red Oak, TX 75154.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings permitted
[1] compassdatacenters.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Compass Datacenters attributed via corporate HQ or property filing
[1] compassdatacenters.com
Permitted legal entity
Compass Datacenters Texas Operations what a permit allows
[1] compassdatacenters.com
State permit status
Commercial data center facility specification and local appraisal district property record (1500 N Central Blvd, Red Oak, TX 75154) the state's permit register, last verified November 9, 2026
[1] compassdatacenters.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Compass Datacenters · Applicant / Shell LLC: Compass Datacenters
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Compass Red Oak campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings 4 data center buildings verified via primary operator campus specification and EPA ECHO / TCEQ facility permit record [1] compassdatacenters.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

June 10, 2024 Red Oak, TX Red Oak approves data center despite heavy opposition from residents Red Oak City Council 3 clips

Red Oak City Council public hearing approving a hyperscale data center rezoning and infrastructure agreement in Ellis County despite resident opposition (June 10, 2024).

  1. WFAA Broadcast Report Broadcast Report transcribed from local broadcast report
    "like a lot of the others, that approval came after hearing from a packed room full of opposition. We don't need another data center. You don't know what the health impact is. You got them all crunched together. You're going to have a mass exit. You're going to ruin this community. You're going to ruin it. The council chamber filled with people, most all of them speaking against the proposal. So much so that the fire marshal had to close access to the"
  2. WFAA Broadcast Report Broadcast Report transcribed from local broadcast report
    "needed to pave the way for Compass Data Centers to build what will be the sixth data center project in the city on this piece of agricultural land. Like other communities, the residents speaking against it against it do not like the noise and environmental concerns connected to data centers. But council members say they've tried to tailor each proposal to the area and the use proposed for the project. The city manager has told us in the past that these data centers are self contained"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "All right, Chris, thank you for that. There's another community in the region looking at plans for a new data center today. Henderson County is the next place we could see contribute to the data center boom in Texas. It's about an hour and a half southeast of the metroplex. In a few hours, leaders there are set to weigh plans for a more than 400 acre facility before a vote. Again, this is just one more proposal in a wave of approved and planned projects. As we see that boom, Texas lawmakers are reviewing tax incentives, power grid demand, and community concerns ahead of"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Financing (source date; the content gives no date of its own)

    A Texas developer obtained $2 billion in financing to build Oracle data centers near Dallas

    [2] businessinsider.com

  2. · Status: being built (source date; the content gives no date of its own)

    Compass Datacenters Red Oak Campus phase two construction partnership with county

    [3] focusdailynews.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Compass Datacenters lists Compass Red Oak campus at Red Oak, Texas on its own page of data center locations, read September 14, 2026.

    [1] compassdatacenters.com

1 correction to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

Every correction on the record is on the corrections page.

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
DataBank Red Oak Campus Red Oak, Ellis County 1 mi Being built DataBank 480 MW
Google Red Oak data center Red Oak, Ellis County 2 mi Being built Google 1 building
STACK DFW02 Lancaster, Dallas County 3 mi Running STACK Infrastructure 2 buildings
QTS South Dallas Wilmer, Dallas County 7 mi Being built QTS Data Centers 3 buildings
Google Wilmer Data Center Wilmer, Dallas County 9 mi Running Google 1 building
Google Midlothian data center Midlothian, Ellis County 16 mi Running Google 375 acres

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Permanent jobs

1 figure, 1 source
Show each source's words
  • 10 jobs, Yahoo: Compass Datacenters estimates that a fully built 10 building campus would need about 300 onsite operations workers, with a larger estimate of more than 500 permanent jobs including engineers, accounting staff and other support workers

Common questions about Compass Red Oak campus

Answered directly from the verified filings and local actions on this page.

Who is building Compass Red Oak campus?

Compass Datacenters is the developer, compassdatacenters.com (opens in a new tab). No construction contractor is named on the record yet.

Who will use Compass Red Oak campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Compass Red Oak campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Compass Red Oak campus stand today?
What is still unknown about Compass Red Oak campus?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Compass Datacenters: Data center markets (opens in a new tab), Compass Datacenters, September 14, 2026

Reporting

  1. A Texas developer got a $2 billion loan to build Oracle data centers in the 'burbs - Business Insider (opens in a new tab), Business Insider, April 21, 2026, national outlet
  2. County Partners with Compass Datacenters for Phase 2 Construction of Red Oak Campus - Focus Daily News (opens in a new tab), Focus Daily News, November 5, 2023, news outlet

3 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Compass Red Oak campus", https://datacenterrecord.org/projects/compass-red-oak-campus-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Compass Red Oak campus", https://datacenterrecord.org/projects/compass-red-oak-campus-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
32.5315, -96.8045
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 14, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Compass Red Oak campus · 3 sources, 3 entries · basis and source tier on every row · verified November 9, 2026

Download CSV JSON