Google Red Oak data center

Street address 1000 E Ovilla Rd, Red Oak, TX 75154, Ellis County verified address Exact, at the address [3] U.S. Census Bureau TIGERweb city centroid, public domain

Overview, regulatory gates and specifications

Google lists a data center at Red Oak, Texas among the sites it operates. [1] Filings on the record specify 1 planned or operational building. [2] Updated project status from operational to under_construction: Google Red Oak campus (500 and 1000 E Ovilla Rd, EPA ECHO FRS 110071941623) remains in active construction and commissioning and does not report operational water withdrawal in the Google 2026 Environmental Report. [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
EPA ECHO Facility Registry R
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
183,562 gal/day
measured

Equivalent to ~612 U.S. households (U.S. EPA 300 gal/day household baseline).

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1000 E Ovilla Rd, Red Oak, TX 75154.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
67,000,000 gallons a year (withdrawal) permitted Equivalent to the annual water use of about 612 average U.S. households based on the U.S. Environmental Protection Agency baseline of 109,500 gallons per year per home, or about 102 Olympic size swimming pools of 660,000 gallons each. What at most 612 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
[1] sustainability.google
Land area
Not disclosed
Buildings
1 building operator page
[2] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
2024
Who leads it
Google attributed via corporate HQ or property filing
[2] datacenters.google
Permitted legal entity
Google Texas Operations what a permit allows
[3] echo.epa.gov
State air permit registration
FRS 110071941623, TX0000004813901674 state air permit register
State permit status
EPA ECHO Facility Registry Record FRS 110071941623 and Clean Air Act Permit ID TX0000004813901674 for Alamo Mission at 500 and 1000 E Ovilla Rd, Red Oak, TX 75154 the state's permit register, last verified November 9, 2026
[3] echo.epa.gov
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Red Oak data center, water: 67,000,000 gallons a year.
  2. 67,000,000 gallons a year ÷ 365 = 183,562 gallons a day.
  3. Water used at home each day by the average American family, more than: 300 gallons a day.
  4. 183,561.64 ÷ 300 = 611.87 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet · Applicant / Shell LLC: Google
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Red Oak data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building operator page [2] datacenters.google
Cooling & Water System 67,000,000 gal/yr measured [1] sustainability.google
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

June 10, 2024 Red Oak, TX Red Oak approves data center despite heavy opposition from residents Red Oak City Council 3 clips

Red Oak City Council public hearing approving a hyperscale data center rezoning and infrastructure agreement in Ellis County despite resident opposition (June 10, 2024).

  1. WFAA Broadcast Report Broadcast Report transcribed from local broadcast report
    "like a lot of the others, that approval came after hearing from a packed room full of opposition. We don't need another data center. You don't know what the health impact is. You got them all crunched together. You're going to have a mass exit. You're going to ruin this community. You're going to ruin it. The council chamber filled with people, most all of them speaking against the proposal. So much so that the fire marshal had to close access to the"
  2. WFAA Broadcast Report Broadcast Report transcribed from local broadcast report
    "needed to pave the way for Compass Data Centers to build what will be the sixth data center project in the city on this piece of agricultural land. Like other communities, the residents speaking against it against it do not like the noise and environmental concerns connected to data centers. But council members say they've tried to tailor each proposal to the area and the use proposed for the project. The city manager has told us in the past that these data centers are self contained"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "All right, Chris, thank you for that. There's another community in the region looking at plans for a new data center today. Henderson County is the next place we could see contribute to the data center boom in Texas. It's about an hour and a half southeast of the metroplex. In a few hours, leaders there are set to weigh plans for a more than 400 acre facility before a vote. Again, this is just one more proposal in a wave of approved and planned projects. As we see that boom, Texas lawmakers are reviewing tax incentives, power grid demand, and community concerns ahead of"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: being built (content date)

    Updated project status from operational to under_construction: Google Red Oak campus (500 and 1000 E Ovilla Rd, EPA ECHO FRS 110071941623) remains in active construction and commissioning and does not report operational water withdrawal in the Google 2026 Environmental Report.

    [3] echo.epa.gov

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Red Oak data center at Red Oak, Texas on its own page of data center locations, read September 14, 2026.

    [2] datacenters.google

1 correction to this record

Every correction, with its reason
  1. · Project status

    Updated stage from operational to under_construction: while Google Midlothian reports 2025 operational water withdrawal in the Google 2026 Environmental Report, the Red Oak campus on East Ovilla Road remains under active construction and commissioning.

Every correction on the record is on the corrections page.

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
DataBank Red Oak Campus Red Oak, Ellis County 1 mi Being built DataBank 480 MW
Compass Red Oak campus Red Oak, Ellis County 2 mi Being built Compass Datacenters 4 buildings
STACK DFW02 Lancaster, Dallas County 4 mi Running STACK Infrastructure 2 buildings
QTS South Dallas Wilmer, Dallas County 8 mi Being built QTS Data Centers 3 buildings
Google Wilmer Data Center Wilmer, Dallas County 9 mi Running Google 1 building
Google Midlothian data center Midlothian, Ellis County 16 mi Running Google 375 acres

Blank cell: not disclosed by any source on file.

Common questions about Google Red Oak data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Red Oak data center?

Google is the developer, datacenters.google (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Google Red Oak data center say it needs?

Power: not disclosed by any source on file. Water: 67,000,000 gallons a year (withdrawal) (measured, sustainability.google (opens in a new tab)).

Where does Google Red Oak data center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google 2026 Environmental Report (Page 97: Water use by data center location, 2025) (opens in a new tab), Google
  2. Google: Data center locations (opens in a new tab), Google, September 14, 2026
  3. US EPA ECHO Detailed Facility Report 110071941623 (Alamo Mission, CAA ID TX0000004813901674, E Ovilla Rd, Red Oak, TX) (opens in a new tab), U.S. Environmental Protection Agency, November 9, 2026

3 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Red Oak data center", https://datacenterrecord.org/projects/google-red-oak-data-center-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Red Oak data center", https://datacenterrecord.org/projects/google-red-oak-data-center-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
32.5095, -96.7915
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
How water was disclosed
measured
Published
September 14, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows