Data Center Record.

Running Reviewed in depth

Google Wilmer Data Center

Wilmer, Dallas County, TXDeveloper: GoogleCensus GEOID 48113

Stage
Running
Buildings
1 building
operator page
Undisclosed in public filings
Power, Land

Google operates the Wilmer data center in Wilmer, Dallas County, Texas, reported in the Google 2026 Environmental Report with 2.6 million gallons of annual water withdrawal in 2025. It is running; the record holds no sourced date for when it reached that stage.

How much power it needs and who would use it have not been disclosed.

Last verified · 3 sources, 3 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Running, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 66 other published records in Texas
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building operator page
[1] sustainability.google
Water
2,600,000 gallons a year (withdrawal) measured What at most 24 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
[1] sustainability.google
Who leads it
Google as stated by the source
How it is cooled
Air cooled as stated by the source
[1] sustainability.google
Undisclosed in public filings
Land, Power it would draw, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Wilmer Data Center, water: 2,600,000 gallons a year.
  2. 2,600,000 gallons a year ÷ 365 = 7,123 gallons a day.
  3. Water used at home each day by the average American family, more than: 300 gallons a day.
  4. 7,123.29 ÷ 300 = 23.74 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use 2,600,000 gallons a year (withdrawal) measured [1] sustainability.google (opens in a new tab) October 24, 2026
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Google as stated by the source October 24, 2026
Who is constructing it
How much land
Buildings 1 building operator page [1] sustainability.google (opens in a new tab) October 24, 2026
Where its power comes from
Grid connection
How it is cooled Air cooled as stated by the source [1] sustainability.google (opens in a new tab) October 24, 2026

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

No dated entry is on the record yet.

  • Read on October 24, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from primary EPA ECHO or operator record.

    [1] sustainability.google

The site

Where in Wilmer is not in the public record. The pin marks the center of Wilmer, not a building, and the outline is Dallas County.

The site map is at the top of the page.

Where
Wilmer, Dallas County, Texas
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Google Wilmer Data Center?

The record has one measure of its size: 1 building (operator page, sustainability.google (opens in a new tab)). Its power capacity is not disclosed.

Who is building Google Wilmer Data Center?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google Wilmer Data Center say it needs?

Power: not disclosed by any source on file. Water: 2,600,000 gallons a year (withdrawal) (measured, sustainability.google (opens in a new tab)).

Where does Google Wilmer Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Wilmer or Dallas County decided about it?

No decision by Wilmer or Dallas County about data centers is on the record. The Dallas County page and the Texas scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Google 2026 Environmental Report (Page 97: Water use by data center location, 2025) (opens in a new tab), Google 2026 Environmental Report, June 1, 2026
  2. Google 2026 Environmental Report (Page 97 & Page 116, Endnote 235 / 226) (opens in a new tab), Google 2026 Environmental Report, June 1, 2026
  3. Google 2026 Environmental Report (Page 97: Water use by data center location, 2025) (opens in a new tab), Google 2026 Environmental Report, June 1, 2026

3 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Google Wilmer Data Center", https://datacenterrecord.org/projects/google-wilmer-data-center-tx, last verified October 24, 2026. CSV · JSON
Cite this page

Data Center Record, "Google Wilmer Data Center", https://datacenterrecord.org/projects/google-wilmer-data-center-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
32.6012, -96.6784
How the location is known
Location is the city center; exact site not disclosed.
Location source
Google 2026 Environmental Report (Page 97) disclosing operational facility in Wilmer, Dallas County, Texas.
Coordinate source
census gazetteer place point
Cooling
Air cooled
How water was disclosed
measured
Published
October 21, 2026
Last verified
October 24, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Google Wilmer Data Center · 3 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 24, 2026

Download CSV JSON