Google is developing a data center in West Memphis, Arkansas, involving a power agreement with Entergy and utility rate implications for West Memphis Utilities ratepayers, with associated legal disputes over disclosure of financial records. [5] Filings on the record specify 2 planned or operational buildings. [1] Entergy Arkansas filed heavily redacted amended application for Google West Memphis data center project. [5]
How much power it needs, how much water it would use and who would use it have not been disclosed.
Connected government officials, corporate entities, utilities and local rules on the public record.
While the projects are a key component of the supply solution needed to serve Google's project expansion, they will be used to serve all customers(October 31, 2026) arkansasonline.com (opens in a new tab)
exceed, and thereby fully offset, the costs associated with the projects(October 31, 2026) arkansasonline.com (opens in a new tab)
Entergy claimed the documents were released in error by state regulators and contained confidential trade secret information.(September 17, 2026) [34]
Seth Stern, chief of advocacy for the Freedom of the Press Foundation, said Entergy's lawsuit was meritless.(September 17, 2026) [33]
View all 63 statements on the record in Arkansas →
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google West Memphis Data Center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 2 buildings | Site filing [1] datacenters.google | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
Filing (content date)
Entergy Arkansas filed heavily redacted amended application for Google West Memphis data center project.
arkansasonline.com (opens in a new tab) local outlet
(source date; the content gives no date of its own)
Entergy and Google began talks about a data center in West Memphis; three months later, work on the Generating Arkansas Jobs Act began
(source date; the content gives no date of its own)
Google exploring second potential data center project in Little Rock
(source date; the content gives no date of its own)
Google partnership with Entergy Arkansas is for 20 years
(source date; the content gives no date of its own)
Construction on Google West Memphis facility has been ongoing for nearly a year
(source date; the content gives no date of its own)
Groundbreaking for the solar farm took place July 11.
(source date; the content gives no date of its own)
A federal judge denied Entergy's request to block publication of agreement details earlier in September 2026.
(source date; the content gives no date of its own)
Entergy Arkansas filed a notice of dismissal of its lawsuit against the Arkansas Democrat Gazette, Arkansas Times, and a resident over publication of details from a West Memphis data center agreement.
(source date; the content gives no date of its own)
Entergy Arkansas filed and then dismissed a lawsuit against the Arkansas Democrat Gazette, Arkansas Times and Jessica Kivell over publication of details about its data center agreement with Altitude Capital LLC.
(source date; the content gives no date of its own)
Google is exploring a potential data center project in Little Rock
(source date; the content gives no date of its own)
Construction is already underway on Google's data center in West Memphis
(source date; the content gives no date of its own)
Construction work was continuing at the Google project on June 1, 2026
(source date; the content gives no date of its own)
Judge Lee Rudofsky denied Entergy request for a restraining order against the news outlets
(source date; the content gives no date of its own)
Google's data center in West Memphis is under construction
(source date; the content gives no date of its own)
Google data center agreement with Entergy has 20 year term
(source date; the content gives no date of its own)
U.S. District Judge Lee Rudofsky denied Entergy's request for a temporary restraining order on September 2, 2026
(source date; the content gives no date of its own)
Special rate contract between Google and Entergy approved by Arkansas Public Service Commission in December
(source date; the content gives no date of its own)
Google West Memphis data center campus will have five data centers, office buildings on approximately 1,200 acres
(source date; the content gives no date of its own)
U.S. District Judge Lee Rudofsky expected to rule Wednesday September 3 2026 on Entergy's request to stop Arkansas Democrat-Gazette from publishing data center details
(source date; the content gives no date of its own)
Arkansas Cypress is expected to begin operating by the end of 2028
(source date; the content gives no date of its own)
Google's West Memphis data center is served under special rate agreement between Entergy Arkansas and Altitude LLC, a Google subsidiary.
(source date; the content gives no date of its own)
Arkansas Public Service Commission approved Arkansas Cypress project earlier in 2026.
(source date; the content gives no date of its own)
Arkansas Cypress project is expected to begin operating by the end of 2028.
(source date; the content gives no date of its own)
Total package tied to Google's West Memphis data center is $716 million, with $190 million designated for transmission system upgrades.
(source date; the content gives no date of its own)
Google will contribute $526 million toward Entergy Arkansas' Arkansas Cypress Solar and Battery project.
(source date; the content gives no date of its own)
Google agreed to purchase initial electricity output from Steel River Energy Center solar project near Wilson in Mississippi County
(source date; the content gives no date of its own)
First two phases will add three million solar panels, estimated for completion by early to mid 2028
(source date; the content gives no date of its own)
Steel River Energy Center held ceremonial groundbreaking July 14, 2026
(source date; the content gives no date of its own)
(source date; the content gives no date of its own)
Initial build out takes 18 to 24 months to complete
(source date; the content gives no date of its own)
Construction began in October 2025 on first of possible five buildings
(source date; the content gives no date of its own)
Site is 1,100 acres in West Memphis industrial park
(source date; the content gives no date of its own)
Google announced a $4 billion investment in West Memphis data center in fall 2025
(source date; the content gives no date of its own)
Google is developing a $4 billion data center campus in West Memphis
(source date; the content gives no date of its own)
West Memphis signed a nondisclosure agreement for a data center project on June 3, 2024
(source date; the content gives no date of its own)
Google and Entergy keeping energy rate contract secret
(source date; the content gives no date of its own)
Google data center campus in West Memphis with projected cost of $4 billion
(source date; the content gives no date of its own)
Google announced grants for West Memphis area
Filing (source date; the content gives no date of its own)
Project originally called Project Pyramid, filed permit application December 2024 for five building campus on 1,178 acres along Bollinger Road
(source date; the content gives no date of its own)
Groot LLC awarded 30 year payment in lieu of taxes by West Memphis City Council in May 2025 covering up to $10 billion in construction costs
(source date; the content gives no date of its own)
Data center located approximately 3 miles south of Interstate 55
(source date; the content gives no date of its own)
Google data center project at 1500 South Loop Dr. in West Memphis announced October 2025
(source date; the content gives no date of its own)
Google announced the first recipients of the West Memphis Energy Impact Fund on April 28, 2026
(source date; the content gives no date of its own)
The fund was announced last year to help scale energy saving and affordability initiatives for residents in Crittenden County and surrounding areas
(source date; the content gives no date of its own)
Google announced first two recipients of West Memphis Energy Impact Fund
(source date; the content gives no date of its own)
West Memphis Utilities to provide water and wastewater, Entergy Arkansas to provide power
(source date; the content gives no date of its own)
Google started construction of $4 billion data center campus in West Memphis
(source date; the content gives no date of its own)
Google is hiring for West Memphis data center positions
(source date; the content gives no date of its own)
Project expected to take 18 to 24 months to complete
(source date; the content gives no date of its own)
Project is Google's first data center in Arkansas
(source date; the content gives no date of its own)
Facility is on 1,100 acre property at 1500 South Loop Drive near Mississippi River
(source date; the content gives no date of its own)
Google began construction in October 2025 on West Memphis data center
(source date; the content gives no date of its own)
Google to build a data center in Arkansas
(source date; the content gives no date of its own)
Google broke ground on West Memphis data center project on October 2, 2025
(source date; the content gives no date of its own)
Google broke ground on $4 billion West Memphis data center on October 2, 2025
(source date; the content gives no date of its own)
Google broke ground on a $4 billion data center in West Memphis on October 2, 2025
(source date; the content gives no date of its own)
First data center building expected to be completed within 18 to 24 months
(source date; the content gives no date of its own)
Data center campus on 1,100 acres in West Memphis
(source date; the content gives no date of its own)
Google announcing $4 billion investment in Arkansas through 2027 including first data center in West Memphis
(source date; the content gives no date of its own)
Google plans to partner with the state to offer AI training and credentials to over 10,000 Arkansans
(source date; the content gives no date of its own)
Construction of the data center is expected to take up to two years
(source date; the content gives no date of its own)
The data center is expected to span 1,000 acres in West Memphis
(source date; the content gives no date of its own)
(source date; the content gives no date of its own)
(source date; the content gives no date of its own)
Google's project includes building a greywater plant to reuse water to cool equipment
· being built (content date)
(source date; the content gives no date of its own)
Google is the developer of the West Memphis data center project in Arkansas
· Citation
Cites the later report of the same claim by the same speaker (said again on October 8, 2025; the record's rules, October 10, 2026).
· Citation
Cites the later report of the same claim by the same speaker (said again on October 2, 2025; the record's rules, October 10, 2026).
· Citation
Cites the later report of the same claim by the same speaker (said again on September 3, 2026; the record's rules, October 10, 2026).
· Citation
Cites the later report of the same claim by the same speaker (said again on April 28, 2026; the record's rules, October 10, 2026).
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article
Speaker read again from the statement's source line, "Judge Lee Rudofsky": the title in front of the name (Judge) is the role, not part of the name.
· Speaker
Speaker read again from the statement's source line, "Judge Lee Rudofsky": the title in front of the name (Judge) is the role, not part of the name.
Speaker read again from the statement's source line, "Entergy (via Beth Hunt, news anchor)": the comma inside the parenthesis is part of it, not the break between name and role.
Every correction on the record is on the corrections page.
No other verified data center record in Arkansas is located within 60 miles of this site. Browse all data centers in Arkansas.
commercialappeal.com, Oct 2, 2025; commercialappeal.com, Apr 28, 2026; pv magazine USA, Sep 23, 2026
blog.google, Oct 2, 2025; commercialappeal.com, Apr 28, 2026; The Arkansas Democrat-Gazette, Sep 1, 2026; Action News 5, Sep 2, 2026; CNBC, Sep 2, 2026; pv magazine USA, Sep 23, 2026
YouTube, Oct 2, 2025; arkansasonline.com, Oct 2, 2025 (opens in a new tab); commercialappeal.com, Apr 28, 2026
YouTube, Oct 2, 2025; YouTube, Jun 23, 2026 (opens in a new tab)
Answered directly from the verified filings and local actions on this page.
Google is the developer, datacenters.google (opens in a new tab). No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is being built, as reported September 9, 2025. The newest entry, October 21, 2026: Entergy Arkansas filed heavily redacted amended application for Google West Memphis data center project.
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Official operator or facility campus page verified in 50 state website discovery pass.
64 sources on file.
This site is in the SERC Mississippi Valley (SRMV) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Google West Memphis Data Center. Last verified November 6, 2026. https://datacenterrecord.org/projects/google-west-memphis-data-center-ar. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Google West Memphis Data Center
Data Center Record, "Google West Memphis Data Center", https://datacenterrecord.org/projects/google-west-memphis-data-center-ar. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.