Data Center Record.
Census GEOID: 05035 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and 62 reporting sources

● Being Built Reported September 9, 2025 · 2 Buildings

Google West Memphis Data Center

Street address 3800 Highway 77 South, West Memphis Industrial Site, West Memphis, AR 72301, Crittenden County verified address Exact, at the address [2] County seat (Marion), Wikidata, placed at county level

Overview, regulatory gates and specifications

Google is developing a data center in West Memphis, Arkansas, involving a power agreement with Entergy and utility rate implications for West Memphis Utilities ratepayers, with associated legal disputes over disclosure of financial records. [5] Filings on the record specify 2 planned or operational buildings. [1] Entergy Arkansas filed heavily redacted amended application for Google West Memphis data center project. [5]

Verified Site & Permit Summary
Verified address
3800 Highway 77 South, West Memphis Industrial Site, West Memphis, AR 72301, Crittenden County verified address
Operator / developer
Google
Permit / registry ID
WREG.com on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 600 MW (commercialappeal.com (opens in a new tab), pv magazine USA (opens in a new tab)); 1,000 MW (pv magazine USA (opens in a new tab), commercialappeal.com (opens in a new tab)), and 5 more under Comparisons. Their figure, not the record's.
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
$526 million developer figure
[22] cnbc.com
Who leads it
Google as stated by the source
[1] datacenters.google
Where its power comes from
utility special rate agreement as stated by the source
[38] pv-magazine-usa.com
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Kristin Dalrymple

Vice President of Business Operations · Entergy

DID Recorded statement at Regulatory filing with Arkansas Public Service Commission (October 31, 2026)
SAID While the projects are a key component of the supply solution needed to serve Google's project expansion, they will be used to serve all customers (October 31, 2026) arkansasonline.com (opens in a new tab)

David Hunt

Entergy official · Entergy

DID Recorded statement at Regulatory filing with Arkansas Public Service Commission (October 31, 2026)
SAID exceed, and thereby fully offset, the costs associated with the projects (October 31, 2026) arkansasonline.com (opens in a new tab)

Entergy Arkansas

Public Record Speaker

DID Recorded statement at kjnbtv.com (September 17, 2026) [34]
SAID Entergy claimed the documents were released in error by state regulators and contained confidential trade secret information. (September 17, 2026) [34]

Seth Stern

Freedom of the Press Foundation

DID Recorded statement at Little Rock Public Radio KUAR (September 17, 2026) [33]
SAID Seth Stern, chief of advocacy for the Freedom of the Press Foundation, said Entergy's lawsuit was meritless. (September 17, 2026) [33]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: utility special rate agreement

View all 63 statements on the record in Arkansas →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google West Memphis Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings Site filing [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Filing (content date)

    Entergy Arkansas filed heavily redacted amended application for Google West Memphis data center project.

    arkansasonline.com (opens in a new tab) local outlet

  2. (source date; the content gives no date of its own)

    Entergy and Google began talks about a data center in West Memphis; three months later, work on the Generating Arkansas Jobs Act began

    [37] arkansasonline.com

  3. (source date; the content gives no date of its own)

    Google exploring second potential data center project in Little Rock

    [35] actionnews5.com

  4. (source date; the content gives no date of its own)

    Google partnership with Entergy Arkansas is for 20 years

    [35] actionnews5.com

  5. (source date; the content gives no date of its own)

    Construction on Google West Memphis facility has been ongoing for nearly a year

    [35] actionnews5.com

  6. (source date; the content gives no date of its own)

    Groundbreaking for the solar farm took place July 11.

    [36] myarklamiss.com

  7. (source date; the content gives no date of its own)

    A federal judge denied Entergy's request to block publication of agreement details earlier in September 2026.

    [34] kjnbtv.com

  8. (source date; the content gives no date of its own)

    Entergy Arkansas filed a notice of dismissal of its lawsuit against the Arkansas Democrat Gazette, Arkansas Times, and a resident over publication of details from a West Memphis data center agreement.

    [34] kjnbtv.com

59 earlier entries
  1. (source date; the content gives no date of its own)

    Entergy Arkansas filed and then dismissed a lawsuit against the Arkansas Democrat Gazette, Arkansas Times and Jessica Kivell over publication of details about its data center agreement with Altitude Capital LLC.

    [33] ualrpublicradio.org

  2. (source date; the content gives no date of its own)

    Google is exploring a potential data center project in Little Rock

    [31] 4029tv.com

  3. (source date; the content gives no date of its own)

    Construction is already underway on Google's data center in West Memphis

    [31] 4029tv.com

  4. (source date; the content gives no date of its own)

    Construction work was continuing at the Google project on June 1, 2026

    [12] arkansasonline.com

  5. (source date; the content gives no date of its own)

    Judge Lee Rudofsky denied Entergy request for a restraining order against the news outlets

    · Google · Reported September 3, 2026 · Privacy enhanced player · loads on click

    [62] youtube.com

  6. (source date; the content gives no date of its own)

    Google's data center in West Memphis is under construction

    [5] yahoo.com

  7. (source date; the content gives no date of its own)

    Google data center agreement with Entergy has 20 year term

    [19] arkansasadvocate.com

  8. (source date; the content gives no date of its own)

    U.S. District Judge Lee Rudofsky denied Entergy's request for a temporary restraining order on September 2, 2026

    [20] kait8.com

  9. (source date; the content gives no date of its own)

    Special rate contract between Google and Entergy approved by Arkansas Public Service Commission in December

    [21] actionnews5.com

  10. (source date; the content gives no date of its own)

    Google West Memphis data center campus will have five data centers, office buildings on approximately 1,200 acres

    [21] actionnews5.com

  11. (source date; the content gives no date of its own)

    U.S. District Judge Lee Rudofsky expected to rule Wednesday September 3 2026 on Entergy's request to stop Arkansas Democrat-Gazette from publishing data center details

    [29] arkansasonline.com

  12. (source date; the content gives no date of its own)

    Arkansas Cypress is expected to begin operating by the end of 2028

    [28] deltaplexnews.com

  13. (source date; the content gives no date of its own)

    Google's West Memphis data center is served under special rate agreement between Entergy Arkansas and Altitude LLC, a Google subsidiary.

    [28] deltaplexnews.com

  14. (source date; the content gives no date of its own)

    Arkansas Public Service Commission approved Arkansas Cypress project earlier in 2026.

    [28] deltaplexnews.com

  15. (source date; the content gives no date of its own)

    Arkansas Cypress project is expected to begin operating by the end of 2028.

    [28] deltaplexnews.com

  16. (source date; the content gives no date of its own)

    Total package tied to Google's West Memphis data center is $716 million, with $190 million designated for transmission system upgrades.

    [28] deltaplexnews.com

  17. (source date; the content gives no date of its own)

    Google will contribute $526 million toward Entergy Arkansas' Arkansas Cypress Solar and Battery project.

    [28] deltaplexnews.com

  18. (source date; the content gives no date of its own)

    Google agreed to purchase initial electricity output from Steel River Energy Center solar project near Wilson in Mississippi County

    [14] arkansasonline.com

  19. (source date; the content gives no date of its own)

    First two phases will add three million solar panels, estimated for completion by early to mid 2028

    [53] commercialappeal.com

  20. (source date; the content gives no date of its own)

    Steel River Energy Center held ceremonial groundbreaking July 14, 2026

    [53] commercialappeal.com

  21. (source date; the content gives no date of its own)

    Data center property is located south of West Memphis city limits

    · Google · Reported June 5, 2026 · Privacy enhanced player · loads on click

    [61] youtube.com

  22. (source date; the content gives no date of its own)

    Initial build out takes 18 to 24 months to complete

    [50] arkansasonline.com

  23. (source date; the content gives no date of its own)

    Construction began in October 2025 on first of possible five buildings

    [50] arkansasonline.com

  24. (source date; the content gives no date of its own)

    Site is 1,100 acres in West Memphis industrial park

    [50] arkansasonline.com

  25. (source date; the content gives no date of its own)

    Google announced a $4 billion investment in West Memphis data center in fall 2025

    [50] arkansasonline.com

  26. (source date; the content gives no date of its own)

    Google is developing a $4 billion data center campus in West Memphis

    [7] arkansasonline.com

  27. (source date; the content gives no date of its own)

    West Memphis signed a nondisclosure agreement for a data center project on June 3, 2024

    [7] arkansasonline.com

  28. (source date; the content gives no date of its own)

    Google and Entergy keeping energy rate contract secret

    [6] arkansasonline.com

  29. (source date; the content gives no date of its own)

    Google data center campus in West Memphis with projected cost of $4 billion

    [6] arkansasonline.com

  30. (source date; the content gives no date of its own)

    Google announced grants for West Memphis area

    [13] wreg.com

  31. Filing (source date; the content gives no date of its own)

    Project originally called Project Pyramid, filed permit application December 2024 for five building campus on 1,178 acres along Bollinger Road

    [57] commercialappeal.com

  32. (source date; the content gives no date of its own)

    Groot LLC awarded 30 year payment in lieu of taxes by West Memphis City Council in May 2025 covering up to $10 billion in construction costs

    [57] commercialappeal.com

  33. (source date; the content gives no date of its own)

    Data center located approximately 3 miles south of Interstate 55

    [57] commercialappeal.com

  34. (source date; the content gives no date of its own)

    Google data center project at 1500 South Loop Dr. in West Memphis announced October 2025

    [57] commercialappeal.com

  35. (source date; the content gives no date of its own)

    Google announced the first recipients of the West Memphis Energy Impact Fund on April 28, 2026

    [55] commercialappeal.com

  36. (source date; the content gives no date of its own)

    The fund was announced last year to help scale energy saving and affordability initiatives for residents in Crittenden County and surrounding areas

    [54] actionnews5.com

  37. (source date; the content gives no date of its own)

    Google announced first two recipients of West Memphis Energy Impact Fund

    [52] talkbusiness.net

  38. (source date; the content gives no date of its own)

    West Memphis Utilities to provide water and wastewater, Entergy Arkansas to provide power

    [10] arkansasonline.com

  39. (source date; the content gives no date of its own)

    Google started construction of $4 billion data center campus in West Memphis

    [10] arkansasonline.com

  40. (source date; the content gives no date of its own)

    Google is hiring for West Memphis data center positions

    [9] wreg.com

  41. (source date; the content gives no date of its own)

    Project expected to take 18 to 24 months to complete

    [51] actionnews5.com

  42. (source date; the content gives no date of its own)

    Project is Google's first data center in Arkansas

    [51] actionnews5.com

  43. (source date; the content gives no date of its own)

    Facility is on 1,100 acre property at 1500 South Loop Drive near Mississippi River

    [51] actionnews5.com

  44. (source date; the content gives no date of its own)

    Google began construction in October 2025 on West Memphis data center

    [51] actionnews5.com

  45. (source date; the content gives no date of its own)

    Google to build a data center in Arkansas

    [16] wsj.com

  46. (source date; the content gives no date of its own)

    Google broke ground on West Memphis data center project on October 2, 2025

    [8] bizjournals.com

  47. (source date; the content gives no date of its own)

    Google broke ground on $4 billion West Memphis data center on October 2, 2025

    [15] wreg.com

  48. (source date; the content gives no date of its own)

    Google broke ground on a $4 billion data center in West Memphis on October 2, 2025

    [11] businessfacilities.com

  49. (source date; the content gives no date of its own)

    First data center building expected to be completed within 18 to 24 months

    [59] commercialappeal.com

  50. (source date; the content gives no date of its own)

    Data center campus on 1,100 acres in West Memphis

    [59] commercialappeal.com

  51. (source date; the content gives no date of its own)

    Google announcing $4 billion investment in Arkansas through 2027 including first data center in West Memphis

    [58] blog.google

  52. (source date; the content gives no date of its own)

    Google plans to partner with the state to offer AI training and credentials to over 10,000 Arkansans

    [56] katv.com

  53. (source date; the content gives no date of its own)

    Construction of the data center is expected to take up to two years

    [56] katv.com

  54. (source date; the content gives no date of its own)

    The data center is expected to span 1,000 acres in West Memphis

    [56] katv.com

  55. (source date; the content gives no date of its own)

    The project is expected to take 18 to 24 months to complete

    · Google · Reported October 2, 2025 · Privacy enhanced player · loads on click

    [64] youtube.com

  56. (source date; the content gives no date of its own)

    Google's project includes adding solar power and battery storage

    · Google · Reported October 2, 2025 · Privacy enhanced player · loads on click

    [64] youtube.com

  57. (source date; the content gives no date of its own)

    Google's project includes building a greywater plant to reuse water to cool equipment

    · Google · Reported October 2, 2025 · Privacy enhanced player · loads on click

    [64] youtube.com

  58. · being built (content date)

    Google broke ground on a data center in West Memphis

    · Google · October 2, 2025 · Privacy enhanced player · loads on click

    [63] youtube.com

  59. (source date; the content gives no date of its own)

    Google is the developer of the West Memphis data center project in Arkansas

    [4] datacenterdynamics.com

Every event in order

115 corrections to this record

Every correction, with its reason
  1. · Citation

    Cites the later report of the same claim by the same speaker (said again on October 8, 2025; the record's rules, October 10, 2026).

  2. · Citation

    Cites the later report of the same claim by the same speaker (said again on October 2, 2025; the record's rules, October 10, 2026).

  3. · Citation

    Cites the later report of the same claim by the same speaker (said again on September 3, 2026; the record's rules, October 10, 2026).

  4. · Citation

    Cites the later report of the same claim by the same speaker (said again on April 28, 2026; the record's rules, October 10, 2026).

  5. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  6. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  7. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  8. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  9. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  10. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  11. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  12. · Project summary

    the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article

  13. · Speaker role

    Speaker read again from the statement's source line, "Judge Lee Rudofsky": the title in front of the name (Judge) is the role, not part of the name.

  14. · Speaker

    Speaker read again from the statement's source line, "Judge Lee Rudofsky": the title in front of the name (Judge) is the role, not part of the name.

  15. · Speaker role

    Speaker read again from the statement's source line, "Entergy (via Beth Hunt, news anchor)": the comma inside the parenthesis is part of it, not the break between name and role.

See all 102 corrections for this record (87 more) →

Every correction on the record is on the corrections page.

Nearest data centers in Arkansas

No other verified data center record in Arkansas is located within 60 miles of this site. Browse all data centers in Arkansas.

Comparisons

3 metrics with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

5 figures, 9 sources
Show each source's words
  • 1 GW, commercialappeal.com: Initial phase requires under 1 gigawatt of electricity
  • 1 GW, commercialappeal.com: First phase of West Memphis data center requires close to 1 gigawatt of electricity
  • 1 GW, pv magazine USA: Entergy planning to build over 1,000 MW of new natural gas capacity alongside solar procurement
  • 900 MW, commercialappeal.com: Initial phase construction will be 900 megawatts of electricity split between batteries and solar at 600 megawatts and 350 megawatts respectively
  • 600 MW, blog.google: 600 MW solar project with Entergy
  • 600 MW, commercialappeal.com: 600 megawatts to come from Entergy Arkansas
  • 600 MW, The Arkansas Democrat-Gazette: Cypress Solar facility is 600 megawatt solar and 350 megawatt battery capacity
  • 600 MW, Action News 5: Cypress Solar facility is 600 megawatts solar and 350 megawatts battery
  • 600 MW, CNBC: Cypress Solar facility is described as 600 megawatt solar field and 350 megawatt battery facility
  • 600 MW, pv magazine USA: Cypress Solar project 600 MW with 350 MW battery system
  • 350 MW, KVOM 101.7: Arkansas Cypress is planned as a 600 megawatt solar facility paired with 350 megawatts of battery storage near Pine Bluff.
  • 350 MW, KVOM 101.7: Arkansas Cypress is a 600 megawatt solar facility paired with 350 megawatts of battery storage
  • 300 MW, commercialappeal.com: 300 megawatts from battery storage and solar power panels

Project footprint

4 figures, 6 sources
1,178 acres Reported

YouTube, Jun 5, 2026

580 acres Reported

YouTube, Jun 5, 2026

Show each source's words
  • 1,178 acres, YouTube: Full property is 1,178 acres
  • 1,100 acres, YouTube: Data center is being built on an 1,100 acre property at 1500 South Loop Drive
  • 1,100 acres, arkansasonline.com: Data center campus located on 1,100 acres
  • 1,100 acres, commercialappeal.com: Data center site is 1,100 acres
  • 1,000 acres, YouTube: Data center site spans over 1,000 acres of land in West Memphis
  • 1,000 acres, YouTube: Proposed data center development area in West Memphis spans over 1,000 acres
  • 580 acres, YouTube: Main data center campus will be 580 acres

Permanent jobs

1 figure, 1 source
Show each source's words
  • 300 jobs, Action News 5: Project expected to bring 300 jobs to the area

Common questions about Google West Memphis Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Google West Memphis Data Center?

Google is the developer, datacenters.google (opens in a new tab). No construction contractor is named on the record yet.

Who will use Google West Memphis Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Google West Memphis Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google West Memphis Data Center stand today?
What is still unknown about Google West Memphis Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026
  2. US EPA ECHO and Arkansas Division of Environmental Quality Permit & Parcel Record (3800 Highway 77 South, West Memphis Industrial Site, West Memphis, AR 72301) (opens in a new tab), U.S. Environmental Protection Agency and Arkansas Division of Environmental Quality, November 6, 2026

Reporting

  1. New Data Center Developments: November 2025 - Data Center Knowledge (opens in a new tab), Data Center Knowledge, November 4, 2025, news outlet
  2. Google confirmed to be behind West Memphis data center project in Arkansas (opens in a new tab), Data Center Dynamics, September 9, 2025, trade press
  3. West Memphis Utilities: No rate increase because of Google - WREG.com (opens in a new tab), WREG.com, September 3, 2026, national outlet
  4. Google, Entergy keeping energy rate contract secret for $4 billion West Memphis project - The Arkansas Democrat Gazette (opens in a new tab), arkansasonline.com, May 3, 2026, local outlet
  5. Data center non disclosure agreements broad, secretive - The Arkansas Democrat Gazette (opens in a new tab), arkansasonline.com, May 12, 2026, local outlet
  6. Google breaks ground on $4B West Memphis project, largest in Ark. history (opens in a new tab), The Business Journals, October 2, 2025, local outlet
  7. Google hiring for West Memphis data center (opens in a new tab), WREG.com, February 26, 2026, local outlet
  8. West Memphis hopes Arkansas incentives attract new facility, thousands of jobs - The Arkansas Democrat Gazette (opens in a new tab), arkansasonline.com, April 24, 2026, local outlet
  9. Google breaks ground on $4B data center in West Memphis (opens in a new tab), Action News 5, October 2, 2025, news outlet
  10. OPINION | GUEST COLUMN: Harvey Couch versus the data centers - The Arkansas Democrat Gazette (opens in a new tab), The Arkansas Democrat-Gazette, September 6, 2026, local outlet
  11. Google announces grants for West Memphis area (opens in a new tab), WREG.com, April 28, 2026, local outlet
  12. Google to purchase power from new Steel River solar project in Mississippi County - The Arkansas Democrat Gazette (opens in a new tab), arkansasonline.com, July 14, 2026, local outlet
50 more sources
  1. Google breaks ground on $4B West Memphis, AR data center (opens in a new tab), WREG.com, October 2, 2025, local outlet
  2. Google to Build Data Center in Arkansas (opens in a new tab), WSJ, October 2, 2025, national outlet
  3. Arkansas lawmakers question utility on data center projects, impact on ratepayers - Arkansas Advocate (opens in a new tab), Arkansas Advocate, September 16, 2026, local outlet
  4. Entergy loses bid to block Google deal reporting - Axios (opens in a new tab), Axios, September 3, 2026, national outlet
  5. Judge denies effort to block Arkansas outlets from publishing details about data center agreement - Arkansas Advocate (opens in a new tab), Arkansas Advocate, September 2, 2026, local outlet
  6. Federal judge denies Entergy a temporary restraining order to block reporting on West Memphis data center agreement - K8 News | Jonesboro, Arkansas (opens in a new tab), K8 News | Jonesboro, Arkansas, September 2, 2026, local outlet
  7. Docs reveal plans for $6 utility rate hike to help fund Google’s data center project in West Memphis - Action News 5 (opens in a new tab), Action News 5, September 2, 2026, local outlet
  8. Judge refuses to block Arkansas news reporting on Google data center energy documents - CNBC (opens in a new tab), CNBC, September 2, 2026, national outlet
  9. Entergy Sues to Block Release of Financial Details in Google Arkansas Data Center Project - KVOM 101.7 (opens in a new tab), KVOM 101.7, September 2, 2026, local outlet
  10. Entergy Sues to Block Publication of Google Data Center Financial Records Amid Trade Secret Dispute - Deltaplex News (opens in a new tab), Deltaplex News, September 2, 2026, local outlet
  11. Entergy files to stop disclosure of West Memphis data center agreement - WREG.com (opens in a new tab), WREG.com, September 2, 2026, social media
  12. In a panic over mistakenly shared documents, Entergy lawyers ask judge to restrain journalists - Arkansas Times (opens in a new tab), Arkansas Times, September 2, 2026, local outlet
  13. Entergy Arkansas Asks Federal Judge to Block Publication of Google Data Center Agreement - Arkansas Business (opens in a new tab), Arkansas Business, September 1, 2026, local outlet
  14. Google Invests $526 Million in Arkansas Solar and Battery Project to Power Data Center - Deltaplex News (opens in a new tab), Deltaplex News, September 1, 2026, local outlet
  15. Judge expected to rule Wednesday on Entergy’s request to stop Democrat-Gazette from publishing data center info - arkansasonline.com (opens in a new tab), arkansasonline.com, September 1, 2026, local outlet
  16. Judge weighing whether to block Arkansas news outlets from publishing data center pact details (opens in a new tab), Little Rock Public Radio KUAR, September 2, 2026, local outlet
  17. Google representative in Little Rock to talk future of data centers in Arkansas - KHBS (opens in a new tab), KHBS, September 16, 2026, news outlet
  18. AR lawmakers question Entergy on Google data center power costs, ratepayer impact - KATV (opens in a new tab), KATV, September 16, 2026, local outlet
  19. Entergy Arkansas drops lawsuit over newspaper’s publication of data center agreement details (opens in a new tab), Little Rock Public Radio KUAR, September 17, 2026, local outlet
  20. Entergy Arkansas drops lawsuit over West Memphis data center agreement details - kjnbtv.com (opens in a new tab), kjnbtv.com, September 17, 2026, local outlet
  21. Lawmakers question West Memphis data center project’s impact on Entergy ratepayers - Action News 5 (opens in a new tab), Action News 5, September 18, 2026, local outlet
  22. Arkansas Public Service Commission denies Entergy’s request to purchase power from a planned solar facility - FOX16.com (opens in a new tab), FOX16.com, September 17, 2026, news outlet
  23. Seeds sown in 2024 for Generating Arkansas Jobs Act, Entergy’s Google deal - The Arkansas Democrat Gazette (opens in a new tab), The Arkansas Democrat-Gazette, September 20, 2026, local outlet
  24. Google's "Fair Share Plus" data center deal with Entergy sparks Arkansas ratepayer concerns - pv magazine USA (opens in a new tab), pv magazine USA, September 23, 2026, news outlet
  25. West Memphis Utilities outlines its role in Google data center project amid public concern - KATV (opens in a new tab), KATV, September 4, 2026, local outlet
  26. West Memphis Utilities issues statement to ease concerns about perceived bill increase tied to Google data center - localmemphis.com (opens in a new tab), localmemphis.com, September 3, 2026, news outlet
  27. Google’s Arkansas Data Center Reveals the Huge Power Bill Behind AI. Entergy Stands to Benefit - Yahoo Finance (opens in a new tab), Yahoo Finance, September 3, 2026, national outlet
  28. Judge says ‘no’ to Arkansas utility in freedom of the press fight - Oklahoma Energy Today (opens in a new tab), Oklahoma Energy Today, September 3, 2026, news outlet
  29. Judge Rejects Entergy Request to Block Publication of Google Data Center Financial Records - KVOM 101.7 (opens in a new tab), KVOM 101.7, September 3, 2026, local outlet
  30. Google’s contribution was at issue in Arkansas regulators’ review of Entergy contract - arkansasonline.com (opens in a new tab), arkansasonline.com, September 3, 2026, local outlet
  31. Court fight ensues over new documents about Google and Arkansas data center - Oklahoma Energy Today (opens in a new tab), Oklahoma Energy Today, September 2, 2026, news outlet
  32. Federal judge denies Entergy Arkansas’ request for temporary restraining order against Arkansas Democrat-Gazette - arkansasonline.com (opens in a new tab), arkansasonline.com, September 2, 2026, local outlet
  33. Entergy Arkansas alleges ‘serious and careless mathematical error’ in Google West Memphis data center reporting - FOX16.com (opens in a new tab), FOX16.com, September 2, 2026, local outlet
  34. Arkansas judge rules against Entergy in fight over released FOIA records for West Memphis data center - KARK (opens in a new tab), KARK, September 2, 2026, local outlet
  35. Entergy asks judge to block Arkansas news outlets' publication of 'confidential' Google data center info - thv11.com (opens in a new tab), thv11.com, September 2, 2026, news outlet
  36. Google data center poises West Memphis for boom; project bond issue totals could reach $60 billion - The Arkansas Democrat Gazette (opens in a new tab), arkansasonline.com, June 4, 2026, local outlet
  37. Google hiring for new West Memphis data center (opens in a new tab), Action News 5, February 26, 2026, local outlet
  38. Google hands out money from West Memphis Energy Impact Fund (opens in a new tab), Talk Business & Politics, April 28, 2026, local outlet
  39. Google backs nation's largest solar project for West Memphis data center (opens in a new tab), commercialappeal.com, July 14, 2026, local outlet
  40. Google announces first recipients of West Memphis Energy Impact Fund (opens in a new tab), Action News 5, April 28, 2026, local outlet
  41. See photos from Google's West Memphis Energy Impact Fund event (opens in a new tab), commercialappeal.com, April 28, 2026, local outlet
  42. Google's $4 billion data center to transform West Memphis (opens in a new tab), KATV, October 2, 2025, local outlet
  43. Google announces recipients for $25M West Memphis Energy Impact Fund (opens in a new tab), commercialappeal.com, April 28, 2026, local outlet
  44. Google is investing in Arkansas with a new data center, energy efficiency programs and more. (opens in a new tab), blog.google, October 2, 2025, news outlet
  45. Google to invest $4 billion in data center project in West Memphis. Everything we know (opens in a new tab), commercialappeal.com, October 2, 2025, local outlet
  46. Google Invests $526 Million in Arkansas Solar and Battery Project to Power Data Center - KVOM 101.7 (opens in a new tab), KVOM 101.7, September 1, 2026, local outlet
  47. Google's West Memphis data center (opens in a new tab), YouTube, June 5, 2026, video
  48. Entergy sues Democrat Gazette, AR Times for publishing secret Google data center details (opens in a new tab), YouTube, September 3, 2026, video
  49. Google breaks ground on $4B West Memphis, AR data center (opens in a new tab), YouTube, video
  50. Google breaks ground on $4B data center in West Memphis (opens in a new tab), YouTube, video

64 sources on file.

Regional grid context

This site is in the SERC Mississippi Valley (SRMV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google West Memphis Data Center", https://datacenterrecord.org/projects/google-west-memphis-data-center-ar, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google West Memphis Data Center", https://datacenterrecord.org/projects/google-west-memphis-data-center-ar. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
35.1185, -90.2145
How the location is known
Location from the site's street address.
Location source
County seat (Marion), Wikidata, placed at county level
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Google West Memphis Data Center · 64 sources, 67 entries · basis and source tier on every row · verified November 6, 2026