Data Center Record.
States / Arkansas / Statements

What was said about data centers in Arkansas

84 statements from 45 speakers, grouped by who spoke. Each appears as said, with the date and the source. No verdict is attached.

From October 2, 2025 to September 23, 2026. Statements from every state are on Statements.

Data center companies 13

Developers, operators and builders of data centers and the technology companies that fill them, speaking through their staff and spokespeople. Every state.

  • Google energy market development

    Rachel Wilson, energy market development representative for Google, told Arkansas lawmakers that Google's data centers support more than artificial intelligence development, powering Google Search, YouTube, Gmail and Google Maps

    September 16, 2026 · KHBS local outlet · the record (Paraphrased; said in the source itself)

  • Google said the $526 million figure represents upfront payments and that ongoing payments will continue throughout the agreement

    September 3, 2026 · KVOM 101.7 local outlet · the record (Paraphrased; said in the source itself)

  • Google spokesperson

    Google statement: Google is fully committed to covering 100 percent of the power and infrastructure costs for West Memphis data center, with ongoing monthly rates over the 20 year agreement completely funding operational footprint

    September 2, 2026 · KVOM 101.7 local outlet · the record (Paraphrased; said in the source itself)

    Also reported by 1 source: WREG.com national outlet

  • Google spokesperson stated Google is committed to covering 100% of power and infrastructure costs, with upfront payments totaling $526 million and ongoing monthly rates over a 20 year agreement

    September 2, 2026 · K8 News | Jonesboro, Arkansas local outlet · the record (Paraphrased; said in the source itself)

  • Google providing $25 million energy efficiency fund for electric bills and home weatherization

    June 4, 2026 · arkansasonline.com local outlet · the record (Paraphrased; said in the source itself)

  • Katie Ottenweller, regional head of energy market development at Google, said the Community Energy Advisory Council ensures the West Memphis Energy Impact Fund remains rooted in local needs

    April 29, 2026 · Entergy local outlet · the record (Paraphrased; said in the source itself)

  • Google is building a data center in West Memphis

    April 28, 2026 · fox13memphis.com local outlet · the record (Paraphrased; said in the source itself)

    Also reported by 1 source: Action News 5 local outlet

  • Google will partner with ICF and Entergy Arkansas to support approximately 200 residents whose homes need critical pre weatherization repairs

    April 28, 2026 · Action News 5 local outlet · the record (Paraphrased; said in the source itself)

  • Katie Ottenweller, regional head of energy market development for Google, said the most effective community investments are grounded in true partnership and expressed thrall at announcing first partners

    April 28, 2026 · Action News 5 local outlet · the record (Paraphrased; said in the source itself)

  • Katie Ottenweller, Lead of Energy Market Development for U.S. Eastern Region at Google, spoke during the event

    April 28, 2026 · commercialappeal.com local outlet · the record (Paraphrased; said in the source itself)

  • Google offering no cost access to Google AI courses and Career Certificates for all Arkansas residents in partnership with Arkansas Department of Commerce

    October 2, 2025 · blog.google local outlet · the record (Paraphrased; said in the source itself)

Government 25

Officials in office, lawmakers, regulators, public agencies and courts, federal, state, tribal and local. Every state.

  • Pulaski County Justice of the Peace

    Julie Blackwood, JP, says AVAIO will not be grandfathered in and must go through county regulations.

    September 23, 2026 · Arkansas Times local outlet · the record (Paraphrased; said in the source itself)

  • Judge Lee P. Rudofsky denied Entergy's request for an injunction to prohibit use or disclosure of documents on September 2, 2026.

    September 17, 2026 · KARK local outlet (Paraphrased; said in the source itself)

  • Republican State Senator

    Matt McKee, Republican senator, questioned why Entergy was recouping costs for Cypress Solar from regular ratepayers through the rider when Entergy claimed Google was covering all costs associated with serving data centers under the Fair Share Plus pledge.

    September 16, 2026 · Arkansas Advocate local outlet · the record (Paraphrased; said in the source itself)

  • U.S. Representative

    Vasquez backed the House passed Ratepayer Protection Act to encourage utility regulators to make large electricity users pay associated infrastructure costs.

    September 16, 2026 · www.quiverquant.com local outlet · the record (Paraphrased; said in the source itself)

  • U.S. Representative

    Vasquez introduced a bill to end certain tax breaks for large data centers.

    September 16, 2026 · www.quiverquant.com local outlet · the record (Paraphrased; said in the source itself)

  • Republican State Senator

    Mark Johnson reported that his Entergy power bill included an added $22.81 from a new rider tacked onto power bills in summer 2026.

    September 16, 2026 · Arkansas Advocate local outlet · the record (Paraphrased; said in the source itself)

  • Republican State Senator

    Mark Johnson, Republican senator and co chair of the Joint Energy Committee, criticized Entergy for suing the Arkansas Democrat Gazette over First Amendment reporting on power agreements with Google and noted his disappointment with the lawsuit.

    September 16, 2026 · Arkansas Advocate local outlet · the record (Paraphrased; said in the source itself)

  • U.S. Representative

    Rep. Gabe Vasquez stands with local residents and leaders calling for a temporary moratorium on data centers in Grant County.

    September 16, 2026 · www.facebook.com local outlet · the record (Paraphrased; said in the source itself)

  • U.S. Representative, R-Arkansas

    U.S. Rep. Bruce Westerman, R Arkansas, said data centers get a bad rap and issues can be resolved when everyone is on their A game.

    September 13, 2026 · The Arkansas Democrat-Gazette local outlet (Paraphrased; said in the source itself)

  • State Representative District 45

    State Representative Aaron Pilkington presenting on data centers to Arkansas Legislative Black Caucus

    September 9, 2026 · deltaplexnews.com local outlet (Paraphrased; said in the source itself)

  • Lee Rudofsky

    Judge said case involves issue of significant public concern and public utility arrangements with data centers have repercussions across state

    September 2, 2026 · CNBC national outlet · the record (Paraphrased; said in the source itself)

  • Commission rejected Entergy's proposed accounting treatment for Google's upfront payments, requiring portions of agreement to be renegotiated.

    September 1, 2026 · KVOM 101.7 local outlet · the record (Paraphrased; said in the source itself)

  • District 4 Justice of the Peace Julie Blackwood said ordinance is necessary to avoid county vulnerability to data center impacts

    August 27, 2026 · katv.com local outlet · the record (Paraphrased; said in the source itself)

  • Madison County Quorum Court

    The moratorium allows the county to investigate data centers, digital asset mining businesses, and similar large scale digital compute based operations and the costs and benefits of such projects

    August 24, 2026 · KNWA FOX24 national outlet (Paraphrased; said in the source itself)

  • West Memphis City Attorney Mike Stephenson said Google requested an NDA

    May 12, 2026 · arkansasonline.com local outlet · the record (Paraphrased; said in the source itself)

  • West Memphis Mayor Marco McClendon participated in the event

    April 28, 2026 · commercialappeal.com local outlet · the record (Paraphrased; said in the source itself)

  • West Memphis mayor says Google and Buc ee's projects are moving as scheduled

    March 25, 2026 · WREG.com local outlet · the record (Paraphrased; said in the source itself)

  • Governor of Arkansas

    Governor Sarah Sanders says West Memphis is a hardworking community that deserves the resources and recognition brought by Google's investment

    October 8, 2025 · YouTube video · the record (Paraphrased; said in the source itself)

  • Gov. Sarah Huckabee Sanders, Governor of Arkansas, says there is no better place for this investment than in West Memphis

    October 2, 2025 · YouTube video · the record (Paraphrased; said in the source itself)

  • Governor of Arkansas

    Governor Sarah Huckabee Sanders said Google's investment is the largest capital investment in Arkansas history

    October 2, 2025 · KATV local outlet · the record (Paraphrased; said in the source itself)

  • West Memphis Mayor Marco McClendon said the project will bring high tech jobs and benefits to the community

    October 2, 2025 · KATV local outlet · the record (Paraphrased; said in the source itself)

  • Marco McClendon, Mayor of West Memphis, says the Google data center is the biggest investment in the state of Arkansas

    October 2, 2025 · YouTube video · the record (Paraphrased; said in the source itself)

  • Marco McClendon, West Memphis Mayor

    Google will use local union workers for construction contract work

    October 2, 2025 · commercialappeal.com local outlet · the record (Paraphrased; said in the source itself)

Chief executives 8

Chief executives, presidents, founders and chairs of companies, in technology, data centers, power and elsewhere. Every state.

  • Ruth Porat, Google President, Chief Investment Officer

    Google states it is collaborating with Entergy to ensure it covers the full cost of powering the facility

    September 3, 2026 · YouTube video · the record (Paraphrased; said in the source itself)

  • Google executive Ruth Porat said at 2025 groundbreaking that Google would cover the full cost of powering the West Memphis facility

    September 3, 2026 · Gadget Review national outlet · the record (Paraphrased; said in the source itself)

  • Doug McGowen, MLGW President and CEO

    MLGW customers have seen no electric rate increase due to data centers in Memphis operated by SpaceXAI and other companies

    September 3, 2026 · WREG.com national outlet · the record (Paraphrased; said in the source itself)

  • Laura Landreaux, president and CEO of Entergy Arkansas

    The partnership involves Entergy Arkansas, Google, and ICF working together to deliver energy efficiency improvements

    April 29, 2026 · Entergy local outlet · the record (Paraphrased; said in the source itself)

  • Drew Marsh, Chair and CEO, Entergy, says Google's investment will put Arkansas at the forefront of American innovation as the new facility joins Google's global network

    October 8, 2025 · YouTube video · the record (Paraphrased; said in the source itself)

  • Andrew Marsh, Entergy Corp. CEO, says the partnership drives economic development and builds communities

    October 2, 2025 · YouTube video · the record (Paraphrased; said in the source itself)

  • Entergy Arkansas President and CEO Laura Landreaux said Google's investment will bring unprecedented economic opportunity to Arkansas

    October 2, 2025 · KATV local outlet · the record (Paraphrased; said in the source itself)

  • Drew Marsh, chair and CEO of Entergy

    Entergy Arkansas partnering to power the project

    October 2, 2025 · arkansasonline.com local outlet · the record (Paraphrased; said in the source itself)

Utilities and grid operators 16

Electric utilities, cooperatives and the operators of the power grid, and the people who speak for them. Every state.

  • Entergy Arkansas

    Entergy claimed the documents were released in error by state regulators and contained confidential trade secret information.

    September 17, 2026 · kjnbtv.com local outlet · the record (Paraphrased; said in the source itself)

  • Lamor Williams, Entergy Arkansas spokesperson

    Entergy says documents about West Memphis data center agreement with Altitude Capital were confidential trade secrets released in error

    September 17, 2026 · Little Rock Public Radio local outlet · the record (Paraphrased; said in the source itself)

  • LLC

    Entergy dismissed federal court complaint against Jessica Kivell and two publications regarding details about plans for a Google data center that were accidentally released by the Arkansas Public Service Commission on September 17, 2026.

    September 17, 2026 · KARK local outlet (Paraphrased; said in the source itself)

  • John Bethel, Entergy Arkansas director of public affairs, stated that the rider shifts up costs that ratepayers would eventually pay and saves ratepayers money by reducing interest and other costs that increase over time.

    September 16, 2026 · Arkansas Advocate local outlet · the record (Paraphrased; said in the source itself)

  • John Bethel, Entergy director of public affairs

    Entergy representative stated that ratepayers could see rate increases as Entergy builds facilities needed to serve the data center, but costs would stabilize once construction is complete

    September 16, 2026 · KHBS local outlet · the record (Paraphrased; said in the source itself)

  • David Palmer, Entergy Arkansas vice president of regulatory affairs, stated that the need to ensure Cypress Solar was built in time for the data center to go online on schedule, plus pursuit of tax credits, played into the decision to recoup costs from ratepayers.

    September 16, 2026 · Arkansas Advocate local outlet · the record (Paraphrased; said in the source itself)

  • Entergy director of public affairs

    John Bethel, Entergy's director of public affairs, said Google has not publicly disclosed the energy requirement figure for the West Memphis data center

    September 16, 2026 · KHBS local outlet · the record (Paraphrased; said in the source itself)

  • West Memphis Utilities

    Google is financially responsible for utility infrastructure required to serve the West Memphis data center

    September 3, 2026 · WREG.com national outlet · the record (Paraphrased; said in the source itself)

  • Bob Atkins General Manager

    West Memphis Utilities assures customers they will not see a rate increase because of Google's data center

    September 3, 2026 · WREG.com national outlet · the record (Paraphrased; said in the source itself)

  • Entergy stated remaining two thirds of Cypress Solar project costs would be covered by Arkansas ratepayers via a proposed approximately $6 per month utility rate increase

    September 3, 2026 · Gadget Review national outlet · the record (Paraphrased; said in the source itself)

  • Entergy Arkansas

    Entergy stated the agreement includes approximately $443 million in upfront payments and at least $83 million annually over 20 years, totaling more than $2.1 billion

    September 3, 2026 · KVOM 101.7 local outlet · the record (Paraphrased; said in the source itself)

  • Entergy alleged Google's project will provide more than $1.1 billion in net benefits to Arkansas residents

    September 2, 2026 · K8 News | Jonesboro, Arkansas local outlet · the record (Paraphrased; said in the source itself)

  • AEP Ohio data center power demand pipeline dropped by more than half following state rules with grid connection study fees

    September 2, 2026 · The Arkansas Democrat-Gazette local outlet (Paraphrased; said in the source itself)

  • Entergy Arkansas filed a federal lawsuit seeking to restrict publication of information tied to Google's West Memphis data center, including financial details involving the Arkansas Cypress Solar and Battery project in Jefferson County

    September 2, 2026 · KVOM 101.7 local outlet · the record (Paraphrased; said in the source itself)

  • Exelon cut high probability data center demand by about 40 percent to 11 gigawatts after stricter collateral requirements

    September 2, 2026 · The Arkansas Democrat-Gazette local outlet (Paraphrased; said in the source itself)

  • Entergy alleged confidential information involving its agreements with Altitude Capital LLC, a Google subsidiary, was released by the Arkansas Public Service Commission through a public records request

    September 2, 2026 · KVOM 101.7 local outlet · the record (Paraphrased; said in the source itself)

Candidates and campaigns 2

People running for office, their campaigns and their parties. A candidate who does not hold the office is not an official. Every state.

  • Wendell Griffen, Pulaski County Judge Democratic nominee, helped write the ordinance

    August 27, 2026 · katv.com local outlet · the record (Paraphrased; said in the source itself)

  • Wendell Griffin, Democratic nominee for Pulaski County Judge, held a news conference August 25 calling for new data center regulations.

    August 25, 2026 · KATV local outlet (Paraphrased; said in the source itself)

Business groups and unions 1

Chambers of commerce, trade associations and labor unions. Every state.

  • president and chief executive officer, Little Rock Regional Chamber of Commerce

    Jay Chesshir, president and chief executive officer of Little Rock Regional Chamber of Commerce, said NDAs have been a part of economic development work for decades

    May 12, 2026 · arkansasonline.com local outlet · the record (Paraphrased; said in the source itself)

Advocates and residents 4

Advocacy and community groups on every side, residents, neighbors and people speaking at public meetings. Every state.

  • community observer

    Jerry Damerow recommended baseline noise studies before construction to establish benchmarks for data center operations

    August 23, 2026 · arkansasonline.com local outlet · the record (Paraphrased; said in the source itself)

  • community observer

    Jerry Damerow called for baseline air quality and humidity tests before construction and before generators start operating

    August 23, 2026 · arkansasonline.com local outlet · the record (Paraphrased; said in the source itself)

  • community observer

    Jerry Damerow stated that state law prohibits banning data centers, so the focus should be on regulations rather than moratoriums

    August 23, 2026 · arkansasonline.com local outlet · the record (Paraphrased; said in the source itself)

  • director of state and local policy, American Economic Liberties Project

    Pat Garafalo, director of state and local policy at the American Economic Liberties Project, said nondisclosure agreements are extremely problematic from an economic and democratic standpoint

    May 12, 2026 · arkansasonline.com local outlet · the record (Paraphrased; said in the source itself)

Researchers and analysts 2

Universities, research institutes, think tanks, pollsters, economists and consultants. Every state.

  • assistant professor of rural development, University of Arkansas Division of Agriculture

    Study by Frank Seo examined economic impacts of AI data centers versus auto and food manufacturing in Arkansas statewide and in four rural counties: Calhoun, Dallas, Newton, and Woodruff.

    August 17, 2026 · magnoliabannernews.com local outlet (Paraphrased; said in the source itself)

  • Frank Seo, assistant professor of rural development, University of Arkansas Division of Agriculture

    Data centers compare favorably with auto and food manufacturing facilities in terms of overall economic output at statewide level but generate fewer employment spillovers than traditional manufacturing.

    August 17, 2026 · magnoliabannernews.com local outlet (Paraphrased; said in the source itself)

Other voices 13

Journalists, lawyers, former officials, and speakers the source describes in words that name none of the groups above. Every state.

  • Seth Stern, chief of advocacy for the Freedom of the Press Foundation, said Entergy's lawsuit was meritless.

    September 17, 2026 · Little Rock Public Radio KUAR local outlet · the record (Paraphrased; said in the source itself)

  • Lee Wolverton, Arkansas Democrat Gazette Executive Editor, said the First Amendment held true in the case.

    September 17, 2026 · Little Rock Public Radio KUAR local outlet · the record (Paraphrased; said in the source itself)

  • <UNKNOWN>

    Arkansas lawmaker forms trade association focused on AI and data center policy

    September 10, 2026 · KATV local outlet (Paraphrased; said in the source itself)

  • Kutak Rock partner Alexander T. Jones authored an article on the rise of data centers in Arkansas, published in Summer 2026 issue of The Arkansas Lawyer

    September 8, 2026 · Kutak Rock local outlet (Paraphrased; said in the source itself)

  • Alexander T. Jones, Kutak Rock partner

    The article examines the rapid growth of hyperscale data center development in Arkansas and legal and economic issues accompanying the industry's expansion

    September 8, 2026 · Kutak Rock local outlet (Paraphrased; said in the source itself)

  • Guy Lancaster, guest columnist

    Silicon Valley billionaires want to build data centers across Arkansas

    September 6, 2026 · The Arkansas Democrat-Gazette local outlet · the record (Paraphrased; said in the source itself)

  • Arkansas Democrat-Gazette

    The Google data center is intended to power the company's search and artificial intelligence capabilities

    September 6, 2026 · The Arkansas Democrat-Gazette local outlet · the record (Paraphrased; said in the source itself)

  • Andrew Mobley, reporter

    Entergy says Democrat Gazette made a mathematical error by accounting for only 12 months of payments rather than the full 20 year term

    September 3, 2026 · YouTube video · the record (Paraphrased; said in the source itself)

  • Andrew Mobley, reporter

    Democrat Gazette reported Google will pay Entergy about one third of the cost to build the solar plant powering the data center

    September 3, 2026 · YouTube video · the record (Paraphrased; said in the source itself)

  • Entergy (via Beth Hunt, news anchor)

    Entergy stated Google is fully committed to covering 100 percent of the power and infrastructure costs associated with the data center

    September 3, 2026 · YouTube video · the record (Paraphrased; said in the source itself)

  • DivTeck101

    Data centers consume massive amounts of megawatts that standard rural power grids are not originally built to handle

    June 23, 2026 · YouTube video · the record (Paraphrased; said in the source itself)

  • DivTeck101

    Data center cooling systems require water volume comparable to small cities

    June 23, 2026 · YouTube video · the record (Paraphrased; said in the source itself)

  • DivTeck101 states the proposed Google data center in West Memphis and the xAI facility in Memphis are approximately 4.5 miles apart

    June 23, 2026 · YouTube video · the record (Paraphrased; said in the source itself)