Data center companies
Developers, operators and builders of data centers and the technology companies that fill them, speaking through their staff and spokespeople.
245 statements from 130 speakers in 38 states and provinces, June 19, 2021 to October 1, 2026. Each appears as said, with the date and the source. No verdict is attached.
Quoted most
- Meta 24
- Google 15
- Adam Kramer 4
- Amazon 4
- Microsoft 4
- Katie Ottenweller 4
- Sarah Knox 4
- Jen Ryan 4
- Contractors 4
- Brian O'Neill 4
- Tom Garvens 3
- Oracle 3
Every statement, by speaker
Meta
-
Meta aims to be net water positive by 2030
-
Closed water loop design uses 87 times less water than original plan
-
Zero operational water use for majority of year with closed loop system
-
Campus annual water use will be less than typical golf course in region
-
New buildings will use closed loop liquid cooling system with dry cooling requiring no water during normal operations
-
Partnered with Montgomery Public School System on robotics program
-
Energy used will be matched with 100% clean and renewable energy
-
Meta provided community grants and sponsorships supporting multiple projects
-
Meta pays full costs of energy, water, and wastewater the data center uses
-
The fund directs money toward teachers, first responders, energy and water infrastructure and community needs in areas where Meta owns and operates data centers
-
Meta launched a $1 billion fund to support data center communities including Montgomery
-
Meta pays full costs of energy, water, and related infrastructure
-
Meta says expansion would make it one of the largest data centers in history
-
All Richland Parish high school graduates beginning with the class of 2026 will be eligible for full scholarships for data center related trade certificate or course
-
The four to five week program will cover costs and requires no experience
-
Meta expects to recruit thousands of people for the program
-
Meta will launch the academy with pilot programs in Indiana, Louisiana, Ohio and Texas
-
Graduates are guaranteed a job at one of Meta's data center construction sites
-
Meta invested 115 million dollars to create America's Workforce Academy
-
Louisiana will host the first cohort
-
Once operational, the Montgomery Data Center will be optimized for AI workloads
-
Montgomery Data Center energy use will be matched with 100 percent clean and renewable energy
-
Meta is advancing its goal of achieving net zero emissions across their value chain by 2030.
-
Meta's broader goal is to reach net zero emissions across its supply chain by 2030.
-
Google says the generators will use ultra low sulfur diesel or a renewable alternative.
-
Google says new generators are strictly for emergency operations and legally mandated maintenance checks.
-
Google's Nevada Clean Energy Fund investment will support the Residential Energy Upgrade Program, bringing free weatherization and energy efficiency improvements to households in data center communities.
-
Google announced a $10 million Energy Impact Fund to support energy innovation and affordability in Nevada, with $5 million to the Nevada Clean Energy Fund.
-
Google said the $526 million figure represents upfront payments and that ongoing payments will continue throughout the agreement
-
Google committed to replenish 120 percent of freshwater consumed by offices and data centers by 2030
-
Google providing $25 million energy efficiency fund for electric bills and home weatherization
-
Google is building a data center in West Memphis
-
Google will partner with ICF and Entergy Arkansas to support approximately 200 residents whose homes need critical pre weatherization repairs
-
Google, Meta, Microsoft, OpenAI, xAI, Oracle and Amazon Web Services signed a ratepayer protection pledge committing to ensure data center growth will not drive up consumer energy costs
-
Google offering no cost access to Google AI courses and Career Certificates for all Arkansas residents in partnership with Arkansas Department of Commerce
-
Google said 15% of water consumption was in areas with high water scarcity
-
Google Mesa data center will reach at least 80% carbon free energy by 2026
-
Google announced a new Phoenix cloud region in addition to the Mesa data center
-
Google will use air cooled technology instead of water cooling in Mesa
Adam Kramer
-
Project executive Adam Kramer stated the facility would not rely on Indiantown's water supply.
-
Adam Kramer stated the project would generate $44 million a year of tax revenue from energy use going directly into infrastructure projects to support rural Martin County and Indiantown.
-
Adam Kramer, Global Head of Data Centers at Panattoni Development Company, stated developers identify power access before purchasing land
-
Adam Kramer said 670 trade workers expected over four to six year construction period
Amazon
-
Amazon data centers in Eastern Oregon use outside air for cooling for 93% of the year, using water cooling for only 7% of the year
-
Amazon committed to build 20 billion dollars worth of data centers in Pennsylvania including a facility in Bucks County.
-
Amazon says it won't use water for cooling
-
Amazon press release about Ridgeland and Canton projects states commitment to building data centers responsibly in Mississippi
Microsoft
-
Microsoft says its newest liquid cooled AI data centers use direct to chip closed loops with zero water evaporation
-
Project needed to address expanding customer demand for cloud platform services in the region
-
Microsoft improved water use efficiency by 25 percent between 2022 and 2025
-
Microsoft said 42% of its water came from areas with water stress in 2023
Katie Ottenweller
-
Katie Ottenweller, Google energy market development, stated Google will pay for 100% of power costs to serve data center operations
-
Katie Ottenweller, regional head of energy market development at Google, said the Community Energy Advisory Council ensures the West Memphis Energy Impact Fund remains rooted in local needs
-
Katie Ottenweller, regional head of energy market development for Google, said the most effective community investments are grounded in true partnership and expressed thrall at announcing first partners
-
Katie Ottenweller, Lead of Energy Market Development for U.S. Eastern Region at Google, spoke during the event
Sarah Knox
-
Sarah Knox, Valara Holdings spokesperson, said the project would use 97 percent of its own energy capacity and minimize grid reliance
-
Sarah Knox said the project will not use groundwater aquifers or wells
-
NorthMark is complying with state laws and is still waiting on an air permit to operate and hopes to receive it by the end of the year
-
Sarah Knox, NorthMark Director of External Affairs, stated the project meets DES and EPA regulations according to plain reading
Jen Ryan
-
Jen Ryan stated that Google worked with Columbia County leadership to exceed decibel standards and buffers for the data center.
-
Google representative Jen Ryan spoke at the Future Forward Summit about the Google data center coming to Columbia County, discussing standards for noise, lighting, and water usage.
-
Jen Ryan said data centers employ many people, citing hundreds of employees at the Douglas County data center on any given day.
-
Jen Ryan said the data center will follow certain standards when it comes to noise, lighting, and water usage.
Contractors
-
Projects could bring road improvements and more business for local restaurants and services
-
Contractors used a hyperscale data center project in North Dakota as an example of construction impacts
-
Construction concerns included more traffic, temporary worker housing, dust and pressure on local infrastructure
-
Developers often worked with local leaders before construction began on traffic routes, housing availability and ways to limit impacts
Brian O'Neill
-
O'Neill stated 'Will I win legally? Absolutely. And I'll spend whatever it takes to do that because what I'm building is right, and it's right for the community.'
-
O'Neill said his proposed facilities would use closed loop water systems, generate their own electricity, create no light pollution and comply with local noise limits
-
Brian O'Neill said he is committed to moving forward with the projects despite community opposition
-
O'Neill called the township council's claim that he rejected safeguards a 'bald faced lie' and said he agreed to most requests
Tom Garvens
-
Tom Garvens outlined Google's full stack approach to scaling AI during keynote at Data Center World Power 2026 in Houston, positioning data centers as active partners in stabilizing local grids and developing energy strategies that transform backup assets into grid supportive resources
-
Google is redesigning the entire AI data center ecosystem from chip to utility, including optimizing for liquid cooling, low voltage direct current (LVDC) architectures, intelligent algorithms, and facility design
-
Google is publishing standardized power and facility technology specifications through the Open Compute Project to enable the industry to build interoperable, efficient, and sustainable infrastructure
Oracle
-
Oracle states Project Jupiter remains on planned schedule despite force majeure notice.
-
Oracle claimed construction uses non potable water from existing New Mexico water rights holder for dust control and other construction activities.
-
Oracle says its AI facilities use direct to chip closed loops with zero water evaporation in New Mexico, Michigan, Texas and Wisconsin
Equinix
-
Equinix said two broken valves used in the tank's routine filtration process caused the release
-
Equinix said it was conducting full investigation to determine root cause and prevent recurrence
-
Diesel fuel leaked from a storage tank at the Equinix data center in Secaucus
Cushman & Wakefield
-
Cushman & Wakefield ranked Dallas No. 1 global data center location
-
Cushman & Wakefield analyzed over 100 global markets evaluating power infrastructure, politics, regulatory conditions and ability to hold data
-
Dallas surpassed Virginia which had held No. 1 position for over 25 years
Cathie Vick
-
investment expected to help train thousands of workers, including roughly 3,000 in the Richmond area
-
Google committed $50 million toward training electricians and skilled trades workers in Virginia
-
Construction can take 18 to 24 months for each building on a data center campus
Kate Franko
-
Kate Franko, Head of Public Affairs at Fluidstack, states company pays full local property taxes and builds to Governor's standards
-
Fluidstack will pay full local property taxes without requesting tax abatements or county incentives
-
Fluidstack will pay for its own energy and infrastructure
Nick Phillips
-
Applied Digital spokesman Nick Phillips spoke for 5 minutes 12 seconds during public comment period at North Dakota data center hearing
-
Applied Digital used nondisclosure agreements in North Dakota for about six weeks during project viability determination before permitting and lifting the NDA
-
Nick Phillips, executive vice president of external affairs for Applied Digital, testified company used NDAs for Harwood project in compliance with state laws
Jeff Wabik
-
DC Blox now sees requests for 864 count fiber as routine and in some cases 1,728 count cable.
-
Permitting remains a significant bottleneck, with approval processes for fiber routes often taking a year or more.
-
DC Blox CTO Jeff Wabik says fiber construction has become part of the core construction component of data center projects rather than an afterthought.
Brad Davis
-
Brad Davis, Meta Director of Global Economic Development, said the closed loop cooling system runs without extra cooling water for much of the year and needs refill every 7 to 10 years
-
Meta requires shovel ready sites with infrastructure and deep talent pools for data centers
-
Meta seeks 100 percent renewable energy access for site selection
Google spokesperson
-
Google statement: Google is fully committed to covering 100 percent of the power and infrastructure costs for West Memphis data center, with ongoing monthly rates over the 20 year agreement completely funding operational footprint
-
Google spokesperson stated Google is committed to covering 100% of power and infrastructure costs, with upfront payments totaling $526 million and ongoing monthly rates over a 20 year agreement
-
Google Mesa facility is air cooled and consumes water typical of a standard office building
Volition officials
-
Volition's plan includes no diesel generation, a dry cooled system, and a noise limit
-
Volition officials stated their data center will not strain local resources due to being self powered, will be in an existing building, and will have reduced emissions and increased property tax revenue
-
Volition officials stated their data center will not strain local resources due to being self powered, will have no diesel generation, is dry cooled, and has noise limits
OpenAI
-
OpenAI said this gives a site that once supported American industry and national security a new role building infrastructure for the Intelligence Era
-
OpenAI pledged to pay for own infrastructure, support new electricity sources and minimize water usage
-
OpenAI claims water use for the data center will be minimal
Vantage Data Centers
-
Vantage said generators will primarily be used one or a few at a time during monthly testing, well below DNR's established limit of 50 hours per generator annually
-
Vantage stated they are committed to balancing schedule with community needs
-
Part of Stargate project, a $500 billion public private initiative
Joe Kava
-
Joe Kava, VP Data Centers at Google, said they are proud to put down roots in Arizona with data center and cloud region
-
Joe Kava, VP of Data Centers at Google, stated data centers are economic anchors in communities
-
Joe Kava, vice president of data centers at Google, announced the Mesa data center project
Dan Diorio
-
Connecticut has some of the nation's most expensive electricity at 23-25 cents per kilowatt hour, compared to 10-12 cents in the south
-
Data centers bring thousands of construction jobs and millions of dollars in property taxes without requiring new roads and schools, since most centers only employ a few dozen people
VoltaGrid
-
VoltaGrid agreed to comply with the weaker carbon tax price
-
VoltaGrid wanted a predictable price on emissions for 15 years
Angela Adam
-
Customers increasingly want to know whether an operator can deliver capacity on a specific date
-
Customers are buying a credible date around which they can construct their own business plans
Nvidia (unnamed executive)
-
Nvidia released DSX platform for datacenter energy efficiency with proof of concept examples from live deployments
-
Nvidia said in a June report that it can eliminate water consumption almost entirely at some facilities when deploying DSX
Raeden
-
Raeden received threats related to Project Taurus proposal and is evaluating partnership and next steps
-
Raeden says it is evaluating whether Project Taurus is the right partnership for the company
JLL
-
JLL said resistance to data centers in Nevada, Utah, and Arizona due to limited power capacity and community opposition is pushing developers back toward Southern California.
-
Vernon, a Southern California city with its own utility, is approaching capacity and needs infrastructure expansion before taking more data center projects.
Digital Realty Trust
-
Digital Realty publicly committed on August 7 to Texas Governor Greg Abbott's data center standards
-
Digital Realty welcomed the Texas framework on August 7
X global government affairs
-
Chinese bots posted claims that AI data centers drive up household electricity prices and strain the grid
-
X identified bot farm of approximately 200,000 Chinese accounts with 200 posting about data center concerns in August 2026
Anthropic
-
Anthropic discovered five cases in recent months in which scientists in unspecified foreign nations used Anthropic models to study dangerous pathogens
-
Anthropic published a commitment to cover electricity price increases and 100 percent of grid infrastructure costs for data centers including Lake Mariner
CBRE
-
CBRE attributes Georgia's data center growth to tax incentives, construction workforce, and business environment
-
Local opposition and community acceptance has become a development constraint on par with power procurement
Applied Digital Corporation
-
Applied Digital Corporation donated $25,000 to Tommy Tuberville's gubernatorial campaign in August 2026.
-
Applied Digital Corporation also donated $100,000 to Republican Forward, a conservative Alabama super PAC.
Courtney Lee
-
Amazon representative said Amazon data center uses less water than local agriculture industry
-
Amazon representative said company runs diesel generators about 12 hours per year for testing and maintenance
Leah Davis
-
Nebius had a sound study conducted and built the facility to the worst condition scenario so noise should not exceed background noise
-
Nebius spokesperson Leah Davis said the company followed every normal and legal procedure of any other economic development project that happens in the city of Birmingham
OpenAI spokesperson
-
OpenAI stated dirty fluids will be properly and lawfully disposed of off site at drainage time and will never be discharged into local environment
-
OpenAI stated closed loop cooling after initial fill would have ongoing water needs comparable to a typical office building for restrooms, kitchens, cleaning, sanitation, and maintenance
Meta spokesperson
-
Meta pledged to pay for own infrastructure and launched fund for water and energy infrastructure investment
-
Meta plans to rehire the majority of staff through a different firm as part of vendor partnership change
Ryan Kehoe
-
The rooftop cooling system is relatively quiet by industry standards because much of the sound vectors upwards.
-
The closed loop chilled water system requires only a one time fill of water.
Mark Freeman
-
Vantage said backup generators are intended for emergencies and required testing and maintenance, running monthly with no more than four generators for 15 minutes, annually one at a time for an hour, and for 15 minutes to validate repairs
-
Mark Freeman, Vice President of Global Marketing for Vantage Data Centers, said the company is committed to working with the city on construction alignment
unnamed Vantage Data Centers representative
-
In 2019, Vantage made a company decision to no longer use evaporative cooling systems in its data center design.
-
The data center will not draw water directly from the lake, but will obtain water through existing Port Washington infrastructure.
Beatrice Fullan
-
Oracle Vice President Beatrice Fullan said more than $150 million annually would come to Saline Township and the surrounding area
Valar Atomics
-
Valar Atomics said 'No construction begins before permits and approvals,' and that it is committed to public engagement on the project.
Tim Chadwick
-
Tim Chadwick, Google's Data Center Operations Area Lead for Ohio and Indiana, noted the skills from military nuclear submarine operations align with data center operations requirements
Amanda Peterson Corio
-
Amanda Peterson Corio, Alphabet Global Head of Data Center Energy, said data center industry is being criticized from both ends of the American political spectrum.
Bill Kleyman
-
AI is driving demand for new data centers requiring enormous amounts of electricity
Kara Hurst
-
Kara Hurst, Amazon Chief Sustainability Officer, said the company's data centers do not use water for cooling roughly 90% of the time.
Melanie Nakagawa
-
Melanie Nakagawa, Microsoft Chief Sustainability Officer, said Microsoft is isolating costs associated with data center construction from ordinary consumers' electricity bills.
Natalie Ravitz
-
Related Companies says Friedrichs received zero commission from the Related Digital data center project and is no longer working on Michigan projects as of March 2026.
Raeden statement
-
A special hearing on Project Taurus was marked by tumult, resulting in police tasing a man and arresting other attendees.
Amazon official
-
Data centers provide computing power and storage behind internet based services
Lucia Tian
-
Lucia Tian, Google's director of Advanced Energy Technologies, said data centers serve as a proof point for bringing new nuclear capacity online by expanding existing plants
Sandeep Prakash
-
Grid connection requests take four to seven years in Virginia.
Anthropic researchers
-
Anthropic researchers posted September 8 that AI's capability could conceivably threaten humanity within about four years
Andrew Minton and William Byers
-
Andrew Minton and William Byers, both registered to represent QTS Data Centers, each contributed $1,400 to Dovilla during 2025 and 2026 ($150 on March 31, 2025; $500 on June 10, 2025; $500 on Oct. 3, 2025; and $250 on March 27, 2026).
Khara Boender
-
Khara Boender, Data Center Coalition Director of Government Affairs for the West, said the group thanks Governor Lombardo for his leadership but has concerns that some policies create additional hurdles to data center development in Nevada
QTS official
-
A QTS official said they anticipate only having to flush their closed loop cooling systems roughly once every 40 years
Cory Gardner
-
Cory Gardner said 'America stands no chance against our adversaries without energy abundance,' and that Valar Atomics believes it should start in Utah.
Michael Egbert
-
BrabenderCox received $3.44 million from Oracle for media production, consulting, and polling related to Project Jupiter
PNK Group
-
PNK Group stated commitment to resubmit application despite planning commission denial
Darren Eades
-
Darren Eades, JLL Senior Managing Director, said pricing has become less important for groups that need capacity quickly, and developers are tying up land and beginning entitlement and development work, with a couple of groups preparing to announce their first significant Southern California deployments.
Rachel Wilson
-
Rachel Wilson, energy market development representative for Google, told Arkansas lawmakers that Google's data centers support more than artificial intelligence development, powering Google Search, YouTube, Gmail and Google Maps
Comfort Systems USA
-
Comfort Systems expects large number of data centers being built to create longer term service opportunity
Steve Smith
-
Steve Smith, City Foundry STL developer, proposed keeping the planned data center while preserving the Armory as an entertainment venue instead of converting it to corporate offices
data center developer (unnamed)
-
Data center committed to paying for transmission investments to avoid increases in electric transmission rates.
Hyperscale Data Inc
-
Management does not plan to recommend sale below 750 million dollars
Meta Platforms
-
Meta said on August 10 that it would pay the full costs associated with its data centers' energy and water use rather than shift them to consumers
Gary Pinkston
-
Gary Pinkston testified he had no interest in project and received no compensation
Prologis
-
Prologis contributed $250,000 to the Yes on Proposition 45 campaign through its Modern Infrastructure Alliance Action Fund.
Jacob Coxon
-
Anthropic researcher Jacob Coxon stated AI could kill all humans by end of decade
Misty Allen
-
The campus will use a closed loop cooling system for water
Applied Digital
-
Applied Digital held a town hall meeting on its Harwood data center in August 2025 after construction plans were finished
Eric Schlidt
-
Prometheus is asking commissioners to bypass the state industrial siting review to speed up build time
Microsoft executives
-
Microsoft temporarily paused select data center developments around early 2025 due to concerns about overbuilding
Brennan Church
-
Switchgear, transformers and generators have extended lead times of 40 to 60 plus weeks.
Creekstone Energy
-
Creekstone Energy has invented technology claimed to create vastly more water than the Delta Gigasite campus consumes
Dave Nehring
-
Applied Digital is projected to be the largest property taxpayer in North Dakota by 2028 or 2029, at more than $25 million a year
Verrus
-
Verrus hired a lobbyist, Drew Hagedorn, registered September 4, 2026, for data center development, energy and utilities, land use and permitting
Aaron Blyeu
-
Aaron Blyeu, chief development officer of Cloverleaf Infrastructure, stated typical data center projects request 75,000 gallons of water, mostly for initial system build, with ongoing use limited to offices, toilets, break rooms, and kitchens
PNK Group representatives
-
PNK Group representatives stated site will utilize closed loop cooling system to minimize environmental impacts
Synjyn Dodd
-
Data centers have tied up large swaths of steel and concrete supply
Amazon Web Services (unnamed executive)
-
AWS improved water use efficiency by 37 percent between 2022 and 2025
Rachel Peterson
-
Rachel Peterson is Vice President for Data Center Strategy at Meta.
Raymond Zavalla
-
Northern Nevada is one of the top five markets for data centers in the country and one of the fastest growing on a global scale
Steve Ceccio
-
Steve Ceccio, project lead, said the primary purpose of the Ypsilanti facility would be to continue classified work Los Alamos has already been doing, including research on nuclear weapons
TRG Datacenters
-
A TRG Datacenters study found that Virginia is the state best positioned to facilitate AI infrastructure growth through data centers
Andy Cvengros
-
Andy Cvengros, co lead of JLL's U.S. data center markets team, said demand levels continue to exceed industry insiders' expectations
Hyperscale Data
-
Hyperscale Data will continue cryptocurrency mining at its Montana site
Sean Farney
-
Sean Farney, JLL Vice President of Data Strategy, said the geographic transformation includes massive investment in West Texas, Ohio, Louisiana and the Carolinas
Hank Evans
-
OpenAI representatives have met with local leaders and residents to determine how community investment can serve the area
Kate Nolan Bryden
-
Kate Nolan Bryden, Prime Senior Vice President of Development and project lead, testified that the facility will use advanced closed loop cooling systems
Volition company officials
-
Volition said they may seek a new community to build their data center due to the continued delays in Spanish Fork
Volition executives
-
Volition executives stated they would not be drawing off the local power grid or emitting excess heat, noise, and air pollution
Drew Baglino (Heron Power)
-
Drew Baglino, Vlad Troy, Michael Polsky and Varun Sivaram propose that AI data centers should do no harm to the grid, offer flexibility when stressed, and help bring new generation and storage into service
Fleet Data Centers
-
Fleet Data Centers expects gas power plants to operate for about two to three years until NV Energy can deliver permanent utility service to Tahoe Reno Industrial Center
Clintonians Against Data Centers
-
Clintonians Against Data Centers raised concerns about displacement of wildlife, local job creation, tax abatement, water usage, and effects on wildlife at the proposed QTS Clinton data center
Nathan Wood
-
Nathan Wood, executive vice president of McGough Construction, said the goal was to avoid overrunning community capacity and noted that facilities with recreation amenities and food services on campus are a great option
SpaceXAI
-
SpaceXAI said in a July press release that it intends to invest millions in sound walls and silencers using advanced quieting technologies
Ruben Torsky
-
Developer Ruben Torsky said he is not opposed to reasonable regulation of data centers and that his proposed facility at the former Greymark property is not an AI data center or AI computing facility
Suzie Shin
-
Google donated $600,000 to Trout Unlimited for water restoration in Apache County
Scott Novack
-
Scott Novack, vice president of digital infrastructure for Stark, said the company is in early stages of evaluating the site and no final decision has been made
Nelson Abramson
-
Nelson Abramson spent 20 years at Google including on its data center team, then ran infrastructure at X
Volition
-
Volition proposed to contribute at least $500,000 annually to a community fund for addiction recovery, food security and housing support
Kent Draper
-
The expansion potential in B.C. is just naturally going to be lower, given the larger U.S. power grid, and Canada is a more challenging regulatory environment than the U.S.
Eric Adams and Anton Voronkin
-
Eric Adams, PNK Group Chief Development Officer Anton Voronkin stated the company listens to community concerns and would design accordingly
Nebius executives
-
Nebius executives said the fuel cell power solution would have no significant impact on the project development timeline
Brad Tietz
-
Brad Tietz, state policy director of the Data Center Coalition, said he is hopeful the mayor's directive will separate responsible water and energy stewards from those who are not
Haley Dobre
-
Haley Dobre, Pier Street Development, said job growth from the $15 billion data center complex north of downtown has increased demand for housing
Bianca Lamothe Verreault
-
Bianca Lamothe Verreault said public meeting promised after mid October when more data and answers available.
Aaron McLear
-
Aaron McLear, OpenAI's vice president of communications, said 'We're using minimal water, circulating the water throughout the building so that's not as much of a concern'
unnamed OpenAI representative
-
OpenAI has not finalized how much water the campus will use or where it will come from
Vantage official (unnamed)
-
On Sept. 23, a Vantage official texted Port Washington Mayor Ted Neitzke about the governor's office seeking more information on why an EIS would kill the project
CyrusOne spokesperson
-
CyrusOne stated its commitment to Sangamon County remains unchanged and it intends to be a long term partner that will create hundreds of jobs and expand the local tax base
Tricia Braun
-
Every direct data center job in Wisconsin supported more than six additional jobs elsewhere in the economy
Parks Huff
-
Parks Huff, attorney for developer, stated facility is needed and location is ideal for data center due to infrastructure proximity
Michael Graham
-
Michael Graham, Whiting Turner project lead, said there were 85 ironworkers at peak on that building
Victoria Tyson-Bloyd
-
Victoria Tyson Bloyd, vice president of construction for Vantage, said disruptions from dust should be lessened soon
Charles Fratantoni
-
Data centers built near residential areas raise ambient temperatures up to 4 degrees Fahrenheit
Asif Kazimm
-
Each building would have internal closed loop and chiller system on roof with closed loop water cooling system filled up only once
Macrina Wilkins
-
Macrina Wilkins of Associated General Contractors of America said data center construction jobs might max at 10,000 but broader economic models include indirect and induced effects
EnergiAcres
-
EnergiAcres says it welcomes dialogue
Bill Jabjiniak
-
Bill Jabjiniak, EdgeCore senior vice president of national community and government relations, stated SRP sought to expand infrastructure to help meet rising regional energy demand
Edwin Van Velzen
-
The data center buildings are being constructed concurrently
Broderick Green
-
Broderick Green, Public Affairs Manager for the Google Data Center, says company should have shared information earlier
Apple
-
Apple has committed to supporting 100 percent of its energy use in Prineville with renewable resources
Google officials
-
Since 2017, Google has matched energy usage with renewable energy purchases
Gary Demasi
-
Gary Demasi, senior director of energy and location operations at Google, said the company is working to utilize water more efficiently and exploring ways to incorporate circularity
Sergio Loureiro
-
Sergio Loureiro, vice president of core operations for Microsoft, said the company has pledged to be water positive by 2030, meaning it plans to replenish more water than it consumes globally
The group comes from the words the source gives for the speaker: the name, the title and the organization. It is a reading aid, not a fact about anyone; how the groups are read.
Cite this page
Data Center Record, "Statements about data centers: Data center companies", https://datacenterrecord.org/statements/data-center-companies. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Group value
- data-center-companies
- Statements
- 245
- Speakers, one key per name
- 130
- Placed by the stored speaker type or no rule
- 0