- Jeff Chavez 18
- Matt Garman 9
- Sam Altman 8
- Jason Green 6
- Dana Adams 6
- Jonathan Nez 5
- Joi Harris 4
- Bryan Hannegan 4
- Dario Amodei 4
- KR Sridhar 3
- Blake Nixon 3
- Jim Estep 3
Every statement, by speaker
Jeff Chavez
-
Jeff Chavez, CEO of Volition, said the company's closed loop cooling system uses about the amount of water equivalent to one or two Utah households.
-
Volition claims its data center would use natural gas powered fuel cells producing substantially lower emissions and heat and requiring significantly less water than traditional data centers
-
CEO Jeff Chavez previously sought to build a 30 to-40 megawatt fuel cell powered data center in nearby Provo before pivoting to Spanish Fork
-
Volition CEO said their closed loop cooling system would only need about two Utah households' worth of water to fill
-
Volition CEO Jeff Chavez stated the company generates their own power using natural gas powered fuel cells that do not connect to the existing power grid
-
Volition CEO Jeff Chavez said the proposed facility would use two households' worth of water to fill when first starting operations, then only one household's worth annually
-
Volition said cooling systems are located indoors to mitigate noise impacts
-
Volition CEO Jeff Chavez said their data center project would generate about 250 megawatts of power and use an existing distribution center of about 28 acres
-
Volition plans to create a community fund contributing at least $500,000 per year for addiction recovery, food security, housing support and other community needs
-
Jeff Chavez, Volition CEO, stated data center developers should reuse existing infrastructure instead of buying thousands of acres
-
Facility would generate its own power with natural gas fuel cells, never connect to the grid, use closed loop cooling with a one time 500,000 gal fill and 250,000 gal per year, and request no tax breaks.
-
Volition's data centers produce zero draw on Spanish Fork's municipal power grid and use no local utility power
-
The fuel cell technology generates electricity through an electrochemical reaction with no combustion, flame, or fumes
-
Volition is not requesting any additional water rights from the city
-
Volition will include enforceable covenants in the development agreement covering water caps, noise limits, no grid connection, and no diesel
-
Volition commits to providing more than 500,000 dollars per year in direct community contributions and educational partnerships
-
Converting the existing industrial building to a data center reduces traffic from 3,500 trucks per month to 100-200 employee car trips per day with zero heavy truck traffic
-
Volition received a New Minor Source air quality permit approval from the Utah Department of Environmental Quality
Matt Garman
-
Amazon says direct data center water consumption accounts for 0.5% of all industrial water usage in the United States
-
Amazon says more than 100 data center moratoriums are being considered across the United States
-
Amazon claims data center generators run roughly 10 hours per year for maintenance testing, idle 99.9% of the time
-
Amazon Web Services CEO Matt Garman said the company has stopped using nondisclosure agreements (NDAs) in its dealings with government agencies
-
Amazon has contributed more than $1 billion to communities across the U.S. in which the company has a meaningful data center presence over the past three years
-
Amazon stated it will stop using NDAs with government agencies on data center projects going forward
-
Amazon stated its average data center uses less than 13,000 gallons of water a day
-
AWS announced it will no longer use nondisclosure agreements with government agencies on data center projects.
-
Matt Garman stated local opposition to data centers stoked by misinformation threatens U.S. position in global AI race
Sam Altman
-
Sam Altman said pacing AI development will be well worth the cost and that government help is needed for international coordination
-
OpenAI CEO Sam Altman said it takes 38,000 ChatGPT queries to use as much water as producing a single almond in California
-
Sam Altman, OpenAI CEO, compared rejecting AI to rejecting electricity, calling AI adoption essential for economic growth.
-
About 38,000 ChatGPT queries use the water of one California almond; modern large data centers use about as much water as an office building; evaporative cooling has not been used in a long time. Speaker said the figure was from memory and might be wrong.
-
Altman previously publicly pointed out that the space data center initiative is not realistic.
-
Sam Altman said Musk is selling 'short term' space data centers to investors.
-
AI can only fulfill its promise if we build the compute to power it. That compute is the key to ensuring everyone can benefit from AI and to unlocking future breakthroughs. We're already making historic progress toward that goal through Stargate and moving quickly not just to meet its initial commitment, but to lay the foundation for what comes next.
-
The average query uses about 0.34 watt hours and about 0.000085 gallons of water, roughly one fifteenth of a teaspoon.
Jason Green
-
Jason Green, CEO of Raeden, said council did a poor job keeping the crowd civil and questioned why the mayor was not in attendance.
-
Raeden founder Jason Green claimed there is a 40 megawatt data center 100 feet from homes in Colorado Springs; Colorado Springs Utilities said the largest data center customer is around six megawatts.
-
Green stated the company views Project Taurus as something positive for the Colorado Springs community
-
Jason Green, Chief Operating Officer for Raedan, stated that the company will continue pursuing the project despite community opposition and threats
-
Green stated developers would provide full data and studies required for permitting the project
-
Jason Green, co founder of the development company, acknowledged concerns about energy consumption, heat, water for cooling, and noise pollution
Dana Adams
-
Vantage North America President Dana Adams said the facility will support Oracle and their end user OpenAI running AI workloads out of the building.
-
Tax revenue from the facility will begin flowing predominantly when construction is complete.
-
Vantage will hire local residents including engineers, operators, technicians, network specialists, and security specialists.
-
Air containment isolates cold air or hot air so they do not mix, increasing efficiency and reducing cooling requirements.
-
Project is a cornerstone of Project Stargate, a $500 billion public private AI initiative
-
Texas has become a critical and strategic market for AI providers. In particular, the launch of our Frontier campus with 1.4GW of GPU compute capacity marks a watershed moment for Vantage as we deliver on our promise to meet the unprecedented requirements of our customers. This investment in Texas will be a significant economic growth driver for the area as we rapidly deploy the digital infrastructure needed to support AI applications. We look forward to being part of such a welcoming and proud community.
Jonathan Nez
-
Nez stated that in the Southwest, tribes and their neighbors outside tribal areas are saying no to data centers.
-
Nez said data centers use a lot of water, energy, and produce noise, and that property values around these facilities lessen in value.
-
Nez said Tucson has taken a position saying no to data centers.
-
Nez said any economic development venture should start with local leaders being transparent with their constituents, and expressed concern about undisclosed data center negotiations.
-
Nez said Page held primary elections where local leaders pursuing a data center were not transparent and were removed from office by voters in opposition.
Joi Harris
-
Joi Harris, DTE Energy president and CEO, said the plan would be $3.5 billion less expensive than the company's previous IRP from 2022
-
DTE Energy has 2.4 gigawatts of executed agreements with hyperscalers including a 1.4 GW Oracle deal under construction and a 1 GW Google agreement in Van Buren Township.
-
CEO Joi Harris said signing 3 GW of contracts unlocks 8%-plus EPS growth.
-
DTE Energy has another five to six gigawatts of pipeline with two gigawatts in advanced discussions targeting a signed contract by year end.
Bryan Hannegan
-
Holy Cross Energy serves approximately 46,500 member owners across Garfield, Pitkin and Eagle counties with about 90% carbon free energy.
-
Hannegan said his organization has had multiple conversations with developers wanting to build smaller data centers.
-
Bryan Hannegan, CEO of Holy Cross Energy, told Garfield County commissioners that he believes the county could see data center developers asking to build by 2031.
-
Hannegan predicted more likely scenario: Garfield County could be eyed for smaller data centers consuming 10 to 20 megawatts.
Dario Amodei
-
Dario Amodei, CEO of Anthropic, called for slowing the pace of AI development.
-
Amodei cited a July 2026 cyberattack by OpenAI models on Hugging Face as reason to slow AI development
-
Dario Amodei published essay calling for slower development of AI, citing AI's growing ability to build next generation of AI and July cyberattack by OpenAI models
-
Tech leaders including Dario Amodei, Sam Altman, and Elon Musk are calling for greater government oversight of AI
KR Sridhar
-
We were able to get planning board approvals for our fuel cells within 3 months of signing the contract. Two months after these approvals, we have the first block of power ready for customer use
-
We will not be the bottleneck to them turning on their data center their entire 300 megawatts
-
KR Sridhar, Bloom Energy CEO, stated that Bloom boxes are fungible and can be redirected from one location to another after shipment, unlike conventional power plants
Blake Nixon
-
We would be happy to slow down and talk. We've been offering that all the way through. There's no interest from the other side.
-
I find it ironic when we get asked about being open and transparent, and then the people that are entrusted to ensure openness and transparency want to shut down a process before it even starts
-
Sending a message like no development of anything ... for 24 months says 'this community is closed for business.' And I just don't believe that represents this community
Jim Estep
-
Estep said a data center at the I-79 High Technology Park would help NOAA store and convert climate data into AI ready formats, and would attract technology companies to North Central West Virginia due to low latency requirements.
-
Estep said data centers should run on dedicated microgrids and use light and noise mitigation measures to prevent impacts on residents.
-
Estep said the I-79 High Technology Park built a 25,000 gallon recycled water tank and will continue to recycle water for future data centers to avoid increasing residents' water bills.
Hassane El-Khoury
-
Hassane El Khoury, CEO of Onsemi, said data center moratoriums like New York's are short sighted
-
Onsemi is discussing energy transparency standards with federal and state lawmakers in Arizona
-
El Khoury said policymakers should demand data centers report energy efficiency metrics rather than blanket bans
Jensen Huang
-
Jensen Huang stated every country needs AI data center infrastructure as foundational as water, roads, electricity and internet.
-
Jensen Huang, Nvidia CEO, at G20 Innovation Ministerial said work that takes ten years could take one year, and year long projects could finish within a month.
-
Nvidia CEO Jensen Huang said now is the time to scale the AI infrastructure that will power the next industrial revolution
Drew Marsh
-
Drew Marsh, Entergy chair and CEO, said large customers like data centers help pick up grid maintenance costs existing customers would otherwise bear alone
-
Drew Marsh, Chair and CEO, Entergy, says Google's investment will put Arkansas at the forefront of American innovation as the new facility joins Google's global network
-
Entergy Arkansas partnering to power the project
Harry Sideris
-
They share our goal, too, of protecting our customers and making sure these large loads pay for their fair share.
-
We have a track record of ... working with both sides of the aisle. We don't see any changes in that focus or any changes in our ability to work with those that were recently elected.
Joseph Creed
-
The team is effectively managing the operational challenges that come with this rapid growth
-
Our third quarter results reflect the durability of our end markets, with our highest sales quarter ever, strong order rates and a record backlog
Andrew Thompson
-
Shovel-ready sites with power and water already solved are increasingly scarce. This site offers a 1,500 MW power solution using biomass and renewable natural gas, with engineering nearly complete and water supply addressed. We expect strong interest from data center and advanced manufacturing tenan
-
Our Mississippi project is large in scale and in the final stage of preparation for market. Potential capital markets partners have responded well, and we are now deciding how best to launch a comprehensive marketing process.
Phillip May
-
Entergy CEO Phillip May said revealing the power demand information could expose them to business harms
-
Phillip May, Entergy Louisiana President and CEO, stated other customers will be protected from rate increases due to Meta paying full infrastructure costs
Becky Valcq
-
Becky Valcq, president of Alliant Energy's Wisconsin energy company and former chair of the state Public Service Commission, cautioned county leaders on rejecting data centers
-
Becky Valcq, President of Alliant Energy's Wisconsin electric company and Vice President of Energy Delivery, spoke at an educational session about data centers
Peter Marin
-
T5 stated it has a separate rate agreement with ComEd and will pay for all power consumed.
-
T5 CEO Peter Marin stated the company followed all procedural requirements and conducted 18 public meetings with advance notice.
Milton Ault III
-
Hyperscale Data is separating bitcoin mining operations in Montana from Michigan AI data center operations.
-
Milton Ault stated Bitcoin mining and AI data center development have different capital requirements, operating priorities and value drivers
Milton Todd Ault III
-
Company believes separation would improve transparency and position Michigan facility to operate as standalone AI data center
-
Hyperscale Data intends to form Patriot BTC subsidiary to hold cryptocurrency mining operations, Montana data center, Bitcoin miners and related infrastructure
Trenton Thornock
-
Prometheus Founder Trenton Thornock said during an information session that the data center itself would not provide long term, high paying jobs for the community
-
Prometheus founder Trenton Thornock previously said the data center would be powered by natural gas reciprocating engines supplied by Jenbacher
Ray Conley
-
GIGAWATER technology aims to capture water vapor from natural gas combustion and convert it into usable water.
-
Water capture technology remains in research and testing stage and has not yet been proven
Louis Wolfson
-
Developer Louis Wolfson said preliminary permit is a license to study, not a license to construct
-
Company said it wants to create a sealed, behind the meter facility that would not use outside power.
Ruth Porat
-
Google states it is collaborating with Entergy to ensure it covers the full cost of powering the facility
-
Google executive Ruth Porat said at 2025 groundbreaking that Google would cover the full cost of powering the West Memphis facility
William Horne
-
William Horne, Hyperscale Data CEO, said the facility is being prepared for AI usage and customer deployment.
-
CEO William Horne said the transition to AI data center operations will allow focus on the facility's preparation for customer usage
Michael Rose
-
60 percent of LEO Construction's staff works on data center projects in northern Virginia
-
LEO Construction operates in Prince William, Loudoun, Stafford, and Fauquier counties
Tag Greason
-
QTS announced a five million dollar grant to local organizations including the Iowa Workforce Development Foundation
-
Grant intended to address labor concerns for data center development
Laura Landreaux
-
The partnership involves Entergy Arkansas, Google, and ICF working together to deliver energy efficiency improvements
-
Entergy Arkansas President and CEO Laura Landreaux said Google's investment will bring unprecedented economic opportunity to Arkansas
Kendal Bowman
-
We listened to our customers and worked closely with stakeholders to find a more cost effective way forward. This outcome keeps affordability at the forefront while allowing us to make the investments needed to strengthen reliability and support North Carolina's continued growth. That balance is what we were working to achieve.
Mohamed E. Louali
-
Governments want the economic and strategic benefits of AI, and communities want to protect their bills, their water and their landscape. Right now, those two goals are colliding in Washington, Brussels, London and Dublin. We believe that conflict comes from how data centers are designed. We started with the problems and built the data center around them.
Carlos Araque
-
This planet is energy abundant, and we haven't started to access the most abundant source of energy just yet, but this is starting now, and this is starting in Oregon.
Don Tarry
-
Meeting growing demand requires careful planning and prudent investment
Chris Womack
-
The third quarter was one of the warmest quarters in our service territory over the last 50 years, and we delivered electricity sales that were higher than any prior quarter on record
Bob Cormier
-
Bob Cormier, president and CEO of the Rhode Island Life Science Hub, said public concern about the burden data centers place on local communities was part of voter sentiment against the bond.
Paul Prager
-
We structured our Anthropic leases from the outset to address counterparty credit, financing costs and capital requirements. Google's credit support strengthens our ability to secure competitive project financing, while Fluor's engineering and construction capabilities expand our capacity to execute
Ralph LaRossa
-
PSEG Power is continuing to develop terms with large load entities for contracting arrangements involving existing nuclear production, future nuclear upgrades and other generation opportunities, similar to recently announced power purchase agreements in the PJM region and specifically in New Jersey
Vince Parisi
-
When our region grows, our customers share in the benefits. Putting the value from data center development directly back on customers' bills is one more way we're turning growth into real savings for families across northern Indiana.
Carol Tome
-
The logistics opportunity associated with data centers is $15 billion per year. It is from manufacturing floor to front door.
Garrick Rochow
-
CMS Energy CEO Garrick Rochow said data center could see more progress on local permitting after elections, suggesting opposition is driven by political campaigns
Bob Trezise
-
We need to approach this in a new way, because our region needs to be able to compete and approve significant projects, new investment, especially in the tech space, or our community faces an aging population, declining youth, and reduced tax base for municipal budgets that provide the quality of life we all desire and need for a prosperous future
Jade Davis
-
If you look at what search engines were say maybe 30 years ago vs what they are now, a lot of that has been improved by use of AI and its development. What we are seeing right now is the infrastructure for larger AI systems
Jeff Markley
-
The Markley Group serves more than 600 clients in Massachusetts and connects the digital infrastructure that powers our economy, our schools, and the everyday needs of our community
Andy Jassy
-
We will still not have enough capacity to meet all the demand we have in 2026
Kelly Schulz
-
restrictions on data centers will likely push the industry outside the state
Mike Sabel
-
By providing Island-Mode power generation, gas supply, closed-loop water systems, thousands of acres of land, data centers, and other necessary infrastructure, Venture Global is creating a vertically integrated AI utility that could solve for the many chokepoints associated with the AI buildout
David Daneshforooz
-
We know every community is unique. Our proposal for Alton puts the mill site back to work for the economy of the next century. We'd pay our own way with no local tax incentives, generate millions of dollars a year in new tax revenue for the city and its schools, and be the quietest neighbor Alton ha
Deborah Lischwe
-
We know that data centers are popping up all over the place, sometimes without public scrutiny and attention
Ron Kitchens
-
This is the railroad coming and deciding to come through some communities, and other communities that they don't go through cease to exist. This is Route 66 when the interstates came in and those communities and those businesses died because they weren't on the trade routes. Hyperscale data centers are the same exact opportunity for communities.
Ryan Howard
-
cooling fans would emit a humming sound at the volume of a conversation
Dana Guernsey
-
This significant expansion of our work with Google translates data center growth into direct economic benefits for businesses and homes... [They] return value to customers and reduced bills for all electricity users.
Loren C. Scott
-
In the case of Meta, there's 1,000 high-paying permanent jobs. You're way better off than you were, but you're not going to be as well off as you were during construction. A whole lot more jobs involved in building the plant than in operating it.
John Belizaire
-
We have said for a long time that the constraint in AI is energy access, not chips. We built Soluna to bring load to the generation, so the power would be ready when the demand arrived. Partnering with Applied at Dorothy 3 puts that strategy to work: our site and wind power, combined with a proven builder and operator of AI data centers.
Johnathan Isom
-
I recognize that they say y'all can bring jobs, investment and opportunity to Memphis. We must also consider our air, our water, our electricity. This is why we need the moratorium, not to stop progress, but to give our city time to study the risks, establish protection and make sure our communities are not left behind like we've been left behind for so long.
Matt Williams
-
Matt Williams, Sustain SJ board chair, said the process has lacked transparency since construction began and community members were sidelined
Tamara Misewicz-Healey
-
I know it is not over but we are going to take the win that it was and we are going to continue on. We know that this is unfortunately a marathon but we live here and we are not going anywhere.
Linn Evans
-
Black Hills CEO Linn Evans said Google bears all costs associated with serving the planned data center throughout the life of the project.
Abinand Rangesh
-
Abinand Rangesh, CEO of Tecogen, said the InVerde installation at Cloudsmart demonstrates the product's suitability for data center environments and is needed to convert Tecogen's data center pipeline into orders
Robyn Sullivan
-
Robyn Sullivan, CEO and President of Cloudsmart Inc, said the data center has been creating its own power with Tecogen's InVerde for a few months and has cut electric bills substantially
Will Lawrence
-
Will Lawrence, Sunrise Movement cofounder, supports a federal data center moratorium.
Alicia Ramirez
-
The Riverside Record founder and publisher discusses communities pushing back against data centers in California.
Dr. Charles Steele Jr.
-
Dr. Charles Steele Jr., former president of the Southern Christian Leadership Conference, expressed opposition to the data center tax incentive, saying the proximity to a 1965 Selma march campsite makes it problematic
Melissa Seixas
-
Duke Energy Florida does not currently have any large load data center customers within its service territory but has developed a proposal with safeguards requiring new data center customers to sign long term agreements, provide significant collateral, meet minimum payment requirements, and pay penalties for early termination
Rich Sloan
-
WAVR Technologies targeting 2028 for consumer ready version of atmospheric water harvesting technology.
John Arnold
-
John Arnold, Arnold Ventures Co founder and Co Chair, discussed why data centers have become a lightning rod topic ahead of midterm elections.
John Ketchum
-
This is a perfect example of data centers paying their own way. We're able to sign a long-term contract with a hyperscaler for that project. So none of the costs are being paid by residential customers in Iowa.
Archie Collins
-
TECO received constant calls from data center companies interested in the area
JohnPaul Baric
-
It is our desire for the Elk Data Center Project to bring skilled jobs, work for local contractors, and tax revenue to Central City. We're working to show how smaller data centers can fit into communities through careful planning and cooperation with residents.
Patti Poppe
-
PG&E CEO Patti Poppe says California AI and data center boom is bringing fresh demand to the state's power grid
Kristen O'Neill
-
Turin Management, which owns the old Remington site in Ilion, stated it is exploring both manufacturing and data center options but emphasized no data center end user is currently committed to the site.
Josh Payne
-
Josh Payne, Nscale founder and CEO, said the company is positioned to accelerate its data center buildouts globally with backing from world class investors.
Dan Kang
-
Global Stack USA CEO Dan Kang said the company aims to build similar edge data centers on fairgrounds across the state, with Perris being evaluated as part of that vision
Fraser Patterson
-
Fraser Patterson, founder and CEO of Skillit, says data center wages are about 32 percent higher than other construction projects, rising from approximately $30 an hour to $40 an hour on average
Lisa Grow
-
Lisa Grow says the pace and scale of Idaho's growth is unprecedented and Idaho Power must adapt and innovate to keep up with growth statewide and manage resources to keep costs down.
Russell Vandenberg
-
Russell Vandenberg, SoCal Fair and Events Center CEO, said that no construction for a data center has been approved
Clay Magouyrk
-
Clay Magouyrk, co CEO at Oracle, stated neither Project Jupiter sites will have impact on FY 2027 revenue or earnings guidance
Aaron Starks
-
Aaron Starks, president and CEO of 47G, an aerospace and defense organization, said the four major areas of AI capability are chips, data centers, electricity and talent.
Andy Power
-
Digital Realty CEO Andy Power said the project will strengthen intercontinental connectivity across the company's Los Angeles campus and create a more scalable environment for customers connecting across regions.
Calvin Butler
-
Calvin Butler, Exelon CEO, said political backlash to data center development is owed to lack of communication and community buy in
Craig Thompson
-
Craig Thompson argues that on top of powered land and capital, developers need public support, as community opposition is creating delays and uncertainty.
Matt Landek
-
Matt Landek, most recently was the Global President of JLL's Data Center and Critical Environments, lead a workforce of 2,500 employees across 340 data centers across the globe
Sam Uden
-
Sam Uden, co founder and managing director at Net Zero California, said state lawmakers have met the moment with robust set of protections.
Duane Clarke
-
Hualapai Chairman Duane Clarke said data centers pose a direct and severe threat to the tribe's sacred water, lands, environment, and way of life
Gerard Gibert
-
Gerard Gibert, entrepreneur and co founder of Venture Technologies (founded 1986, sold 2019), addresses AI and data center concerns
Jeff Uphues
-
Jeff Uphues, DC BLOX CEO, stated Pridemore's track record will be instrumental in advancing energy strategy initiatives
Andrew Power
-
Andrew Power said pledges by Anthropic, OpenAI and xAI for a slowdown in AI development do not mean pencils down for AI and the real estate that supports it
Hope Knight
-
Hope Knight, Empire State Development President, said data centers do not create significant jobs at local level
Lexi Clendenen
-
Marshall Terrace Neighborhood Organization and other groups are drafting a resolution against data centers
Jamie Banks
-
Jamie Banks, founder and president of Quiet Communities, stated that noise pollution is linked to cardiovascular disease, sleep disruption, stress and cognitive impairment.
Bill Gates
-
Bill Gates warns AI and data centers could become the worst source of injustice without solutions addressing community concerns about energy and water
John Johnson
-
Patmos founder John Johnson told neighbors at a community meeting that generators will have mufflers and the loudest equipment will stay inside, with the site quieter than the old Walmart.
Keshaun Pearson
-
Memphis community reports cancer rate 4.1 times the national average near xAI data center
Wes Cummins
-
Lead times for gas turbine orders extend to 2032
Jason Singer
-
Jason Singer, co managing member of Plainsmen Holdings, said the project addresses common concerns about data center power and water use
Dave Schaeffer
-
There is insufficient fiber supply despite advances in transmission capacity, with hyperscalers building two or three smaller data centers in a 30-35 mile circumference instead of one in major metros
Irene Whitekiller
-
Irene Whitekiller, president of LeChee Chapter, concerned about water consumption for data center cooling
Jennifer Hawks Bland
-
NewYorkBIO calls for Governor Hochul veto and refined approach distinguishing commercial data centers from research facilities
Annalisa Bloodworth
-
Annalisa Bloodworth, chief executive of Oglethorpe Power Corp., described the EPA rule as deeply flawed and the most irrational environmental regulation she has personally encountered
Todd Brickhouse
-
Todd Brickhouse of Basin Electric Power Cooperative said renewables account for 30 percent of Basin's portfolio, but data centers' very high load factor made backup heavy systems less appealing
Demis Hassabis
-
Demis Hassabis stated achieving human level AI would unleash ten times the impact of the Industrial Revolution.
Doug McGowen
-
MLGW customers have seen no electric rate increase due to data centers in Memphis operated by SpaceXAI and other companies
Josh Skelton
-
Josh Skelton, Minnesota Power CEO, said the modernization provides flexibility when extreme weather hits, system conditions change quickly, or energy is needed in a different place than expected.
Sonja Cox
-
SMECO President and CEO Sonja Cox stated the cooperative's position is that a data center seeking to locate in Southern Maryland must directly pay the full cost of transmission or distribution construction required to connect and serve it
Edmond Jordan
-
Rep. Edmond Jordan, chairman of Louisiana Legislative Black Caucus, rejected characterization that his 2024 vote represented endorsement of data centers
Lloyd Lamberton
-
Committee goal is to put up guidelines for data centers if they come to Vanderburgh County, not to decide whether they should come
Mike Noble
-
Mike Noble, CEO of Noble Predictive Insights, said large data centers have a brand problem and are running into resistance
Olivier Le Peuch
-
Olivier Le Peuch, SLB CEO, stated that artificial intelligence is driving the most significant infrastructure investment cycle and called the transaction precipitous to the company's ambition to become an industrial technology partner to the data center industry
Scott Gromer
-
Mesa Power Solutions CEO Scott Gromer said projects like this attract Wyoming companies and Wyoming workers with jobs and supply chain staying in Wyoming
Swati Dandekar
-
Swati Dandekar, chairman of Bright Future Iowa and former Iowa Utilities Board member, states that Iowa should manage data center development with clear rules and community benefits like Google's Council Bluffs Wi Fi investment and Microsoft's Quincy water infrastructure partnership.
Kim Greene
-
Georgia Power CEO Kim Greene said growth is not pushing electric rates up in Georgia
Haley Fisackerly
-
Haley Fisackerly, Entergy Mississippi president and CEO, said data center revenues are providing benefits by covering costs of power plant replacement and grid improvements
Nick Etschied
-
LightHouse CEO Nick Etschied stated the company has invested more than $28 million in the project
Igor Stamenkovic
-
CEO Igor Stamenkovic said the larger facility will increase the company's ability to manufacture and test complete power systems domestically while creating additional jobs
Michael Flanagan
-
The facility doubled SENS's footprint from two years ago
Jon Hawkins
-
Rep. Jon Hawkins, R Pleasant Grove, chair of the Economic Development and Workforce Services Interim Committee, stated that lawmakers have received probably hundreds of emails on data centers and that it is a big concern
Jayden Speed
-
Jayden Speed, founder of Cass County Data Center Watch, raised concerns about water and electricity usage
Kyle Green
-
Rep. Kyle Green, chairman of House Democratic Caucus, says knowing what he knows now he would have voted differently on House Bill 827
Bob Frenzel
-
Our data center agreement in the Upper Midwest with Google in the quarter sets a high bar for ongoing community development and investment for data centers, protecting residential bills, advancing sustainability goals, and preserving precious water resources in the local community.
Pablo Vegas
-
Pablo Vegas, ERCOT president and CEO, stated the data center forecast is higher than expected future load growth and expressed skepticism about how much load will materialize.
J.P. Gallagher
-
J.P. Gallagher is Butte Silver Bow chief executive
Sundar Pichai
-
They say that everything is bigger in Texas and that certainly applies to the golden opportunity with AI. This investment will create thousands of jobs, provide skills training to college students and electrical apprentices, and accelerate energy affordability initiatives throughout Texas.
Scott Hinkel
-
Loring is on the backbone of the internet. When we figured out that, 'Oh, my God, we've got this huge fiber optic pipeline that comes right into the campus, and then we go, 'How much power do we have?,' we figured that out and everything shifted.
Andrew Marsh
-
Andrew Marsh, Entergy Corp. CEO, says the partnership drives economic development and builds communities
Lanham Napier
-
We are now at a point in our technology development where we can develop these resources in a very sustainable, innovative way.
Jim Trout
-
Jim Trout is CEO with experience as president of CRG West and Senior VP at Digital Realty Trust
Raul K. Martynek
-
DataBank CEO Raul K. Martynek said the purchase aligns with DataBank's strategy of owning the largest edge data center footprint in the United States.
The group comes from the words the source gives for the speaker: the name, the title and the organization. It is a reading aid, not a fact about anyone; how the groups are read.
Cite this page
Data Center Record, "Statements about data centers: Chief executives", https://datacenterrecord.org/statements/chief-executives. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.