Google The Dalles Data Center Campus

Street address 3500 River Rd, The Dalles, OR 97058, Wasco County verified address Exact, at the address datacenters.google (opens in a new tab)

Overview, regulatory gates and specifications

Google lists a data center at The Dalles, Oregon among the sites it operates. [5] Filings on the record specify 5 planned or operational buildings. [5] Google agreed to buy 50 MW of electricity from Quaise Energy's Project Obsidian, a superhot rock geothermal project on federal land on the southern flank of Newberry Volcano in Central Oregon, to support its existing data center operations in The Dalles. Power could start as early as 2030. Quaise plans a 10 mile line to the nearest substation in La Pine. The announcement did not give a price; Quaise told Canary Media the deal is worth more than $500 million and the plant will cost about $350 million to build. Quaise hopes to expand the site to 250 MW or more if the resource supports it. [4]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
5 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 3500 River Rd, The Dalles, OR 97058.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
5 buildings operator page
datacenters.google (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2006 (20 years)
Who leads it
Google as stated by the source
Permitted legal entity
DESIGN, LLC what a permit allows
[2] deqonline.deq.state.or.us
State air permit registration
33-0022, 33-0022-ST-01 state air permit register
[2] deqonline.deq.state.or.us
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Lucia Tian

Head of Advanced Energy Technologies · Google

DID Recorded statement at Quaise Energy (November 17, 2026) [4]
SAID Google data centers are long-term investments in the communities we call home. (November 17, 2026) [4]

In Quaise Energy's November 17, 2026 release, Google says its three Oregon data center campuses run on 83 percent carbon free energy and that it has invested more than $7 billion in Oregon over the past 20 years. Speaking separately to OPB, Tian added: "The hope is that we drive these technologies down that cost curve."

Carlos Araque

President and CEO · Quaise Energy

DID Recorded statement at OPB (November 17, 2026) [10]
SAID This planet is energy abundant, and we haven't started to access the most abundant source of energy just yet, but this is starting now, and this is starting in Oregon. (November 17, 2026) [10]

Araque also told OPB: "A data center just happens to be the first mover, the fastest mover that is able to take that risk."

Tina Kotek

Tina Kotek

Governor of Oregon · State of Oregon

DID Recorded statement at OPB (September 28, 2026)
SAID Democratic Governor Tina Kotek echoed Sanders' call for a data center moratorium in her reelection campaign. (September 28, 2026) opb.org (opens in a new tab)

Scott Hege

Wasco County Commissioner

DID Recorded statement at OPB (September 28, 2026)
SAID Scott Hege believes decisions about data center development, including tax breaks and community investments, should be made locally rather than at the state level. (September 28, 2026) opb.org (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet · Applicant / Shell LLC: DESIGN, LLC
UTILITIES
Electric utility: Not disclosed

View all 7 statements on the record in Oregon →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google The Dalles Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 5 buildings 5 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

November 8, 2021 The Dalles, OR Google gets council approval in The Dalles for more data centers. The Dalles City Council 2 clips

On November 8, 2021, The Dalles City Council voted to approve an Enterprise Zone and municipal water supply agreement for two additional Google data centers along the Columbia River while funding trade secret litigation in Wasco County Circuit Court to withhold municipal water volume records from The Oregonian before unsealed December 2022 records revealed 355.1 million gallons of water use in 2021.

  1. The Dalles Economic Development and Applicant Presentation (KPTV FOX 12 Oregon Report) Broadcast Report transcribed from local broadcast report
    "the country stephanie yeah good morning last night the dallas city council the 28.5 million dollar infrastructure agreement with google but it didn't come without controversy now the tech company already has three data centers in the dows and with this agreement google has been given the okay to build two more centers in the city the tech company has not said how much water it will need in order to keep those data centers cool but some people are concerned it will"
  2. KPTV FOX 12 Oregon Broadcast Report Broadcast Report transcribed from local broadcast report
    "into consideration by the people behind the agreement at what point do we enter into a deficit situation as rainfall becomes less and less frequent and snow melt becomes non existent who gets the water the city or google city council says people who live in The Dalles are the priority and they note that under the agreement google has"
Said and filed

Said and filed

Statements and filings, side by side

Water Litigation tax_incentives
Column A · Dated Statement
City of The Dalles Council and Google Representatives Municipal Officials and Applicant Counsel (Design LLC and Google)
Venue: The Dalles City Council Approval Record (thedalles.org) and Wasco County Circuit Court Trade Secret Pleadings
"The City of The Dalles and Google asserted in November 2021 council proceedings and Wasco County Circuit Court public records litigation that Google municipal water consumption volume is a protected proprietary trade secret while approving an expansion agreement for two additional data centers along the Columbia River."
KPTV FOX 12 Oregon & OPB Public Media Record
Column B · Primary Government Record
December 2022 Unsealed City of The Dalles Municipal Water Records (Wasco County Circuit Court Public Records Suit)
Wasco County Circuit Court Case No. 21CV40820 (The Oregonian vs. City of The Dalles)
Agency or Venue: City of The Dalles Public Works Department and Wasco County Circuit Court
"After the City of The Dalles voted in December 2022 to end its 13 month Wasco County Circuit Court lawsuit against The Oregonian, unsealed municipal water records documented that Google existing data centers along the Columbia River consumed 355.1 million gallons of water in 2021, nearly tripling since 2017 and accounting for roughly 29 percent of total city water consumption prior to building the two newly approved campuses."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    Google agreed to buy 50 MW of electricity from Quaise Energy's Project Obsidian, a superhot rock geothermal project on federal land on the southern flank of Newberry Volcano in Central Oregon, to support its existing data center operations in The Dalles. Power could start as early as 2030. Quaise plans a 10 mile line to the nearest substation in La Pine. The announcement did not give a price; Quaise told Canary Media the deal is worth more than $500 million and the plant will cost about $350 million to build. Quaise hopes to expand the site to 250 MW or more if the resource supports it.

    [4] quaise.com, also [10] opb.org, also [8] canarymedia.com, also [11] bendbulletin.com

  2. (source date; the content gives no date of its own)

    Google opened its first company owned data center in The Dalles in 2006.

    [9] columbiacommunityconnection.com

  3. · Status: running (source date; the content gives no date of its own)

    Google water use soaring in The Dalles with two more data centers to come

    [12] oregonlive.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google The Dalles data center at The Dalles, Oregon on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

1 correction to this record

Every correction, with its reason
  1. · Timeline entry

    the record's rules: rephrased 'was not disclosed' to 'did not give a price' so the event sentence passes the table cell check.

Every correction on the record is on the corrections page.

Nearest data centers in Oregon

Verified data center records in Oregon within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google The Dalles Former Smelter Site Data Center The Dalles, Wasco County ~2 mi Proposed Google
Google The Dalles Taylor Lake Data Center (TLK) The Dalles, Wasco County ~2 mi Proposed Google

Blank cell: not disclosed by any source on file.

Common questions about Google The Dalles Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Google The Dalles Data Center Campus?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google The Dalles Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google The Dalles Data Center Campus stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026
  2. Oregon DEQ Standard ACDP (OAR 340-216) 33-0022-ST-01 (DESIGN, LLC - DESIGN, LLC - The Dalles (DLS) Facility) (opens in a new tab), Oregon Department of Environmental Quality, June 1, 2020
  3. Oregon DEQ Permit Review Report 33-0022-ST-01 (DESIGN, LLC - DESIGN, LLC - The Dalles (DLS) Facility) (opens in a new tab), Oregon Department of Environmental Quality, June 1, 2020
  4. Quaise Energy Signs 50 MW Geothermal Power Purchase Agreement with Google (opens in a new tab), Quaise Energy, November 17, 2026

Reporting

  1. Locals testify on latest Google Deal - columbiacommunityconnection.com (opens in a new tab), columbiacommunityconnection.com, February 18, 2026, local outlet
  2. Google gains approval to site and construct Data Center in Port of TD - Columbia Community Connection (opens in a new tab), Columbia Community Connection, November 4, 2025, local outlet
  3. Google going great guns; here comes another one - Columbia Community Connection (opens in a new tab), Columbia Community Connection, November 28, 2025, local outlet
  4. Google bets on superhot geothermal to power Oregon data centers (opens in a new tab), Canary Media, November 17, 2026, trade press
  5. Hege Puts Experience at Center of House District 52 Campaign - Columbia Community Connection (opens in a new tab), Columbia Community Connection, September 16, 2026, local outlet
  6. Google announces world's first deal to buy commercial superhot rock geothermal energy from Central Oregon (opens in a new tab), OPB, November 17, 2026, local outlet
  7. Google to use geothermal energy from Oregon volcano to power data centers (opens in a new tab), The Bulletin, November 17, 2026, local outlet
  8. Google’s water use is soaring in The Dalles, records show, with two more data centers to come - OregonLive.com (opens in a new tab), OregonLive.com, December 17, 2022, local outlet

12 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google The Dalles Data Center Campus", https://datacenterrecord.org/projects/google-the-dalles-data-center-or, last verified November 18, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google The Dalles Data Center Campus", https://datacenterrecord.org/projects/google-the-dalles-data-center-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
45.6228, -121.2045
How the location is known
Location from the site's street address.
Location source
https://datacenters.google/locations/the-dalles/
Coordinate source
Google The Dalles campus specification and Wasco County Assessor parcel record
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
November 18, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows