Data Center Record.
Census GEOID: 06085 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 primary and 3 reporting sources

● Running Reported February 15, 2011 · 9 Buildings

Vantage Data Centers Santa Clara Campus (CA1 and CA3)

Street address 2820 Northwestern Parkway and 2590 Walsh Avenue, Santa Clara, CA 95051, Santa Clara County verified address Exact, at the address [2] Vantage Data Centers: Vantage Santa Clara I

Overview, regulatory gates and specifications

Vantage Data Centers operates 9 data center buildings across its Santa Clara I (Northwestern Parkway, 6 buildings, 77 MW) and Santa Clara II (Walsh Avenue, 3 buildings, 75 MW) campuses in Santa Clara County, California, totaling 152 MW. [4] Vantage Data Centers lists Vantage Santa Clara I, Vantage Santa Clara II at Santa Clara, California on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
152 MW
the developer's figure

Equivalent to ~126,160 U.S. homes (U.S. EIA 830 homes/MW baseline) · 7.3% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
9 buildings
permit filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2820 Northwestern Parkway and 2590 Walsh Avenue, Santa Clara, CA 95051.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
152 MW developer figure Equivalent to the continuous electricity demand of about 126,200 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
[2] vantage-dc.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
9 buildings permitted
[2] vantage-dc.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2011 (15 years)
Who leads it
Vantage Data Centers as stated by the source
Official project website
vantage-dc.com (opens in a new tab) verified October 28, 2026
vantage-dc.com (opens in a new tab)
Archived promotional websites
vantage-dc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Vantage Data Centers Santa Clara Campus (CA1 and CA3), capacity: 152 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 152 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Jim Trout

CEO

DID Recorded statement at Data Center Knowledge (June 1, 2024)
SAID Jim Trout is CEO with experience as president of CRG West and Senior VP at Digital Realty Trust (June 1, 2024) datacenterknowledge.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Vantage Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Vantage Data Centers Santa Clara Campus (CA1 and CA3).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 152 MW 152 MW the developer's figure [2] vantage-dc.com
Site Footprint (Acres)
Data Hall Buildings 9 buildings 9 permit filing [2] vantage-dc.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

August 19, 2026 San Jose, CA City of San Jose Data Centers and Large Energy Projects Community Session City of San Jose Office of the City Manager 3 clips

On August 19, 2026, the City of San Jose hosted an official public hearing on data centers and large energy projects to establish municipal regulations on grid capacity, backup diesel generators, and water efficiency.

  1. City of San Jose Administration Official Board & Planning Staff transcribed from the official recording
    "data center might mean. And that's why we're holding this session because community input helps guide what our priorities are, what our regulations are, what the rules of the road are in San Jose. And I want to be really clear, we are not here tonight to persuade you to be pro- data center. That is not the point of this. The goal of tonight is to understand what your concerns are and"
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "industrial land and want to consider a data center project and more importantly with the entire community what the standards are. And my view is that if a data center gets built in San Jose in the future, it ought to be under the strongest standards around labor, environment, both protecting rateayers"
  3. City of San Jose Office of the City Manager Member Elected Official transcribed from the official recording
    "beginning of our process. This is our first community listening session. As I mentioned we are in a process of developing regulations to cover all of those areas of concern. But unless we first start by hearing from you and understanding what those concerns are and really teasing out the details and what your experience is, we won't have the best possible regulatory environment. So, I'm looking forward to kicking this off. I'm going to introduce"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Digital Bridge acquired Vantage, Silicon Valley's largest wholesale data center

    [6] datacenterknowledge.com

  2. (content date)

    Vantage signed 1 megawatt customer lease in Santa Clara, opening anticipated in second quarter

    [4] datacenterknowledge.com

  3. · Status: running (source date; the content gives no date of its own)

    Vantage completed Santa Clara data center

    [5] datacenterknowledge.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Vantage Data Centers lists Vantage Santa Clara I, Vantage Santa Clara II at Santa Clara, California on its own page of data center locations, read September 14, 2026.

    [2] vantage-dc.com

Nearest data centers in California

Verified data center records in California within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2) Santa Clara, Santa Clara County Less than 1 mi Running Centersquare 43 MW
STACK Infrastructure Silicon Valley Santa Clara Campus (SVY02) Santa Clara, Santa Clara County Less than 1 mi Running STACK Infrastructure 48 MW
Equinix Santa Clara Campus (SV2, SV14, SV15, SV16, and SV17) Santa Clara, Santa Clara County Less than 1 mi Running Equinix 52 MW
CoreSite Santa Clara Campus (SV3, SV4, SV7, SV8, and SV9) Santa Clara, Santa Clara County Less than 1 mi Running CoreSite 85 MW
Digital Realty Santa Clara (SJC18 1725 Comstock Street) Santa Clara, Santa Clara County Less than 1 mi Running Digital Realty 1 building
Digital Realty Santa Clara (SJC11 1100 Space Park Drive) Santa Clara, Santa Clara County Less than 1 mi Running Digital Realty 1 building

Blank cell: not disclosed by any source on file.

Common questions about Vantage Data Centers Santa Clara Campus (CA1 and CA3)

Answered directly from the verified filings and local actions on this page.

Who is building Vantage Data Centers Santa Clara Campus (CA1 and CA3)?

Vantage Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Vantage Data Centers Santa Clara Campus (CA1 and CA3) say it needs?

Power: 152 MW (the developer's figure, vantage-dc.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Vantage Data Centers Santa Clara Campus (CA1 and CA3) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Vantage Data Centers: Data center locations (opens in a new tab), Vantage Data Centers, September 14, 2026
  2. Vantage Data Centers: Vantage Santa Clara I (opens in a new tab), Vantage Data Centers, September 14, 2026
  3. Vantage Data Centers: Vantage Santa Clara II (opens in a new tab), Vantage Data Centers, September 14, 2026

Reporting

  1. Vantage Lines Up 1 Megawatt Lease in Santa Clara - Data Center Knowledge (opens in a new tab), Data Center Knowledge, February 28, 2013, trade press
  2. Vantage Completes Santa Clara Data Center - Data Center Knowledge (opens in a new tab), Data Center Knowledge, February 15, 2011, trade press
  3. Digital Bridge Buys Vantage, Silicon Valley's Largest Wholesale - Data Center Knowledge (opens in a new tab), Data Center Knowledge, March 27, 2017, trade press

6 sources on file.

Regional grid context

This site is in the WECC California (CAMX) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Vantage Data Centers Santa Clara Campus (CA1 and CA3)", https://datacenterrecord.org/projects/vantage-data-centers-santa-clara-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Vantage Data Centers Santa Clara Campus (CA1 and CA3)", https://datacenterrecord.org/projects/vantage-data-centers-santa-clara-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
37.3725, -121.9695
How the location is known
Location from the site's street address.
Location source
https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/
Coordinate source
CEC SPPE Dockets / Vantage Santa Clara I and II specifications
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
152 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Vantage Data Centers Santa Clara Campus (CA1 and CA3) · 6 sources, 4 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON