DeepGreen proposed an underwater AI data center off the coast of Eastport, scaled down to 15 MW and a 27.1 acre active infrastructure footprint with 16 turbines in Phase I, and filed a 48 month preliminary permit application with FERC in February 2026, though Eastport enacted a 180 day moratorium on the project in August 2026. It is reported, as reported August 10, 2026.

How much water it would use and who would use it have not been disclosed.

Last verified · 23 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
15 MW
not disclosed
Water
Not disclosed
Who leads it
DeepGreen
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 15 MW not disclosed September 17, 2026
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it DeepGreen as stated by the source September 17, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. (source date; the content gives no date of its own)

    FERC accepted DeepGreen permit application for filing in August [2]

  2. (source date; the content gives no date of its own)

    DeepGreen Western Passage SPV LLC applied to FERC in February for 48 month preliminary permit [2]

  3. (source date; the content gives no date of its own)

    Louis Wolfson applied in February to FERC for a 48 month preliminary permit [1]

  4. (source date; the content gives no date of its own)

    FERC accepted DeepGreen Western Passage SPV LLC's preliminary permit application in August [1]

  5. (source date; the content gives no date of its own)

    DeepGreen Western Passage applied to FERC in February 2026 for a permit to explore putting a data center underwater in Johnson Cove, Passamaquoddy Bay [7]

  6. · Status: rumored (source date; the content gives no date of its own)

    DeepGreen Western Passage SPV LLC applied for a 48 month preliminary permit with the Federal Energy Regulatory Commission for a tidal powered underwater AI data center [8]

The full DeepGreen Western Passage Underwater AI Data Center timeline, in order

34 corrections to this record

Every correction, with its reason
  1. · the summary of a record items row

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word The old and new text.

  2. · the status of a projects row

    The stage was set by timeline entries that were returned to draft on 2026-09-17 (they had been published onto the record while it was still a draft skeleton). With no published entry behind it the record reads rumored until one is approved. The old and new text.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  4. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  5. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  6. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  7. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  8. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  9. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  10. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  11. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  12. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  13. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  14. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  15. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  16. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  17. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  18. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  19. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  20. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  21. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  22. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  23. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  24. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  25. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  26. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  27. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  28. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  29. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  30. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  31. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  32. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  33. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  34. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

Every correction on the record is on the corrections page.

What was said

Jack Shapiro, NRCM Climate & Clean Energy Director, said 'No big development project deserves a free pass, especially here in Maine where we value our clean water, healthy forests, abundant wildlife, and way of life rooted in the outdoors.'
Jack Shapiro, NRCM Climate & Clean Energy Director · September 28, 2026 · paraphrased · Natural Resources Council of Maine local outlet
Developer Louis Wolfson said preliminary permit is a license to study, not a license to construct
Louis Wolfson, managing member of DeepGreen Holdings LLC · September 7, 2026 · paraphrased · newscentermaine.com national outlet

Every statement about data centers in Maine, by speaker

4 more statements on this page

City Council expressed unanimous opposition to underwater AI data center construction in Eastport waters

September 7, 2026, newscentermaine.com · newscentermaine.com national outlet · the record (Paraphrased; said in the source itself)

Passamaquoddy community historian

Dwayne Tomah, historian from Sipayik Passamaquoddy community, stated the project represents a national backlash against data center facilities

August 11, 2026, Bangor Daily News · Bangor Daily News local outlet · the record (Paraphrased; said in the source itself)

Eastport City Manager Brian Schuth said the proposal is equivalent to an idea scrawled on a bar napkin by very smart people who may not know if it's possible

August 11, 2026, Bangor Daily News · Bangor Daily News local outlet · the record (Paraphrased; said in the source itself)

Louis Wolfson, DeepGreen Western Passage managing member

Company said it wants to create a sealed, behind the meter facility that would not use outside power.

August 10, 2026, Maine Public · Maine Public local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Washington County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 3 other published records in Maine
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Eastport, Washington County, Maine
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is DeepGreen Western Passage Underwater AI Data Center?

The record has one measure of its size: 15 MW (not disclosed). Its acreage is not disclosed.

Who is building DeepGreen Western Passage Underwater AI Data Center?

DeepGreen is the developer. No construction contractor is named on the record yet.

How much power and water does DeepGreen Western Passage Underwater AI Data Center say it needs?

Power: 15 MW (not disclosed). Water: not disclosed by any source on file.

Where does DeepGreen Western Passage Underwater AI Data Center stand today?

It is reported, as reported August 10, 2026. The newest entry, reported September 7, 2026: FERC accepted DeepGreen permit application for filing in August [2].

What has Eastport or Washington County decided about it?

No decision by Eastport or Washington County about data centers is on the record. The Washington County page and the Maine scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Residents seek formal role in federal review as Eastport considers ban on underwater data center - The Maine Monitor, The Maine Monitor, September 4, 2026, local outlet
  2. Residents seek formal role in federal review as Eastport considers ban on underwater data center - newscentermaine.com, newscentermaine.com, September 7, 2026, local outlet
  3. Eastport Council unanimously adopts moratorium on DeepGreen underwater data center proposal - The Maine Monitor, The Maine Monitor, August 13, 2026, local outlet
  4. Needham developer proposes underwater AI data centers off Maine coast - Needham Observer, Needham Observer, May 14, 2026, local outlet
  5. planet maine vol. 36: Eastport’s data center resistance - mainepublic.org, mainepublic.org, August 26, 2026, local outlet
  6. Proposed data center inches closer to reality - newscentermaine.com, newscentermaine.com, September 1, 2026, local outlet
  7. Eastport united in opposition to underwater data center proposal - Bangor Daily News, Bangor Daily News, August 11, 2026, local outlet
  8. Ordinance requiring voter approval for data centers called 'unlawful’ - The Maine Monitor, The Maine Monitor, August 10, 2026, local outlet
  9. Federal regulators accept preliminary permit for underwater data center off Eastport - Bangor Daily News, Bangor Daily News, August 24, 2026, local outlet
  10. Eastport residents seek formal role in federal review of proposed underwater data center, Bangor Daily News, September 8, 2026, local outlet
  11. Proposed underwater AI data center advances in federal review, raising concerns in Eastport - newscentermaine.com, newscentermaine.com, August 31, 2026, local outlet
  12. Eastport AI data center proposal advances amid local concerns - newscentermaine.com, newscentermaine.com, September 1, 2026, local outlet
11 more sources
  1. Eastport underwater AI data center moves forward in federal review - newscentermaine.com, newscentermaine.com, September 1, 2026, local outlet
  2. Advisory group asking for public input on future of data centers in Maine - Maine Morning Star, Maine Morning Star, August 25, 2026, local outlet
  3. Eastport divided over proposed underwater data center - newscentermaine.com, newscentermaine.com, September 1, 2026, local outlet
  4. Eastport community is divided over proposed underwater data center - newscentermaine.com, newscentermaine.com, September 1, 2026, local outlet
  5. Proposed Eastport underwater AI data center off coast one step closer - newscentermaine.com, newscentermaine.com, August 31, 2026, local outlet
  6. Ordinance that would prohibit DeepGreen data-center project in Eastport scheduled for hearing in August - The Maine Monitor, The Maine Monitor, July 17, 2026, local outlet
  7. Coalition of Eastport residents submits petition to prohibit large data center project - The Maine Monitor, The Maine Monitor, June 26, 2026, local outlet
  8. Proposed Eastport underwater AI data center advances - WABI, WABI, August 21, 2026, local outlet
  9. The One Town That Wants a Data Center - The Atlantic, The Atlantic, August 3, 2026, local outlet
  10. Proposed Eastport underwater AI data center advances - WABI, WABI, August 21, 2026, local outlet
  11. A week after Eastport banned data centers for 180 days, federal regulators accepted the underwater AI project’s application - NationofChange, NationofChange, August 25, 2026, local outlet

23 sources on file.

Cite this record

Data Center Record, "DeepGreen Western Passage Underwater AI Data Center", https://datacenterrecord.org/projects/deepgreen-western-passage-underwater-ai-data-center-eastport-me, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "DeepGreen Western Passage Underwater AI Data Center", https://datacenterrecord.org/projects/deepgreen-western-passage-underwater-ai-data-center-eastport-me. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
deepgreen-western-passage-underwater-ai-data-center-eastport-me
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/me/washington-county/eastport
Coordinates
44.68333, -67.46667
Location precision
county
Location source
County seat (Machias), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
15 MW, not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified