Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 2 primary and 33 reporting sources
Vantage Data Centers lists a data center at Shackelford County, Texas among the sites it operates. [3] Filings on the record specify disclosed capacity of 1.4 GW (the developer's figure), a 1,200 acre site footprint, 2 planned or operational buildings, closed loop liquid cooling. [2] Vantage Data Centers lists Vantage Shackelford County at Shackelford County, Texas on its own page of data center locations, read September 14, 2026. [2]
Equivalent to ~1,162,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 67% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
Cooling system: Closed loop liquid. Closed loop chillers recirculate fluid rather than evaporating continuous potable water.
No local property tax abatement amount disclosed in public filings.
2 planned or operational data hall buildings.
Location: 8500 US Highway 180 West, Vantage Frontier Mega Campus, Albany, TX 76430.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Texas has become a critical and strategic market for AI providers. In particular, the launch of our Frontier campus with 1.4GW of GPU compute capacity marks a watershed moment for Vantage as we deliver on our promise to meet the unprecedented requirements of our customers. This investment in Texas will be a significant economic growth driver for the area as we rapidly deploy the digital infrastructure needed to support AI applications. We look forward to being part of such a welcoming and proud community.(August 20, 2025) wirelessestimator.com (opens in a new tab)
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Vantage Shackelford County.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 1.4 GW | 1.4 GW | the developer's figure [2] vantage-dc.com |
| Site Footprint (Acres) | 1,200 acres | 1,200 acres | the developer's figure [2] vantage-dc.com |
| Data Hall Buildings | 2 buildings | 2 | 2 Phase 1 buildings on the 1,200 acre Frontier mega campus (10 ultra high density buildings totaling 3.7 million sq ft planned at full buildout) per Vantage Data Centers specification and Shackelford County Chapter 312 agreement [2] vantage-dc.com |
| Cooling & Water System | Closed loop liquid | Company / permit specification [2] vantage-dc.com | |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
Vantage Data Centers lists Vantage Shackelford County at Shackelford County, Texas on its own page of data center locations, read September 14, 2026.
Verified data center records in Texas within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Google Haskell County data center Haskell, Haskell County | 40 mi | Being built | 2 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Vantage Data Centers is the developer, vantage-dc.com (opens in a new tab). No construction contractor is named on the record yet.
Power: 1.4 GW (the developer's figure, vantage-dc.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Official operator or facility campus page verified in 50 state website discovery pass.
35 sources on file.
This site is in the ERCOT All (ERCT) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Vantage Shackelford County. Last verified November 9, 2026. https://datacenterrecord.org/projects/vantage-shackelford-county-tx. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Vantage Shackelford County
Data Center Record, "Vantage Shackelford County", https://datacenterrecord.org/projects/vantage-shackelford-county-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.