Census GEOID: 48417 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and 33 reporting sources

● Running First recorded September 14, 2026 · 2 Buildings

Vantage Shackelford County

Street address 8500 US Highway 180 West, Vantage Frontier Mega Campus, Albany, TX 76430, Shackelford County verified address Exact, at the address [2] County seat (Albany), Wikidata, placed at county level

Overview, regulatory gates and specifications

Vantage Data Centers lists a data center at Shackelford County, Texas among the sites it operates. [3] Filings on the record specify disclosed capacity of 1.4 GW (the developer's figure), a 1,200 acre site footprint, 2 planned or operational buildings, closed loop liquid cooling. [2] Vantage Data Centers lists Vantage Shackelford County at Shackelford County, Texas on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
1,200 acres on file
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Commercial data center facil
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
1.4 GW
the developer's figure

Equivalent to ~1,162,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 67% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water [2]
Closed loop liquid
Daily water volume not stated in public filings

Cooling system: Closed loop liquid. Closed loop chillers recirculate fluid rather than evaporating continuous potable water.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1,200 acres
the developer's figure

2 planned or operational data hall buildings.

Location: 8500 US Highway 180 West, Vantage Frontier Mega Campus, Albany, TX 76430.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
1.4 GW developer figure Equivalent to the continuous electricity demand of about 1,162,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data, or about 0.7 times the 2,080 MW generating capacity of Hoover Dam. About 0.14 times New York City's summer peak demand in 2024.
[2] vantage-dc.com
Water usage
Not disclosed
Land area
1,200 acres developer figure
[2] vantage-dc.com
Buildings
2 buildings operator page
[2] vantage-dc.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2021 (5 years)
Who leads it
Vantage Data Centers attributed via corporate HQ or property filing
[2] vantage-dc.com
How it is cooled
Closed loop liquid as stated by the source
[2] vantage-dc.com
Permitted legal entity
Vantage Data Centers TX11, LLC what a permit allows
[2] vantage-dc.com
State permit status
Commercial data center facility specification and local appraisal district property record (8500 US Highway 180 West, Vantage Frontier Mega Campus, Albany, TX 76430) the state's permit register, last verified November 9, 2026
[2] vantage-dc.com
Official project website
vantage-dc.com (opens in a new tab) verified October 28, 2026
vantage-dc.com (opens in a new tab)
Archived promotional websites
vantage-dc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Vantage Shackelford County, capacity: 1,400 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 1,400 ÷ 10,245 = 0.14 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Dana Adams

President of North America · Vantage Data Centers

DID Recorded statement at Company announcement (August 20, 2025)
SAID Texas has become a critical and strategic market for AI providers. In particular, the launch of our Frontier campus with 1.4GW of GPU compute capacity marks a watershed moment for Vantage as we deliver on our promise to meet the unprecedented requirements of our customers. This investment in Texas will be a significant economic growth driver for the area as we rapidly deploy the digital infrastructure needed to support AI applications. We look forward to being part of such a welcoming and proud community. (August 20, 2025) wirelessestimator.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Vantage Data Centers · Applicant / Shell LLC: Vantage Data Centers TX11, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Vantage Shackelford County.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 1.4 GW 1.4 GW the developer's figure [2] vantage-dc.com
Site Footprint (Acres) 1,200 acres 1,200 acres the developer's figure [2] vantage-dc.com
Data Hall Buildings 2 buildings 2 2 Phase 1 buildings on the 1,200 acre Frontier mega campus (10 ultra high density buildings totaling 3.7 million sq ft planned at full buildout) per Vantage Data Centers specification and Shackelford County Chapter 312 agreement [2] vantage-dc.com
Cooling & Water System Closed loop liquid Company / permit specification [2] vantage-dc.com
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Vantage Data Centers lists Vantage Shackelford County at Shackelford County, Texas on its own page of data center locations, read September 14, 2026.

    [2] vantage-dc.com

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Haskell County data center Haskell, Haskell County 40 mi Being built Google 2 buildings

Blank cell: not disclosed by any source on file.

Common questions about Vantage Shackelford County

Answered directly from the verified filings and local actions on this page.

Who is building Vantage Shackelford County?

Vantage Data Centers is the developer, vantage-dc.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Vantage Shackelford County say it needs?

Power: 1.4 GW (the developer's figure, vantage-dc.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Vantage Shackelford County stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Vantage Data Centers: Data center locations (opens in a new tab), Vantage Data Centers, September 14, 2026
  2. Vantage Data Centers: Vantage Shackelford County (opens in a new tab), Vantage Data Centers, September 14, 2026

Reporting

  1. 1,200-acre data center in Shackelford County could boost local economy – KTAB - BigCountryHomepage.com (opens in a new tab), BigCountryHomepage.com, July 30, 2025, news outlet
  2. Is gas really winning the AI race? - Latitude Media (opens in a new tab), Latitude Media, August 27, 2025, news outlet
  3. AI-fueled data centers' construction boom moves into West Texas - El Paso Times (opens in a new tab), El Paso Times, November 10, 2025, local outlet
  4. Vantage Invests US$25bn in Mega-Campus for AI Data Centres - Construction Digital (opens in a new tab), Construction Digital, August 21, 2025, news outlet
  5. Big Country data centers: Where they are & what’s coming - BigCountryHomepage.com (opens in a new tab), BigCountryHomepage.com, June 1, 2026, news outlet
  6. Inside Frontier: Vantage Data Centers’ $25B Hyperscale Campus in Texas - Construction Review (opens in a new tab), Construction Review, January 23, 2026, news outlet
  7. Vantage breaks ground on Texas gigawatt data center campus for OpenAI - Data Center Dynamics (opens in a new tab), Data Center Dynamics, December 15, 2025, news outlet
  8. Vantage files to build another data center in San Antonio, Texas - Data Center Dynamics (opens in a new tab), Data Center Dynamics, October 15, 2025, news outlet
  9. Vantage plots 1.4GW data center campus in Texas - Data Center Dynamics (opens in a new tab), Data Center Dynamics, August 19, 2025, news outlet
  10. Vantage Breaks Ground on 1.4GW Texas Data Center for OpenAI - constructionowners.com (opens in a new tab), constructionowners.com, December 16, 2025, news outlet
  11. OpenAI marks Texas Stargate site as shift toward physical AI infrastructure | ETIH EdTech News - EdTech Innovation Hub (opens in a new tab), EdTech Innovation Hub, December 15, 2025, news outlet
  12. Oracle and OpenAI's second Stargate data center in Texas will be powered off the grid - Business Insider (opens in a new tab), Business Insider, October 23, 2025, national outlet
21 more sources
  1. Vantage Data Centers breaks ground on data center campus in Texas - W.Media (opens in a new tab), W.Media, December 16, 2025, news outlet
  2. Vantage Data Centers unveils plans for a $25b mega-campus in Texas to meet AI demand - Institutional Real Estate, Inc. (opens in a new tab), Institutional Real Estate, Inc., August 19, 2025, news outlet
  3. Oracle to back massive 1.4-gigawatt gas-powered data center in US - Interesting Engineering (opens in a new tab), Interesting Engineering, August 21, 2025, news outlet
  4. Vantage Data Centers Unveils “Frontier,” a $25B Mega-campus in Texas - Inside Towers (opens in a new tab), Inside Towers, August 20, 2025, news outlet
  5. DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas “Frontier” Mega-Campus - Business Wire (opens in a new tab), Business Wire, August 19, 2025, press release
  6. Vantage Develops $25B Data Center in Texas - CommercialSearch (opens in a new tab), CommercialSearch, August 20, 2025, news outlet
  7. Vantage’s $25 Billion Texas Data Center Plan Sparks Opportunities—and Water Concerns - CarbonCredits.com (opens in a new tab), CarbonCredits.com, August 21, 2025, news outlet
  8. Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas - Intelligent CIO (opens in a new tab), Intelligent CIO, August 29, 2025, news outlet
  9. Vantage Data Centers to build data center campus in Texas - Inspenet (opens in a new tab), Inspenet, August 21, 2025, news outlet
  10. Vantage Launching $25B Data Center Campus Near Abilene - Connect CRE (opens in a new tab), Connect CRE, August 19, 2025, news outlet
  11. $25 billion data center campus slated for rural area near Abilene - The Business Journals (opens in a new tab), The Business Journals, August 20, 2025, local outlet
  12. JPMorgan and MUFG close to securing $22bn financing for Vantage's Texas data center project - Data Center Dynamics (opens in a new tab), Data Center Dynamics, August 20, 2025, news outlet
  13. New data center expected to create 250 full time jobs in Shackelford county - KTXS (opens in a new tab), KTXS, August 1, 2025, local outlet
  14. Inside Vantage's US$25bn AI Data Centre Mega-Campus in Texas - technologymagazine.com (opens in a new tab), technologymagazine.com, August 19, 2025, news outlet
  15. Vantage Data Centers to Invest $25B for Mega-Campus in Shackelford County, Texas - REBusinessOnline (opens in a new tab), REBusinessOnline, August 19, 2025, news outlet
  16. Vantage Data Centers Unveils Plans for “Frontier,” a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Business Wire (opens in a new tab), Business Wire, August 19, 2025, news outlet
  17. Explore Vantage’s New US$25bn AI Data Centre Campus in Texas - Data Centre Magazine (opens in a new tab), Data Centre Magazine, August 20, 2025, news outlet
  18. Vantage Data Centers plans $25 billion AI campus in Texas - Reuters (opens in a new tab), Reuters, August 19, 2025, national outlet
  19. OpenAI announces five more US Stargate data centers with Oracle and SoftBank - Data Center Dynamics (opens in a new tab), Data Center Dynamics, September 24, 2025, news outlet
  20. Vantage plots 1,000-acre data center campus in Texas - Data Center Dynamics (opens in a new tab), Data Center Dynamics, July 28, 2025, news outlet
  21. 1,200-acre data center in Shackelford County could boost local economy - BigCountryHomepage.com (opens in a new tab), BigCountryHomepage.com, July 30, 2025, news outlet

35 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Vantage Shackelford County", https://datacenterrecord.org/projects/vantage-shackelford-county-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Vantage Shackelford County", https://datacenterrecord.org/projects/vantage-shackelford-county-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
32.7245, -99.3585
How the location is known
Location from the site's street address.
Location source
County seat (Albany), Wikidata, placed at county level
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Cooling
Closed loop liquid
How capacity was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
1.4 GW, the developer's figure
Published
September 14, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, How water was disclosed, Interconnection, Rating of the county's rows

Researcher view · Vantage Shackelford County · 35 sources, 1 entry · basis and source tier on every row · verified November 9, 2026

Download CSV JSON