Data Center Record.
Census GEOID: 48207 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 8 reporting sources

● Being Built First recorded September 14, 2026 · 2 Buildings

Google Haskell County data center

Street address 4500 US Highway 277 North, Haskell County Reinvestment Zone, Haskell, TX 79521 permit coordinates Exact, the point of the EPA's facility record [1] County seat (Haskell), Wikidata, placed at county level

Overview, regulatory gates and specifications

Google lists a data center at Haskell County, Texas and says it is being built. [2] Filings on the record specify 2 planned or operational buildings. [1] Google lists Google Haskell County data center at Haskell County, Texas on its own page of data center locations, read September 14, 2026. [1]

Verified Site & Permit Summary
Verified address
4500 US Highway 277 North, Haskell County Reinvestment Zone, Haskell, TX 79521 permit coordinates
Operator / developer
Google
Permit / registry ID
Commercial data center facility specification and local appraisal district property record (4500 US Highway 277 North, Haskell County Reinvestment Zone, Haskell, TX 79521) [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings permitted
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Google attributed via corporate HQ or property filing
[1] datacenters.google
Permitted legal entity
Google Texas Operations what a permit allows
[1] datacenters.google
State permit status
Commercial data center facility specification and local appraisal district property record (4500 US Highway 277 North, Haskell County Reinvestment Zone, Haskell, TX 79521) the state's permit register, last verified November 9, 2026
[1] datacenters.google
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet · Applicant / Shell LLC: Google
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Haskell County data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 data center buildings verified via primary operator campus specification and EPA ECHO / TCEQ facility permit record [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Haskell County data center at Haskell County, Texas on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

1 correction to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article

Every correction on the record is on the corrections page.

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Vantage Shackelford County Albany, Shackelford County 40 mi Running Vantage Data Centers 1.4 GW

Blank cell: not disclosed by any source on file.

Common questions about Google Haskell County data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Haskell County data center?

Google is the developer, datacenters.google (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Google Haskell County data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google Haskell County data center stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

Reporting

  1. Google's parent buys data center energy specialist for $4.75B to help power AI - Post and Courier (opens in a new tab), Post and Courier, December 22, 2025, local outlet
  2. Google to invest $40 billion in Texas through 2027 - cnbc.com (opens in a new tab), cnbc.com, November 14, 2025, national outlet
  3. ‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India (opens in a new tab), The Times of India, November 19, 2025, international outlet
  4. Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com (opens in a new tab), dallasnews.com, November 14, 2025, local outlet
  5. Google plans to invest $40 billion towards building data centers in Texas - Engadget (opens in a new tab), Engadget, November 16, 2025, news outlet
  6. Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai (opens in a new tab), MLQ.ai, November 15, 2025, news outlet
  7. Google is spending $40 billion to build 3 new data centers in Texas - Fast Company (opens in a new tab), Fast Company, November 21, 2025, national outlet
  8. Google Earmarks $40B for Texas Digital Development - CommercialSearch (opens in a new tab), CommercialSearch, November 19, 2025, news outlet

9 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Haskell County data center", https://datacenterrecord.org/projects/google-haskell-county-data-center-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Haskell County data center", https://datacenterrecord.org/projects/google-haskell-county-data-center-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
33.2125, -99.7185
How the location is known
Location from an EPA facility record.
Location source
County seat (Haskell), Wikidata, placed at county level
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 14, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Google Haskell County data center · 9 sources, 1 entry · basis and source tier on every row · verified November 9, 2026

Download CSV JSON