Data Center Record.
Census GEOID: 26027 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 16 reporting sources

● Being Built Reported August 10, 2026 · 1 Building

Hyperscale Data Dowagiac AI Data Center

Street address 415 East Prairie Ronde Street, Dowagiac, MI 49047, Cass County verified address Exact, at the address [1] wwmt.com

Overview, regulatory gates and specifications

Hyperscale Data ceased cryptocurrency mining at its 617,000 square foot facility in Dowagiac, Cass County, Michigan in September 2026 and is converting the campus into a 52 megawatt AI data center. [4] Filings on the record specify disclosed capacity of 52 MW (the developer's figure), 1 planned or operational building. [1] Hyperscale Data Inc. data center in Dowagiac operated as bitcoin mining facility with fan based cooling until early September 2026, causing noise concerns. [11]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
52 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand [1]
52 MW
the developer's figure

Equivalent to ~43,160 U.S. homes (U.S. EIA 830 homes/MW baseline) · 2.5% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 415 East Prairie Ronde Street, Dowagiac, MI 49047.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
52 MW developer figure Equivalent to the continuous electricity demand of about 43,200 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.5 percent of New York City's summer peak demand in 2024.
[1] wwmt.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] wwmt.com
Backup generators
Not disclosed
Capital investment
$70 million developer figure
[10] benzinga.com
Who leads it
Hyperscale Data as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Hyperscale Data Dowagiac AI Data Center, capacity: 52 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 52 ÷ 10,245 = 0.0051 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Milton Ault III

Executive Chairman of Hyperscale Data

DID Recorded statement at Morningstar (September 22, 2026)
SAID Milton Ault stated Bitcoin mining and AI data center development have different capital requirements, operating priorities and value drivers (September 22, 2026) prnewswire.com (opens in a new tab)

Hyperscale Data Inc

Public Record Speaker

DID Recorded statement at GuruFocus (September 14, 2026) [6]
SAID Management does not plan to recommend sale below $750 million (September 14, 2026) [6]

William Horne

Hyperscale Data CEO

DID Recorded statement at Data Center Dynamics (September 3, 2026) [2]
SAID William Horne, Hyperscale Data CEO, said the facility is being prepared for AI usage and customer deployment. (September 3, 2026) [2]
Donald Trump

Donald Trump

President · US federal government

DID Recorded statement at Michigan House Republicans (August 31, 2026)
SAID President Donald Trump argued that communities should embrace data centers and warned that widespread opposition could put the United States at a competitive disadvantage with China (August 31, 2026) gophouse.org (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Hyperscale Data
UTILITIES
Electric utility: Not disclosed

View all 6 statements on the record in Michigan →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Hyperscale Data Dowagiac AI Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 52 MW the developer's figure [1] wwmt.com
Site Footprint (Acres)
Data Hall Buildings 1 building operator page [1] wwmt.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Hyperscale Data facility will resume operations in November 2026 supporting artificial intelligence computing.

    [11] detroitnews.com

  2. (source date; the content gives no date of its own)

    Hyperscale Data Inc. data center in Dowagiac operated as bitcoin mining facility with fan based cooling until early September 2026, causing noise concerns.

    [11] detroitnews.com

  3. (source date; the content gives no date of its own)

    Company plans to resume operations in Dowagiac in November with new equipment for AI computing

    [15] detroitnews.com

  4. (source date; the content gives no date of its own)

    Hyperscale Data Inc. ceased bitcoin mining operation on September 2 to retool facility for artificial intelligence computing

    [15] detroitnews.com

  5. (source date; the content gives no date of its own)

    Customer has right to increase critical AI compute capacity up to 52 MW

    [9] prnewswire.com

  6. (source date; the content gives no date of its own)

    Initial Master Services Agreement provides for 20 megawatts of critical AI compute capacity with 10 year initial term plus two 5 year extension options

    [9] prnewswire.com

  7. (source date; the content gives no date of its own)

    Operations under Master Services Agreement expected to begin in November 2026

    [9] prnewswire.com

  8. (source date; the content gives no date of its own)

    The company is working toward commencing operations under a previously announced master services agreement in November 2026

    [14] investing.com

24 earlier entries
  1. (source date; the content gives no date of its own)

    The master services agreement provides for an initial 20 megawatts of critical AI compute capacity and has an initial 10 year term with two five year extension options

    [14] investing.com

  2. (source date; the content gives no date of its own)

    Hyperscale Data has invested more than $70 million into its Michigan AI data center facility as of September 15, 2026

    [14] investing.com

  3. (source date; the content gives no date of its own)

    Michigan facility targeting November 2026 start for 20 MW contract with Alliance Cloud Services

    [10] benzinga.com

  4. (source date; the content gives no date of its own)

    Alliance Cloud Services executed master services agreement with California based customer for initial 20 MW deployment at Michigan Campus

    [5] prnewswire.com

  5. (source date; the content gives no date of its own)

    Customer has rights to additional 32 MW of capacity at Michigan campus.

    [8] investing.com

  6. (source date; the content gives no date of its own)

    Master services agreement initial 10 year term with two five year extension options.

    [8] investing.com

  7. (source date; the content gives no date of its own)

    Alliance Cloud Services master services agreement with neocloud provider for deployment of 20 megawatts of AI compute capacity at Michigan campus.

    [8] investing.com

  8. (source date; the content gives no date of its own)

    Management exploring options including selling campus, IPO of Sentinum subsidiary or continued development

    [7] pluang.com

  9. (source date; the content gives no date of its own)

    New 20 megawatt contract with California cloud provider

    [7] pluang.com

  10. (source date; the content gives no date of its own)

    Company is evaluating options including sale, continued development or IPO of Sentinum subsidiary

    [4] benzinga.com

  11. (source date; the content gives no date of its own)

    Campus could eventually support more than 300 megawatts

    [4] benzinga.com

  12. (source date; the content gives no date of its own)

    20 megawatt master services agreement with California cloud provider has 10 year term and two five year extension options

    [4] benzinga.com

  13. (source date; the content gives no date of its own)

    Hyperscale Data explores sale or IPO of Michigan AI data center campus targeting valuation between $750 million and $1.25 billion

    [4] benzinga.com

  14. (source date; the content gives no date of its own)

    Hyperscale Data is evaluating options including outright sale, continued development or initial public offering of Sentinum subsidiary

    [6] gurufocus.com

  15. (source date; the content gives no date of its own)

    Michigan campus could eventually support more than 300 megawatts, depending on financing, regulatory approvals, utility agreements and customer demand

    [6] gurufocus.com

  16. (source date; the content gives no date of its own)

    Alliance Cloud Services signed a master services agreement covering initial 20 megawatts of AI computing capacity with 10 year term and two five year extension options

    [6] gurufocus.com

  17. (source date; the content gives no date of its own)

    Hyperscale Data is converting the Michigan site into an AI data center

    [16] forklog.com

  18. (source date; the content gives no date of its own)

    Hyperscale Data ceased bitcoin mining in Michigan

    [16] forklog.com

  19. (source date; the content gives no date of its own)

    Unnamed California based neocloud customer signed lease agreement with Hyperscale Data in June 2026.

    [2] datacenterdynamics.com

  20. · being built (source date; the content gives no date of its own)

    Hyperscale Data ceased all Bitcoin mining operations on September 1, 2026, at its Dowagiac, Michigan facility.

    [2] datacenterdynamics.com

  21. · running (content date)

    Hyperscale Data ceased Bitcoin mining at its 617,000 square foot Dowagiac, Michigan facility on September 1, 2026, and is converting it for a California neocloud customer deploying 20MW in Q4 2026 with potential to scale to 52MW under a 10 year lease.

    [1] wwmt.com

  22. (source date; the content gives no date of its own)

    The master services agreement with a California neocloud provider is for deployment of 20 megawatts with an initial term of 10 years and two five year extension options

    [13] prnewswire.com

  23. (source date; the content gives no date of its own)

    Hyperscale Data ceased all Bitcoin mining operations at its Michigan data center effective September 1, 2026

    [13] prnewswire.com

  24. · being built (source date; the content gives no date of its own)

    De Soto City Council approved Development Agreement with Mount Sunflower, LLC in August 2025

    [12] cjonline.com

Every event in order

25 corrections to this record

Every correction, with its reason
  1. · Timeline entry

    Normalize vote tallies ('X to Y') and dollar figures ('$X million/billion') to house style.

  2. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Kansas, and this record is in Michigan. Kept off the record, never deleted; it can be restored.

  3. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Kansas, and this record is in Michigan. Kept off the record, never deleted; it can be restored.

  4. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Kansas, and this record is in Michigan. Kept off the record, never deleted; it can be restored.

  5. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Kansas, and this record is in Michigan. Kept off the record, never deleted; it can be restored.

  6. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Kansas, and this record is in Michigan. Kept off the record, never deleted; it can be restored.

  7. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Kansas, and this record is in Michigan. Kept off the record, never deleted; it can be restored.

  8. · Project summary

    the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article

  9. · Speaker role

    Speaker read again from the statement's source line, "President Donald Trump": the title in front of the name (President) is the role, not part of the name.

  10. · Speaker

    Speaker read again from the statement's source line, "President Donald Trump": the title in front of the name (President) is the role, not part of the name.

  11. · Speaker

    Speaker read again from the statement's source line, "Rep. Steve Carra, Michigan House of Representatives": the title in front of the name (Representative) is the role, not part of the name.

  12. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  13. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  14. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  15. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives datacenterdynamics.com. The link did not change.

See all 23 corrections for this record (8 more) →

Every correction on the record is on the corrections page.

Nearest data centers in Michigan

Verified data center records in Michigan within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Aunalytics Kalamazoo Data Center Kalamazoo, Kalamazoo County 29 mi Running Aunalytics 4 MW
Microsoft Dorr Township Data Center Dorr Township, Allegan County 58 mi Proposed Microsoft 4 buildings

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

4 figures, 4 sources
52 MW Developer's figure

WWMT, Nov 10, 2025

Show each source's words
  • 52 MW, Data Center Dynamics: Customer could scale up to 52MW of compute capacity at Dowagiac facility.
  • 30 MW, Data Center Dynamics: Facility currently operates with 30MW of capacity and company aims to expand to 340MW including 40MW of behind the meter natural gas capacity.
  • 30 MW, The Detroit News: Hyperscale Data facility capacity is 30 megawatts of electricity
  • 20 MW, ForkLog: The contract includes 20 MW of power
  • 20 MW, Data Center Dynamics: Customer will deploy 20MW operational in Q4 of 2026 at Dowagiac facility.

Common questions about Hyperscale Data Dowagiac AI Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Hyperscale Data Dowagiac AI Data Center?

Hyperscale Data is the developer. No construction contractor is named on the record yet.

Who will use Hyperscale Data Dowagiac AI Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Hyperscale Data Dowagiac AI Data Center say it needs?

Power: 52 MW (the developer's figure, wwmt.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Hyperscale Data Dowagiac AI Data Center stand today?
What is still unknown about Hyperscale Data Dowagiac AI Data Center?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Data center development: What does it bring to West Michigan? - WWMT (opens in a new tab), WWMT, November 10, 2025, local outlet
  2. Hyperscale Data ends cryptomining operations at Michigan data center (opens in a new tab), Data Center Dynamics, September 3, 2026, trade press
  3. Hyperscale Data ends cryptomining operations at Michigan data center - Data Center Dynamics (opens in a new tab), Data Center Dynamics, September 3, 2026, trade press
  4. What's Going On With Hyperscale Data Stock Monday? - Hyperscale Data (AMEX:GPUS) - Benzinga (opens in a new tab), Benzinga, September 14, 2026, national outlet
  5. Hyperscale Data Establishes $750 Million Minimum Sale Threshold for Michigan AI Data Center; Management Believes Value Could Reach or Exceed $1.25 Billion - PR Newswire (opens in a new tab), PR Newswire, September 14, 2026, press release
  6. GPUS Looks 272.8% Overvalued on GF Value™ Amid Michigan AI Data Center Sale Plans - GuruFocus (opens in a new tab), GuruFocus, September 14, 2026, national outlet
  7. Hyperscale Data values its Michigan AI data cen... - Pluang (opens in a new tab), Pluang, September 14, 2026, international outlet
  8. Hyperscale Data sets $750 million minimum for Michigan data center - Investing.com (opens in a new tab), Investing.com, September 14, 2026, national outlet
  9. Hyperscale Data Provides Update on Progress of Michigan AI Data Center; More Than $70 Million Invested in Alliance Cloud Services and the Michigan Facility - PR Newswire (opens in a new tab), PR Newswire, September 17, 2026, press release
  10. Hyperscale Data Invests $70M In Michigan, Dilution Risks Remain - Hyperscale Data (AMEX:GPUS) - Benzinga (opens in a new tab), Benzinga, September 17, 2026, national outlet
  11. See the Michigan data center video causing buzz on the internet - The Detroit News (opens in a new tab), The Detroit News, September 23, 2026, local outlet
  12. Kansans are clashing over hyperscale data centers. Where are they planned? - cjonline.com (opens in a new tab), cjonline.com, August 10, 2026, local outlet
4 more sources
  1. Hyperscale Data Has Ceased Bitcoin Mining Operations in Michigan as It Fulfills the Requirements of the AI Data Center Master Services Agreement Expected to be Worth Approximately $1.2 Billion - PR Newswire (opens in a new tab), PR Newswire, September 2, 2026, press release
  2. Hyperscale Data invests $70M in Michigan AI data center By Investing.com - Investing.com (opens in a new tab), Investing.com, September 17, 2026, national outlet
  3. Southwest Michigan town gets reprieve from data center noise , for now - The Detroit News (opens in a new tab), The Detroit News, September 21, 2026, local outlet
  4. Hyperscale Data Converts Michigan Mining Farm into AI Data Center - ForkLog (opens in a new tab), ForkLog, September 3, 2026, news outlet

16 sources on file.

Regional grid context

This site is in the RFC Michigan (RFCM) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Hyperscale Data Dowagiac AI Data Center", https://datacenterrecord.org/projects/hyperscale-data-dowagiac-ai-data-center-mi, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Hyperscale Data Dowagiac AI Data Center", https://datacenterrecord.org/projects/hyperscale-data-dowagiac-ai-data-center-mi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
41.91167, -86.01
How the location is known
Location from the site's street address.
Location source
https://hyperscaledata.com/
Coordinate source
Hyperscale Data Dowagiac facility specification
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
52 MW, the developer's figure
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Hyperscale Data Dowagiac AI Data Center · 16 sources, 32 entries · basis and source tier on every row · verified November 6, 2026

Download CSV JSON