Hyperscale Data Dowagiac AI Data Center

Hyperscale Data ceased Bitcoin mining at its 617,000 square foot Dowagiac, Michigan facility on September 1, 2026, and is converting it for a California neocloud customer deploying 20MW in Q4 2026 with potential to scale to 52MW under a 10 year lease. It is being built, as reported August 10, 2026.

How much water it would use and who would use it have not been disclosed.

Last verified · 15 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
52 MW
not disclosed
Water
Not disclosed
Who leads it
Hyperscale Data
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 52 MW not disclosed September 23, 2026
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Hyperscale Data as stated by the source September 23, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

How much power it needs, also reported: 30 MW, 2026 (The Detroit News: Hyperscale Data facility capacity is 30 megawatts of electricity, Data Center Dynamics: Facility currently operates with 30MW of capacity and company aims to expand to 340MW including 40MW of behind the meter natural gas capacity.); 20 MW, 2026 (ForkLog: The contract includes 20 MW of power, Data Center Dynamics: Customer will deploy 20MW operational in Q4 of 2026 at Dowagiac facility.); 52 MW, 2026 (Data Center Dynamics: Customer could scale up to 52MW of compute capacity at Dowagiac facility.) .

Jobs once it runs, also reported: 1,700 to 2,300 jobs, 2026 (Boothbay Register: Project would bring millions of dollars in taxes, 1,700 to 2,300 temporary construction jobs, and 100 to 200 permanent jobs) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Cass County and Dowagiac about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Dowagiac Dowagiac amended its noise pollution ordinance in response to data center noise from Hyperscale Data facility. detroitnews.com
Dowagiac Dowagiac city imposed tougher noise ordinance setting new daytime and nighttime decibel limits for industrial facilities detroitnews.com

What happened

  1. (source date; the content gives no date of its own)

    Hyperscale Data facility will resume operations in November 2026 supporting artificial intelligence computing. [13]

  2. (source date; the content gives no date of its own)

    Hyperscale Data Inc. data center in Dowagiac operated as bitcoin mining facility with fan based cooling until early September 2026, causing noise concerns. [13]

  3. (source date; the content gives no date of its own)

    Company plans to resume operations in Dowagiac in November with new equipment for AI computing [12]

  4. (source date; the content gives no date of its own)

    Hyperscale Data Inc. ceased bitcoin mining operation on September 2 to retool facility for artificial intelligence computing [12]

  5. (source date; the content gives no date of its own)

    Customer has right to increase critical AI compute capacity up to 52 MW [10]

  6. (source date; the content gives no date of its own)

    Initial Master Services Agreement provides for 20 megawatts of critical AI compute capacity with 10 year initial term plus two 5 year extension options [10]

  7. (source date; the content gives no date of its own)

    Operations under Master Services Agreement expected to begin in November 2026 [10]

  8. (source date; the content gives no date of its own)

    The company is working toward commencing operations under a previously announced master services agreement in November 2026 [9]

29 earlier entries
  1. (source date; the content gives no date of its own)

    The master services agreement provides for an initial 20 megawatts of critical AI compute capacity and has an initial 10 year term with two five year extension options [9]

  2. (source date; the content gives no date of its own)

    Hyperscale Data has invested more than $70 million into its Michigan AI data center facility as of September 15, 2026 [9]

  3. (source date; the content gives no date of its own)

    Michigan facility targeting November 2026 start for 20 MW contract with Alliance Cloud Services [11]

  4. (source date; the content gives no date of its own)

    Alliance Cloud Services executed master services agreement with California based customer for initial 20 MW deployment at Michigan Campus [5]

  5. (source date; the content gives no date of its own)

    Customer has rights to additional 32 MW of capacity at Michigan campus. [8]

  6. (source date; the content gives no date of its own)

    Master services agreement initial 10 year term with two five year extension options. [8]

  7. (source date; the content gives no date of its own)

    Alliance Cloud Services master services agreement with neocloud provider for deployment of 20 megawatts of AI compute capacity at Michigan campus. [8]

  8. (source date; the content gives no date of its own)

    Management exploring options including selling campus, IPO of Sentinum subsidiary or continued development [7]

  9. (source date; the content gives no date of its own)

    New 20 megawatt contract with California cloud provider [7]

  10. (source date; the content gives no date of its own)

    Company is evaluating options including sale, continued development or IPO of Sentinum subsidiary [4]

  11. (source date; the content gives no date of its own)

    Campus could eventually support more than 300 megawatts [4]

  12. (source date; the content gives no date of its own)

    20 megawatt master services agreement with California cloud provider has 10 year term and two five year extension options [4]

  13. (source date; the content gives no date of its own)

    Hyperscale Data explores sale or IPO of Michigan AI data center campus targeting valuation between 750 million and 1.25 billion dollars [4]

  14. (source date; the content gives no date of its own)

    Hyperscale Data is evaluating options including outright sale, continued development or initial public offering of Sentinum subsidiary [6]

  15. (source date; the content gives no date of its own)

    Michigan campus could eventually support more than 300 megawatts, depending on financing, regulatory approvals, utility agreements and customer demand [6]

  16. (source date; the content gives no date of its own)

    Alliance Cloud Services signed a master services agreement covering initial 20 megawatts of AI computing capacity with 10 year term and two five year extension options [6]

  17. (source date; the content gives no date of its own)

    Hyperscale Data is converting the Michigan site into an AI data center [15]

  18. (source date; the content gives no date of its own)

    Hyperscale Data ceased bitcoin mining in Michigan [15]

  19. (source date; the content gives no date of its own)

    Unnamed California based neocloud customer signed lease agreement with Hyperscale Data in June 2026. [1]

  20. (source date; the content gives no date of its own)

    Hyperscale Data ceased all Bitcoin mining operations on September 1, 2026, at its Dowagiac, Michigan facility. [1]

  21. (source date; the content gives no date of its own)

    The master services agreement with a California neocloud provider is for deployment of 20 megawatts with an initial term of 10 years and two five year extension options [3]

  22. (source date; the content gives no date of its own)

    Hyperscale Data ceased all Bitcoin mining operations at its Michigan data center effective September 1, 2026 [3]

  23. (source date; the content gives no date of its own)

    Google looking to potentially build data center development in Barber County near Sharon [14]

  24. (source date; the content gives no date of its own)

    Kanza Park Place LLC proposed Flint Hills Digital Campus covering 11 tracts of land in west Emporia [14]

  25. (source date; the content gives no date of its own)

    Beale Infrastructure pulled the plug on 300 acre data center project in eastern Gardner after community scrutiny [14]

  26. (source date; the content gives no date of its own)

    Project Bluestem proposed data center development from Cloverleaf Infrastructure in Leavenworth County near Tonganoxie Business Park [14]

  27. (source date; the content gives no date of its own)

    Digital Realty proposed a multiphase data center campus at Astra Enterprise Park in De Soto [14]

  28. (source date; the content gives no date of its own)

    De Soto City Council approved Development Agreement with Mount Sunflower, LLC in August 2025 [14]

  29. · being built (source date; the content gives no date of its own)

    Beale Data Center is Kansas's first hyperscale data center campus being built in De Soto [14]

The full Hyperscale Data Dowagiac AI Data Center timeline, in order

17 corrections to this record

Every correction, with its reason
  1. · the summary of a record items row

    the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article The old and new text.

  2. · the speaker role of a statements row

    Speaker read again from the statement's source line, "President Donald Trump": the title in front of the name (President) is the role, not part of the name. The old and new text.

  3. · the speaker of a statements row

    Speaker read again from the statement's source line, "President Donald Trump": the title in front of the name (President) is the role, not part of the name. The old and new text.

  4. · the speaker of a statements row

    Speaker read again from the statement's source line, "Rep. Steve Carra, Michigan House of Representatives": the title in front of the name (Representative) is the role, not part of the name. The old and new text.

  5. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  6. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  7. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  8. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives datacenterdynamics.com. The link did not change. The day's label corrections.

  9. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives cjonline.com. The link did not change. The day's label corrections.

  10. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives cjonline.com. The link did not change. The day's label corrections.

  11. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives cjonline.com. The link did not change. The day's label corrections.

  12. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives cjonline.com. The link did not change. The day's label corrections.

  13. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives cjonline.com. The link did not change. The day's label corrections.

  14. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives cjonline.com. The link did not change. The day's label corrections.

  15. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives cjonline.com. The link did not change. The day's label corrections.

  16. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives datacenterdynamics.com. The link did not change. The day's label corrections.

  17. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is datacenterdynamics.com, the publisher's own page. The item reached the record through Google News: "data center" Michigan, which the record carries at tier 1, and the approve copied the feed's tier onto this row, from the wrapper https://news.google.com/rss/articles/CBMisgFBVV95cUxNdXF0ZE9hX2xSWFBiU2psUFlWXzRrbG1wNkFoVjl0Mlh4LXZQLUoyRjJoTXMxbmFCZVJCNFEtNzUzZTlmNlBHSDFOOXVHZzVwVHhSa212TnZ0UTROLV8tZjFqMlZmR09aeGFGMkNDeU5tWEt4YVE3T3BjNV80c1JCTlptVHlrN1BsRHFHZXlkN3hJQ29HMG9YbFU5S1FBZTZHNS1DNGlndEx0c0ZmSFNRd0xn. The tier now comes from the outlet, which the record already carries at tier 3 on 1 row of monitoring_sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

William Horne, Hyperscale Data CEO, said the facility is being prepared for AI usage and customer deployment.
William Horne, Hyperscale Data CEO · September 3, 2026 · paraphrased · Data Center Dynamics trade press
Rep. Steve Carra stated that hyperscale data centers are an existential threat and may cause the extermination of humanity if not carefully managed
Steve Carra, Michigan House of Representatives · August 31, 2026 · paraphrased · Michigan House Republicans local outlet

Every statement about data centers in Michigan, by speaker

4 more statements on this page

Hyperscale Data Inc

Management does not plan to recommend sale below 750 million dollars

September 14, 2026, GuruFocus · GuruFocus local outlet · the record (Paraphrased; said in the source itself)

Hyperscale Data will continue cryptocurrency mining at its Montana site

September 3, 2026, ForkLog · ForkLog local outlet · the record (Paraphrased; said in the source itself)

Hyperscale Data Chief Executive Officer

CEO William Horne said the transition to AI data center operations will allow focus on the facility's preparation for customer usage

September 2, 2026, PR Newswire · PR Newswire local outlet · the record (Paraphrased; said in the source itself)

President Donald Trump argued that communities should embrace data centers and warned that widespread opposition could put the United States at a competitive disadvantage with China

August 31, 2026, Michigan House Republicans · Michigan House Republicans local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Cass County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Being built, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 10 other published records in Michigan
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Dowagiac, Cass County, Michigan
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

3 figures, 3 sources
Show each source's words
  • 52 MW, Data Center Dynamics: Customer could scale up to 52MW of compute capacity at Dowagiac facility.
  • 30 MW, Data Center Dynamics: Facility currently operates with 30MW of capacity and company aims to expand to 340MW including 40MW of behind the meter natural gas capacity.
  • 30 MW, The Detroit News: Hyperscale Data facility capacity is 30 megawatts of electricity
  • 20 MW, ForkLog: The contract includes 20 MW of power
  • 20 MW, Data Center Dynamics: Customer will deploy 20MW operational in Q4 of 2026 at Dowagiac facility.

Permanent jobs

1 figure, 1 source
1,700 to 2,300 jobsGovernment

Boothbay Register, Aug 20, 2026

Show each source's words
  • 1,700 to 2,300 jobs, Boothbay Register: Project would bring millions of dollars in taxes, 1,700 to 2,300 temporary construction jobs, and 100 to 200 permanent jobs

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Hyperscale Data Dowagiac AI Data Center?

The record has one measure of its size: 52 MW (not disclosed). Its acreage is not disclosed.

Who is building Hyperscale Data Dowagiac AI Data Center?

Hyperscale Data is the developer. No construction contractor is named on the record yet.

Who will use Hyperscale Data Dowagiac AI Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Hyperscale Data Dowagiac AI Data Center say it needs?

Power: 52 MW (not disclosed). Water: not disclosed by any source on file.

Where does Hyperscale Data Dowagiac AI Data Center stand today?

It is being built, as reported August 10, 2026. The newest entry, reported September 23, 2026: Hyperscale Data facility will resume operations in November 2026 supporting artificial intelligence computing. [13]

What has Dowagiac or Cass County decided about it?

Dowagiac: Dowagiac amended its noise pollution ordinance in response to data center noise from Hyperscale Data facility. (reported September 23, 2026, source); and Dowagiac: Dowagiac city imposed tougher noise ordinance setting new daytime and nighttime decibel limits for industrial facilities (reported September 21, 2026, source). 2 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Hyperscale Data Dowagiac AI Data Center?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Hyperscale Data ends cryptomining operations at Michigan data center, Data Center Dynamics, September 3, 2026, trade press
  2. Hyperscale Data ends cryptomining operations at Michigan data center - Data Center Dynamics, Data Center Dynamics, September 3, 2026, trade press
  3. Hyperscale Data Has Ceased Bitcoin Mining Operations in Michigan as It Fulfills the Requirements of the AI Data Center Master Services Agreement Expected to be Worth Approximately $1.2 Billion - PR Newswire, PR Newswire, September 2, 2026, local outlet
  4. What's Going On With Hyperscale Data Stock Monday? - Hyperscale Data (AMEX:GPUS) - Benzinga, Benzinga, September 14, 2026, local outlet
  5. Hyperscale Data Establishes $750 Million Minimum Sale Threshold for Michigan AI Data Center; Management Believes Value Could Reach or Exceed $1.25 Billion - PR Newswire, PR Newswire, September 14, 2026, local outlet
  6. GPUS Looks 272.8% Overvalued on GF Value™ Amid Michigan AI Data Center Sale Plans - GuruFocus, GuruFocus, September 14, 2026, local outlet
  7. Hyperscale Data values its Michigan AI data cen... - Pluang, Pluang, September 14, 2026, local outlet
  8. Hyperscale Data sets $750 million minimum for Michigan data center - Investing.com, Investing.com, September 14, 2026, local outlet
  9. Hyperscale Data invests $70M in Michigan AI data center By Investing.com - Investing.com, Investing.com, September 17, 2026, local outlet
  10. Hyperscale Data Provides Update on Progress of Michigan AI Data Center; More Than $70 Million Invested in Alliance Cloud Services and the Michigan Facility - PR Newswire, PR Newswire, September 17, 2026, local outlet
  11. Hyperscale Data Invests $70M In Michigan, Dilution Risks Remain - Hyperscale Data (AMEX:GPUS) - Benzinga, Benzinga, September 17, 2026, local outlet
  12. Southwest Michigan town gets reprieve from data center noise , for now - The Detroit News, The Detroit News, September 21, 2026, local outlet
3 more sources
  1. See the Michigan data center video causing buzz on the internet - The Detroit News, The Detroit News, September 23, 2026, local outlet
  2. Kansans are clashing over hyperscale data centers. Where are they planned? - cjonline.com, cjonline.com, August 10, 2026, local outlet
  3. Hyperscale Data Converts Michigan Mining Farm into AI Data Center - ForkLog, ForkLog, September 3, 2026, local outlet

15 sources on file.

Cite this record

Data Center Record, "Hyperscale Data Dowagiac AI Data Center", https://datacenterrecord.org/projects/hyperscale-data-dowagiac-ai-data-center-mi, last verified September 23, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Hyperscale Data Dowagiac AI Data Center", https://datacenterrecord.org/projects/hyperscale-data-dowagiac-ai-data-center-mi. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
hyperscale-data-dowagiac-ai-data-center-mi
Status value
under_construction
Stage
Being built
Tier
skeleton
Tags
skeleton
Place id
us/mi/cass-county/dowagiac
Coordinates
41.91167, -86.01
Location precision
county
Location source
County seat (Cassopolis), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
52 MW, not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-09-23