Data Center Record.
Census GEOID: 26077 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and local sources

● Running Announced October 27, 2026 · 1 Building · Aunalytics

Aunalytics Kalamazoo Data Center

Street address 6395 Technology Avenue, Kalamazoo, MI 49009, Kalamazoo County verified address Exact, at the address [2] echo.epa.gov

Overview, regulatory gates and specifications

Aunalytics operates a commercial cloud and colocation data center at 6395 Technology Avenue in Kalamazoo, Kalamazoo County, Michigan. [1] Filings on the record specify disclosed capacity of 4 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Michigan Department of Envir
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
4 MW
the developer's figure

Equivalent to ~3,320 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 6395 Technology Avenue, Kalamazoo, MI 49009.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
4 MW developer figure Equivalent to the continuous electricity demand of about 3,320 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.039 percent) of New York City's summer peak demand in 2024.
[1] aunalytics.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] aunalytics.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
Aunalytics as stated by the source
[1] aunalytics.com
State permit status
Michigan Department of Environment, Great Lakes, and Energy Stationary Emergency Generator and Commercial Facility Record (6395 Technology Avenue, Kalamazoo, MI 49009) the state's permit register, as of November 6, 2026
[2] echo.epa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Aunalytics Kalamazoo Data Center, capacity: 4 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 4 ÷ 10,245 = 0.00039 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Aunalytics
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Aunalytics Kalamazoo Data Center.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 4 MW 4 MW the developer's figure [1] aunalytics.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] aunalytics.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Kalamazoo County and Kalamazoo about data centers, on the record with their source. A rule about the area is not a decision about this record.

October 30, 2025 Kalamazoo, MI Pavilion Township Board Kalamazoo County Data Center Project Halt Pavilion Township Board of Trustees 3 clips

On October 30, 2025, developers paused their proposed hyperscale data center in Pavilion Township, Kalamazoo County after intense resident opposition at township board hearings over agricultural zoning, groundwater wells, and noise.

  1. Pavilion Township Officials and Project Co Founder (WWMT TV Report) Broadcast Report transcribed from local broadcast report
    "Why they're putting the brakes on this project for now. Yeah. That's right. I spoke on the phone with don shoemaker with franklin partners LLC. He tells me he was surprised how many community members didn't want them to move forward with this project, and that they are listening to those concerns. This plot of land on south 26th street and east north avenue is where the real estate company"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Targeted it as a great spot to build a new data center, but it hasn't gone as planned. People felt very surprised and blindsided and that it was going very, very quickly. Katelyn clary lives nearby and says there's been a major pushback from the community, beginning with concerns over electricity usage in other communities. There has been"
  3. WWMT TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "Supervisor john spear says the data centers high monthly payments shouldn't spill over into the surrounding community. That aside, clary says residents are worried about the thousands of gallons of water needed for cooling at the site and its environmental impact in other communities. We've seen generators get used a lot more for these plants, and it would affect the air quality in local communities. A lot of times"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.

    [2] echo.epa.gov

Nearest data centers in Michigan

Verified data center records in Michigan within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Hyperscale Data Dowagiac AI Data Center Dowagiac, Cass County 29 mi Being built Hyperscale Data 52 MW
Microsoft Dorr Township Data Center Dorr Township, Allegan County 33 mi Proposed Microsoft 4 buildings
ManagedWay and 123NET Byron Center Data Center (BYK1 / DC4) Byron Center, Kent County 40 mi Running ManagedWay 6 MW
Microsoft Gaines Township Data Center Gaines Township, Kent County 42 mi Proposed Microsoft 3 buildings
Switch Grand Rapids campus Grand Rapids, Kent County 49 mi Running Switch 100 MW
Rural Michigan Farm Data Center Ionia, Ionia County 59 mi Proposed 1 building

Blank cell: not disclosed by any source on file.

Common questions about Aunalytics Kalamazoo Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Aunalytics Kalamazoo Data Center?

Aunalytics is the developer, aunalytics.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Aunalytics Kalamazoo Data Center say it needs?

Power: 4 MW (the developer's figure, aunalytics.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Aunalytics Kalamazoo Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Kalamazoo or Kalamazoo County decided about it?

No decision by Kalamazoo or Kalamazoo County about data centers is on the record. The Kalamazoo County page and the Michigan scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Aunalytics Facility Specifications (6395 Technology Avenue, Kalamazoo, MI 49009) (opens in a new tab), Aunalytics, November 6, 2026
  2. US EPA ECHO and Michigan Department of Environment, Great Lakes, and Energy Stationary Generator & Parcel Record (6395 Technology Avenue, Kalamazoo, MI 49009) (opens in a new tab), U.S. Environmental Protection Agency and Michigan Department of Environment, Great Lakes, and Energy, November 6, 2026

2 sources on file.

Regional grid context

This site is in the RFC Michigan (RFCM) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Aunalytics Kalamazoo Data Center", https://datacenterrecord.org/projects/aunalytics-kalamazoo-datacenter-mi, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Aunalytics Kalamazoo Data Center", https://datacenterrecord.org/projects/aunalytics-kalamazoo-datacenter-mi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
42.246545, -85.675111
How the location is known
Location from the site's street address.
Location source
https://aunalytics.com/
Coordinate source
Aunalytics Kalamazoo specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
4 MW, the developer's figure
Published
October 21, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Aunalytics Kalamazoo Data Center · 2 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified November 6, 2026

Download CSV JSON