Rural Michigan Farm Data Center

A farm in rural Michigan near Ionia is seeking to annex into a city in order to host a data center, and Ionia is planning a proactive public meeting on data centers. It is reported; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

No dated entry is on the record yet.

2 corrections to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

Jean Hardy, Michigan State University Associate Professor with the Department of Media and Information, said a data center proposal to Ionia, if it came, would be many years out and is unlikely
Jean Hardy, Michigan State University Associate Professor · September 10, 2026 · paraphrased · fox17online.com local outlet
Consumers Energy representatives stated that data centers would not automatically increase electricity rates for nearby residents, as utility rates are subject to state regulatory approval
Consumers Energy representatives · September 10, 2026 · paraphrased · fox17online.com local outlet

Every statement about data centers in Michigan, by speaker

1 more statement on this page

Michigan State University Associate Professor

Jean Hardy noted that Ionia has existing water capacity, including infrastructure from the former correctional facility, which could potentially be repurposed for a data center if one came to the area

September 10, 2026, fox17online.com · fox17online.com local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Ionia County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 10 other published records in Michigan
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Ionia, Ionia County, Michigan
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Rural Michigan Farm Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Rural Michigan Farm Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Rural Michigan Farm Data Center stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Ionia or Ionia County decided about it?

No decision by Ionia or Ionia County about data centers is on the record. The Ionia County page and the Michigan scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. A farm wants a data center in rural Michigan — and it has to join a city to do it - Crain's Detroit, Crain's Detroit, September 4, 2026, local outlet
  2. Ionia to host ‘proactive’ meeting on data centers - woodtv.com, woodtv.com, September 2, 2026, local outlet
  3. Ionia has no data center proposal, but leaders are starting the conversation - fox17online.com, fox17online.com, September 10, 2026, local outlet

3 sources on file.

Cite this record

Data Center Record, "Rural Michigan Farm Data Center", https://datacenterrecord.org/projects/rural-michigan-farm-data-center-ionia-mi, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Rural Michigan Farm Data Center", https://datacenterrecord.org/projects/rural-michigan-farm-data-center-ionia-mi. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
rural-michigan-farm-data-center-ionia-mi
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/mi/ionia-county/ionia
Coordinates
42.98194, -85.06667
Location precision
county
Location source
County seat (Ionia), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-09-17