ManagedWay and 123NET operate the BYK1 and DC4 commercial colocation data center at 400 76th Street SW in Byron Center, Kent County, Michigan. [1] Filings on the record specify disclosed capacity of 6 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications. [1]
Equivalent to ~4,980 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.3% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 400 76th Street SW, Byron Center, MI 49315.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for ManagedWay and 123NET Byron Center Data Center (BYK1 / DC4).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 6 MW | 6 MW | the developer's figure [1] managedway.com |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] managedway.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Kent County and Byron Center about data centers, on the record with their source. A rule about the area is not a decision about this record.
WWMT TV report on Lowell City Council and community proceedings in Lowell, MI: Michigan residents pushback against Microsoft data center (June 9, 2026).
"People. A Lowell township planning commission meeting drawing a massive crowd with residents angry about a proposed data center in their community operations. Microsoft presented their plan, showing renderings of the proposed site off I-96 and cascade road southeast. The opposition was clear as we drove around town,"
"And you hear a lot about all the water that gets used and then how it affects wells and that kind of stuff. And I just don't want that to happen. The large scale developments, house computer servers used for things like photos, videos, and artificial intelligence using large quantities of water and electricity. I'm hearing stories on communities having"
"Features, replenish more water than they use, and will not increase electricity costs for residents. The company operates more than 500 data centers in over 34 countries, and has now submitted this rezoning approval request for the Lowell site, which is being reviewed by the planning commission. I don't want to see, you know, our earth destroyed by"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.
Verified data center records in Michigan within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Microsoft Gaines Township Data Center Gaines Township, Kent County | 6 mi | Proposed | Microsoft | 3 buildings |
| Microsoft Dorr Township Data Center Dorr Township, Allegan County | 7 mi | Proposed | Microsoft | 4 buildings |
| Switch Grand Rapids campus Grand Rapids, Kent County | 9 mi | Running | Switch | 100 MW |
| Rural Michigan Farm Data Center Ionia, Ionia County | 33 mi | Proposed | 1 building | |
| Aunalytics Kalamazoo Data Center Kalamazoo, Kalamazoo County | 40 mi | Running | Aunalytics | 4 MW |
| Liquid Web Lansing Data Center (DC3) Lansing, Eaton County | 52 mi | Running | Liquid Web / Metronet | 10 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
ManagedWay is the developer. No construction contractor is named on the record yet.
Power: 6 MW (the developer's figure, managedway.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
No decision by Byron Center or Kent County about data centers is on the record. The Kent County page and the Michigan scorecard list every rated row the day a person publishes one.
1 source on file.
This site is in the RFC Michigan (RFCM) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. ManagedWay and 123NET Byron Center Data Center (BYK1 / DC4). Last verified October 27, 2026. https://datacenterrecord.org/projects/managedway-byk1-byron-center-mi. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about ManagedWay and 123NET Byron Center Data Center (BYK1 / DC4)
Data Center Record, "ManagedWay and 123NET Byron Center Data Center (BYK1 / DC4)", https://datacenterrecord.org/projects/managedway-byk1-byron-center-mi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.