Data Center Record.
Census GEOID: 01073 Location Precision: county centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 4 reporting sources

● Proposed Campus First recorded September 5, 2026

Patmos Fairfield Data Center

Location Fairfield, Jefferson County, Alabama county centroid County level, the county seat

Overview, regulatory gates and specifications

Patmos announced plans for a $150 million data center in Fairfield, Alabama, inside a former Walmart, with residents raising questions and hundreds attending a town hall. [1]

1. Land & Parcel
Location tracked
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings
Not disclosed
Acreage not stated in public filings yet

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Parcel boundaries and municipal zoning tracked.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Patmos as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

John Johnson

Patmos founder

DID Recorded statement at WBRC (September 11, 2026) [1]
SAID Patmos founder John Johnson told neighbors at a community meeting that generators will have mufflers and the loudest equipment will stay inside, with the site quieter than the old Walmart. (September 11, 2026) [1]

Herman Carnes Jr.

Fairfield Mayor

DID Recorded statement at WBRC (September 11, 2026) [1]
SAID Fairfield Mayor Herman Carnes Jr. visited a Patmos data center campus in Kansas City and described it as a multi story tech campus with a data center on at least one floor, stating it was quieter than many imagine. (September 11, 2026) [1]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Patmos
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Patmos Fairfield Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

March 3, 2026 Birmingham, AL Birmingham City Council Six Month Hyperscale Data Center Moratorium Vote Birmingham City Council 3 clips

On March 3, 2026, the Birmingham City Council voted to enact a 6 month moratorium on hyperscale data centers across the city to study water supply, Alabama Power grid demand, and neighborhood land use impacts.

  1. WVTM 13 News Broadcast Report Broadcast Report transcribed from local broadcast report
    "According to the data center map, there are 19 data centers already built or under construction in our state. There are eight in central alabama. In Birmingham, there are plans for an artificial intelligence center in d.c. Blocks is looking to expand its existing data center in titusville. However, any additional proposals within Birmingham city limits are currently on hold. Wvtm 13 lisa crane joins us live and local in Birmingham, and lisa Birmingham City Council members held a public hearing on data centers today."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "What came out of that meeting? Well, the council voted on a six month moratorium on data centers. Behind me, you can see the future home of the AI factory. But for now, no more hyperscale data centers or AI factories will be allowed to start the permitting process until city leaders can actually get a handle and define exactly what these buildings are and how these new facilities actually fit into the current zoning regulations. This is an area that we really need to get a handle on before we do anything else."
  3. WVTM 13 News Broadcast Report Broadcast Report transcribed from local broadcast report
    "Almost two dozen residents voiced their concerns about data centers to Birmingham City Council members at a public hearing. Most people are just trying to understand what they are and why they need massive amounts of electricity, water and other resources. The industry so novel it doesn’t really fit into current ordinances or zoning regulations. It is something new that our ordinance doesn’t currently consider. So it’s something that we want to plan for in a way that responsibly allows for this type of growth in the city, while taking into account, you know, the best interest of our"
November 18, 2025 Bessemer, AL Bessemer City Council Project Marvel 14 Billion Dollar Data Center Rezoning Vote Bessemer City Council 1 clip

Despite fierce resident opposition over clearcutting 700 acres of forest and nondisclosure agreements, the Bessemer City Council voted 5 to 2 on November 18, 2025 to approve rezoning for Project Marvel, a proposed 14.5 billion dollar hyperscale data center campus.

  1. WVTM 13 News Broadcast Report Broadcast Report transcribed from local broadcast report
    "The 5 to 2 vote came after a number of people shared their concerns about this project. So the plan to build over a 14 billion multi building data center is beginning to move forward. One woman against the plan doesn’t live in Bessemer but is worried about the impacts that will stretch beyond the city. So this is really got me very very upset. I do not like it and I feel sorry that for the people that live here in Bessemer. But most importantly, it’s not just about the people that live here in Bessemer."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

3 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Alabama

Verified data center records in Alabama within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
QTS Bessemer Bessemer, Jefferson County ~17 mi Being built QTS Data Centers 2 buildings
Westover Proposed Data Center Westover, Shelby County ~26 mi Proposed
Brookwood Proposed Data Center Brookwood, Tuscaloosa County ~47 mi Proposed Kayvens LLC
Data Center near Tuscaloosa Tuscaloosa, Tuscaloosa County ~47 mi Proposed

Blank cell: not disclosed by any source on file.

Common questions about Patmos Fairfield Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Patmos Fairfield Data Center?

Patmos is the developer. No construction contractor is named on the record yet.

How much power and water does Patmos Fairfield Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Patmos Fairfield Data Center stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Fairfield mayor visits Patmos campus in Kansas City as company eyes city for possible data center development - WBRC (opens in a new tab), WBRC, September 11, 2026, local outlet
  2. Patmos executives detail plans for $150 million Fairfield data center - AL.com (opens in a new tab), AL.com, August 13, 2026, local outlet
  3. New data center plans to move quickly in Fairfield. Residents have questions - wbhm.org (opens in a new tab), wbhm.org, August 14, 2026, local outlet
  4. Hundreds pack Fairfield town hall over proposed data center inside former Walmart - WBRC 6 News (opens in a new tab), WBRC 6 News, August 12, 2026, local outlet

4 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Patmos Fairfield Data Center", https://datacenterrecord.org/projects/patmos-fairfield-data-center-al, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Patmos Fairfield Data Center", https://datacenterrecord.org/projects/patmos-fairfield-data-center-al. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.5175, -86.80944
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Birmingham), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Patmos Fairfield Data Center · 4 sources, 0 entries · basis and source tier on every row · verified September 17, 2026

Download CSV JSON