Data Center Record.
Census GEOID: 01125 Location Precision: county centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 11 reporting sources

● Proposed Campus Reported August 25, 2026

Brookwood Proposed Data Center

Location Brookwood, Tuscaloosa County, Alabama county centroid County level, the county seat

Overview, regulatory gates and specifications

Brookwood residents voiced concerns over a potential data center project in their area, and a town hall on the topic was held. [5] Brookwood has a possible data center project near Brookwood Middle School [9]

Verified Site & Permit Summary
Verified address
Brookwood, Tuscaloosa County, Alabama county centroid
Operator / developer
Kayvens LLC
Permit / registry ID
The Tuscaloosa News on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Kayvens LLC as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Doug Jones

Democratic gubernatorial candidate · Alabama

DID Recorded statement at WVUA 23 (September 10, 2026)
SAID Doug Jones accused Tuberville of ethical malpractice for accepting campaign funds from large tech companies currently building data centers in west Alabama. (September 10, 2026) wvua23.com (opens in a new tab)

Applied Digital Corporation

Public Record Speaker

DID Recorded statement at WVUA 23 (September 10, 2026)
SAID Applied Digital Corporation donated $25,000 to Tommy Tuberville's gubernatorial campaign in August 2026. (September 10, 2026) wvua23.com (opens in a new tab)

Joe Barger

Mayor, Brookwood

DID Recorded statement at WBRC (September 8, 2026)
SAID No signed project agreement yet according to Brookwood officials (September 8, 2026) wbrc.com (opens in a new tab)

Adam Kramer

Global Head of Data Centers, Panattoni Development Company

DID Recorded statement at WBMA (September 8, 2026) [9]
SAID Adam Kramer, Global Head of Data Centers at Panattoni Development Company, stated developers identify power access before purchasing land (September 8, 2026) [9]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Kayvens LLC · Parent: Meta
UTILITIES
Electric utility: Not disclosed

View all 15 statements on the record in Alabama →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Brookwood Proposed Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Brookwood has a possible data center project near Brookwood Middle School

    [9] abc3340.com

  2. (source date; the content gives no date of its own)

    Applied Digital owns 1,300 acres in Brookwood

    [6] tuscaloosathread.com

  3. · Status: rumored (source date; the content gives no date of its own)

    Brookwood data center proposal is 2 million square foot facility on Brookwood Parkway near Brookwood Middle School

    [5] tuscaloosanews.com

Every event in order

3 corrections to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Alabama

Verified data center records in Alabama within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Data Center near Tuscaloosa Tuscaloosa, Tuscaloosa County Less than 1 mi Proposed
QTS Bessemer Bessemer, Jefferson County ~31 mi Being built QTS Data Centers 2 buildings
Patmos Fairfield Data Center Fairfield, Jefferson County ~47 mi Proposed Patmos
Westover Proposed Data Center Westover, Shelby County ~54 mi Proposed

Blank cell: not disclosed by any source on file.

Common questions about Brookwood Proposed Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Brookwood Proposed Data Center?

Kayvens LLC is the developer. No construction contractor is named on the record yet.

How much power and water does Brookwood Proposed Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Brookwood Proposed Data Center stand today?

It is reported, as reported August 25, 2026. The newest entry, reported September 8, 2026: Brookwood has a possible data center project near Brookwood Middle School [9].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. TCEDA: $3.2B Brookwood Data Center To Generate $131.5M For Area Schools - Patch (opens in a new tab), Patch, September 24, 2026, local outlet
  2. Applied Digital confirms $3.2 billion data center campus in Brookwood - WBRC (opens in a new tab), WBRC, September 24, 2026, local outlet
  3. Tuscaloosa County lands $3.2 billion data center , first in Alabama to pay 'community benefits,' $270 million over 20 years - Yellowhammer News (opens in a new tab), Yellowhammer News, September 24, 2026, local outlet
  4. Applied Digital holds town hall on AI data center campus in Brookwood - WBRC 6 News (opens in a new tab), WBRC 6 News, October 2, 2026, local outlet
  5. Tuscaloosa group plans public forum on data centers, surveillance tech - The Tuscaloosa News (opens in a new tab), The Tuscaloosa News, August 25, 2026, local outlet
  6. Tuberville Gets $25,000 from Data Center Developer With Land in Brookwood - Tuscaloosa Thread (opens in a new tab), Tuscaloosa Thread, August 28, 2026, local outlet
  7. Brookwood residents continue to voice concerns over potential data center - cbs42.com (opens in a new tab), cbs42.com, August 18, 2026, national outlet
  8. Trump Pushes Data Centers Amid National Debate, Brookwood Town Hall Tonight - tuscaloosathread.com (opens in a new tab), tuscaloosathread.com, September 1, 2026, local outlet
  9. From land purchase to power: How data center projects move forward in central Alabama - WBMA (opens in a new tab), WBMA, September 8, 2026, local outlet
  10. Tuscaloosa County approves controversial $3 billion AI hub - tuscaloosanews.com (opens in a new tab), tuscaloosanews.com, September 25, 2026, local outlet
  11. Brookwood Council Vote Clears Last Zoning Hurdle for One of Major 3 Data Center Projects - Tuscaloosa Thread (opens in a new tab), Tuscaloosa Thread, September 16, 2026, local outlet

11 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Brookwood Proposed Data Center", https://datacenterrecord.org/projects/brookwood-proposed-data-center-al, last verified October 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Brookwood Proposed Data Center", https://datacenterrecord.org/projects/brookwood-proposed-data-center-al. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.20667, -87.53472
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Tuscaloosa), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
October 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Brookwood Proposed Data Center · 11 sources, 3 entries · basis and source tier on every row · verified October 6, 2026

Download CSV JSON