Nvidia CEO and President
Nvidia CEO Jensen Huang said now is the time to scale the AI infrastructure that will power the next industrial revolution
SB Energy's PORTS Pike Technology Campus in Pike County is being built as an AI compute campus with NVIDIA guaranteeing exclusive hosting of NVIDIA AI compute, and OpenAI has joined the project, which is reported to require more power than all homes in Ohio. It is waiting on permits, as reported September 2, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | SB Energy | as stated by the source | September 17, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
How much power it needs, also reported: 10 GW, 2026 (Washington Examiner: Plans to eventually expand power capacity to 10 gigawatts, enr.com: PORTS Pike Technology Campus planned 10 gigawatt data center campus); 9.2 GW, 2026 (enr.com: PORTS Pike power generation capacity about 9.2 gigawatts from natural gas); 8 GW, 2026 (Washington Examiner: Data center is planned to provide at least 8 gigawatts or 8 billion watts of electrical power); 4.25 GW, 2026 (enr.com: Initial deployment expected to provide 4.25 gigawatts of AI factory capacity); 1.56 GW, 2026 (Washington Examiner: Largest operating U.S. data center by power capacity is SpaceXAI Colossus 2 in Tennessee at 1.563 gigawatts) .
Tax it would pay each year, also reported: 2,500,000,000 dollars, 2024 (TiffinOhio.net: Between 2017 and 2024, Ohio provided about $2.5 billion in tax incentives to attract data center development.); 6,300,000 dollars, 2024 (TiffinOhio.net: American Electric Power Service Corporation received $6.3 million in data center tax breaks from the state as of September 2024.) .
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
Acts of Pike County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Pike County | Ohio Power Siting Board public hearing scheduled for Baku Gavin Transmission Line project on October 27, 2026 at 6 p.m. at Jackson High School Auditorium. | yahoo.com |
(source date; the content gives no date of its own)
PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator [2]
(source date; the content gives no date of its own)
Construction on each building expected to take between 14 to 16 months [12]
(source date; the content gives no date of its own)
Prime hopes to begin work on the project sometime in early 2027 [12]
· Status: permitting (source date; the content gives no date of its own)
Prime Data Centers developer detailed Starpointe data center proposal on September 2, 2026 [12]
(source date; the content gives no date of its own)
PORTS Pike data center campus located on site of former Portsmouth Gaseous Diffusion Plant uranium enrichment facility near Columbus, Ohio [4]
(source date; the content gives no date of its own)
SB Energy will develop, own and operate data center campus including power generation [4]
· Status: approved (source date; the content gives no date of its own)
Bechtel and Kiewit Corp tapped to provide engineering, procurement, construction and other services for PORTS Pike [4]
(source date; the content gives no date of its own)
Project is being built at the Portsmouth Gaseous Diffusion Plant, a former uranium enrichment facility [13]
The full PORTS-Pike Technology Campus timeline, in order
· the speaker role of a statements row
Speaker read again from the statement's source line, "Energy Secretary Chris Wright": the title in front of the name (Energy Secretary) is the role, not part of the name. The old and new text.
· the speaker of a statements row
Speaker read again from the statement's source line, "Energy Secretary Chris Wright": the title in front of the name (Energy Secretary) is the role, not part of the name. The old and new text.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives enr.com. The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives enr.com. The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives enr.com. The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: washingtonexaminer.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: washingtonexaminer.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: washingtonexaminer.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: observer-reporter.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: observer-reporter.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: observer-reporter.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.
Every correction on the record is on the corrections page.
Derek Merrin reported capital gains of at least $1,200 from Nvidia stock and options in a financial disclosure covering 2025 through mid-2026.
Kate Nolan Bryden, Prime Senior Vice President of Development and project lead, testified that the facility will use advanced closed loop cooling systems
Every statement about data centers in Ohio, by speaker
Nvidia CEO and President
Nvidia CEO Jensen Huang said now is the time to scale the AI infrastructure that will power the next industrial revolution
Energy Secretary Chris Wright said the data center will be bigger than any facility ever built in world history
OpenAI said this gives a site that once supported American industry and national security a new role building infrastructure for the Intelligence Era
Merrin voted in 2017 for Ohio's 2018-19 budget which included tax breaks for data centers.
Where in Pike County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.
SB Energy is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is waiting on permits, as reported September 2, 2026. The newest entry, reported September 7, 2026: PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator [2].
Pike County: Ohio Power Siting Board public hearing scheduled for Baku Gavin Transmission Line project on October 27, 2026 at 6 p.m. at Jackson High School Auditorium. (reported September 14, 2026, source). 1 event is on the county's rows; a rule about the area is not a decision about this record.
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
13 sources on file.
Data Center Record, "PORTS-Pike Technology Campus", https://datacenterrecord.org/projects/ports-pike-technology-campus-oh, last verified September 17, 2026.
Data Center Record, "PORTS-Pike Technology Campus", https://datacenterrecord.org/projects/ports-pike-technology-campus-oh. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.