Data Center Record.
Census GEOID: 39131 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 13 reporting sources

● Being Built Reported August 17, 2026 · 4 Buildings

PORTS-Pike Technology Campus

Street address 3930 US Highway 23 South, Piketon, OH 45661, Pike County verified address Exact, at the address U.S. Department of Energy Portsmouth Site (3930 US Highway 23 South, Piketon, Pike County, Ohio) reindustrialization lease record. (opens in a new tab)

Overview, regulatory gates and specifications

SB Energy's PORTS Pike Technology Campus in Pike County is being built as an AI compute campus with NVIDIA guaranteeing exclusive hosting of NVIDIA AI compute, and OpenAI has joined the project, which is reported to require more power than all homes in Ohio. [3] Filings on the record specify 4 planned or operational buildings. [3] PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator [2]

Verified Site & Permit Summary
Verified address
3930 US Highway 23 South, Piketon, OH 45661, Pike County verified address
Operator / developer
SB Energy
Permit / registry ID
OpenAI on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 10 GW (Washington Examiner (opens in a new tab), enr.com (opens in a new tab)); 9.2 GW (enr.com (opens in a new tab)), and 2 more under Comparisons. Their figure, not the record's.
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings permitted
energy.gov (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
SB Energy as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Derek Merrin

Republican congressional candidate · Ohio

DID Recorded statement at TiffinOhio.net (September 28, 2026)
SAID Derek Merrin reported capital gains of at least $1,200 from Nvidia stock and options in a financial disclosure covering 2025 through mid-2026. (September 28, 2026) tiffinohio.net (opens in a new tab)

Kate Nolan Bryden

Prime Data Centers Senior Vice President of Development

DID Recorded statement at Observer-Reporter (September 2, 2026) [6]
SAID Kate Nolan Bryden, Prime Senior Vice President of Development and project lead, testified that the facility will use advanced closed loop cooling systems (September 2, 2026) [6]

Jensen Huang

Nvidia CEO and President

DID Recorded statement at Washington Examiner (August 17, 2026) [13]
SAID Nvidia CEO Jensen Huang said now is the time to scale the AI infrastructure that will power the next industrial revolution (August 17, 2026) [13]
Chris Wright

Chris Wright

Energy Secretary

DID Recorded statement at Washington Examiner (August 17, 2026) [13]
SAID Energy Secretary Chris Wright said the data center will be bigger than any facility ever built in world history (August 17, 2026) [13]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: SB Energy
UTILITIES
Electric utility: Not disclosed

View all 6 statements on the record in Ohio →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for PORTS-Pike Technology Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings site plan
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator

    [2] rtoinsider.com

  2. (source date; the content gives no date of its own)

    Construction on each building expected to take between 14 to 16 months

    [6] observer-reporter.com

  3. (source date; the content gives no date of its own)

    Prime hopes to begin work on the project sometime in early 2027

    [6] observer-reporter.com

  4. · Status: permitting (source date; the content gives no date of its own)

    Prime Data Centers developer detailed Starpointe data center proposal on September 2, 2026

    [6] observer-reporter.com

  5. (source date; the content gives no date of its own)

    PORTS Pike data center campus located on site of former Portsmouth Gaseous Diffusion Plant uranium enrichment facility near Columbus, Ohio

    [4] enr.com

  6. (source date; the content gives no date of its own)

    SB Energy will develop, own and operate data center campus including power generation

    [4] enr.com

  7. · Status: approved (source date; the content gives no date of its own)

    Bechtel and Kiewit Corp tapped to provide engineering, procurement, construction and other services for PORTS Pike

    [4] enr.com

  8. (source date; the content gives no date of its own)

    Project is being built at the Portsmouth Gaseous Diffusion Plant, a former uranium enrichment facility

    [13] washingtonexaminer.com

2 earlier entries
  1. (source date; the content gives no date of its own)

    By 2028 facility is set to generate 800 megawatts before construction is complete

    [13] washingtonexaminer.com

  2. · being built (source date; the content gives no date of its own)

    OpenAI entered into a 20 year lease agreement with SB Energy and SoftBank Group on Monday

    [13] washingtonexaminer.com

Every event in order

22 corrections to this record

Every correction, with its reason
  1. · Speaker role

    Speaker read again from the statement's source line, "Energy Secretary Chris Wright": the title in front of the name (Energy Secretary) is the role, not part of the name.

  2. · Speaker

    Speaker read again from the statement's source line, "Energy Secretary Chris Wright": the title in front of the name (Energy Secretary) is the role, not part of the name.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  9. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  10. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  11. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  12. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  13. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  14. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives enr.com. The link did not change.

  15. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives enr.com. The link did not change.

See all 22 corrections for this record (7 more) →

Every correction on the record is on the corrections page.

Nearest data centers in Ohio

Verified data center records in Ohio within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Amazon Manchester Adams County data center Manchester, Adams County ~39 mi Proposed Amazon Web Services
Ashville data center project Ashville, Pickaway County ~49 mi Proposed EdgeConneX
Mt. Orab Data Center Proposal Mt. Orab, Brown County ~49 mi Proposed 1,000 acres
Wilmington Data Center Wilmington, Clinton County ~52 mi Proposed Amazon Web Services 277 acres
Google Lancaster data center Lancaster, Fairfield County 52 mi Running Google 2 buildings
Google Columbus data center Columbus, Franklin County 59 mi Running Google 2 buildings

Blank cell: not disclosed by any source on file.

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

4 figures, 2 sources
9.2 GW Reported

enr.com, Aug 19, 2026

4.25 GW Reported

enr.com, Aug 19, 2026

Show each source's words
  • 10 GW, Washington Examiner: Plans to eventually expand power capacity to 10 gigawatts
  • 10 GW, enr.com: PORTS Pike Technology Campus planned 10 gigawatt data center campus
  • 9.2 GW, enr.com: PORTS Pike power generation capacity about 9.2 gigawatts from natural gas
  • 8 GW, Washington Examiner: Data center is planned to provide at least 8 gigawatts or 8 billion watts of electrical power
  • 4.25 GW, enr.com: Initial deployment expected to provide 4.25 gigawatts of AI factory capacity

Tax each year

2 figures, 1 source
Show each source's words
  • 2,500,000,000 dollars, TiffinOhio.net: Between 2017 and 2024, Ohio provided about $2.5 billion in tax incentives to attract data center development.
  • 6,300,000 dollars, TiffinOhio.net: American Electric Power Service Corporation received $6.3 million in data center tax breaks from the state as of September 2024.

Common questions about PORTS-Pike Technology Campus

Answered directly from the verified filings and local actions on this page.

Who is building PORTS-Pike Technology Campus?

SB Energy is the developer. No construction contractor is named on the record yet.

Who will use PORTS-Pike Technology Campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does PORTS-Pike Technology Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does PORTS-Pike Technology Campus stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 7, 2026: PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator [2].

What is still unknown about PORTS-Pike Technology Campus?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Nvidia Backs OpenAI’s Ohio Data Center Buildout With $105B Guarantee (opens in a new tab), Data Center Knowledge, August 19, 2026, trade press
  2. Ohio, PJM to Use State Agreement Approach for 10 GW Data Center, Gas Plant - RTO Insider (opens in a new tab), RTO Insider, September 7, 2026, trade press
  3. OpenAI joins PORTS-Pike project - OpenAI (opens in a new tab), OpenAI, August 17, 2026, news outlet
  4. NVIDIA Partners With SB Energy on 10 GW AI Data Center Complex in Ohio - enr.com (opens in a new tab), enr.com, August 19, 2026, news outlet
  5. Data center that could require more power than all of the homes in Ohio being built in Pike County - wlwt.com (opens in a new tab), wlwt.com, August 26, 2026, local outlet
  6. Developer details expansive Starpointe data center proposal - Observer Reporter (opens in a new tab), Observer-Reporter, September 2, 2026, news outlet
  7. OpenAI to build world's biggest AI data center in Ohio. What we know - Cincinnati Enquirer (opens in a new tab), Cincinnati Enquirer, August 24, 2026, local outlet
  8. OpenAI joins world’s largest data center project, brings 35,000 construction jobs to Ohio - NBC4 WCMH-TV (opens in a new tab), NBC4 WCMH-TV, August 19, 2026, local outlet
  9. AI’s natural gas addiction could be deadly for Ohio’s communities - Ohio Capital Journal (opens in a new tab), Ohio Capital Journal, September 1, 2026, local outlet
  10. NVIDIA Guarantees SB Energy’s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute - NVIDIA Newsroom (opens in a new tab), NVIDIA Newsroom, August 17, 2026, news outlet
  11. OpenAI Locks In Lease for Huge Data Center in Ohio With Backing From Nvidia - WSJ (opens in a new tab), WSJ, August 17, 2026, national outlet
  12. OpenAI announces massive data center in Ohio with Nvidia guarantee - Axios (opens in a new tab), Axios, August 17, 2026, national outlet
1 more source
  1. OpenAI and Nvidia join forces for new enormous Ohio data center - Washington Examiner (opens in a new tab), Washington Examiner, August 17, 2026, national outlet

13 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "PORTS-Pike Technology Campus", https://datacenterrecord.org/projects/ports-pike-technology-campus-oh, last verified October 25, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "PORTS-Pike Technology Campus", https://datacenterrecord.org/projects/ports-pike-technology-campus-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
39.0135, -83.0055
How the location is known
Location from the site's street address.
Location source
U.S. Department of Energy Portsmouth Site (3930 US Highway 23 South, Piketon, Pike County, Ohio) reindustrialization lease record.
Coordinate source
DOE Portsmouth Site address point
Location last verified
September 16, 2026
Published
September 4, 2026
Last verified
October 25, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · PORTS-Pike Technology Campus · 13 sources, 10 entries · basis and source tier on every row · verified October 25, 2026

Download CSV JSON