SB Energy's PORTS Pike Technology Campus in Pike County is being built as an AI compute campus with NVIDIA guaranteeing exclusive hosting of NVIDIA AI compute, and OpenAI has joined the project, which is reported to require more power than all homes in Ohio. [3] Filings on the record specify 4 planned or operational buildings. [3] PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator [2]
How much power it needs, how much water it would use and who would use it have not been disclosed.
Connected government officials, corporate entities, utilities and local rules on the public record.
Derek Merrin reported capital gains of at least $1,200 from Nvidia stock and options in a financial disclosure covering 2025 through mid-2026.(September 28, 2026) tiffinohio.net (opens in a new tab)
Kate Nolan Bryden, Prime Senior Vice President of Development and project lead, testified that the facility will use advanced closed loop cooling systems(September 2, 2026) [6]
Nvidia CEO Jensen Huang said now is the time to scale the AI infrastructure that will power the next industrial revolution(August 17, 2026) [13]
Energy Secretary Chris Wright said the data center will be bigger than any facility ever built in world history(August 17, 2026) [13]
View all 6 statements on the record in Ohio →
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for PORTS-Pike Technology Campus.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 4 buildings | site plan | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator
(source date; the content gives no date of its own)
Construction on each building expected to take between 14 to 16 months
(source date; the content gives no date of its own)
Prime hopes to begin work on the project sometime in early 2027
· Status: permitting (source date; the content gives no date of its own)
Prime Data Centers developer detailed Starpointe data center proposal on September 2, 2026
(source date; the content gives no date of its own)
PORTS Pike data center campus located on site of former Portsmouth Gaseous Diffusion Plant uranium enrichment facility near Columbus, Ohio
(source date; the content gives no date of its own)
SB Energy will develop, own and operate data center campus including power generation
· Status: approved (source date; the content gives no date of its own)
Bechtel and Kiewit Corp tapped to provide engineering, procurement, construction and other services for PORTS Pike
(source date; the content gives no date of its own)
Project is being built at the Portsmouth Gaseous Diffusion Plant, a former uranium enrichment facility
(source date; the content gives no date of its own)
By 2028 facility is set to generate 800 megawatts before construction is complete
· being built (source date; the content gives no date of its own)
OpenAI entered into a 20 year lease agreement with SB Energy and SoftBank Group on Monday
Speaker read again from the statement's source line, "Energy Secretary Chris Wright": the title in front of the name (Energy Secretary) is the role, not part of the name.
· Speaker
Speaker read again from the statement's source line, "Energy Secretary Chris Wright": the title in front of the name (Energy Secretary) is the role, not part of the name.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives enr.com. The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives enr.com. The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Ohio within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Amazon Manchester Adams County data center Manchester, Adams County | ~39 mi | Proposed | Amazon Web Services | |
| Ashville data center project Ashville, Pickaway County | ~49 mi | Proposed | EdgeConneX | |
| Mt. Orab Data Center Proposal Mt. Orab, Brown County | ~49 mi | Proposed | 1,000 acres | |
| Wilmington Data Center Wilmington, Clinton County | ~52 mi | Proposed | Amazon Web Services | 277 acres |
| Google Lancaster data center Lancaster, Fairfield County | 52 mi | Running | 2 buildings | |
| Google Columbus data center Columbus, Franklin County | 59 mi | Running | 2 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
SB Energy is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 7, 2026: PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator [2].
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
13 sources on file.
This site is in the RFC West (RFCW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. PORTS-Pike Technology Campus. Last verified October 25, 2026. https://datacenterrecord.org/projects/ports-pike-technology-campus-oh. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about PORTS-Pike Technology Campus
Data Center Record, "PORTS-Pike Technology Campus", https://datacenterrecord.org/projects/ports-pike-technology-campus-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.