lieutenant governor of Ohio
Jon Husted defended tax incentives for Google's New Albany data center, saying economic benefits would outweigh the incentives
Google lists a data center at Lancaster, Ohio among the sites it operates. It is running; the record holds no sourced date for when it reached that stage.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | as stated by the source | September 19, 2026 | ||
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
(source date; the content gives no date of its own)
Google's Lancaster data center opened in 2023 [2]
· Status: running (the day the page was read; it gives no date of its own)
Google lists Google Lancaster data center at Lancaster, Ohio on its own page of data center locations, read September 14, 2026. [1]
Jon Husted said that artificial intelligence and data centers were crucial to America's economic superiority because they drive innovation, support high tech industries, and help analyze vast data essential for global competitiveness
Brown's campaign placed an ad on September 4 attacking data centers in Ohio
Every statement about data centers in Ohio, by speaker
lieutenant governor of Ohio
Jon Husted defended tax incentives for Google's New Albany data center, saying economic benefits would outweigh the incentives
Where in Lancaster is not in the public record. The pin marks the center of Lancaster, not a building, and the outline is Fairfield County.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
Google is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 19, 2026: Google's Lancaster data center opened in 2023 [2].
No decision by Lancaster or Fairfield County about data centers is on the record. The Fairfield County page and the Ohio scorecard list every rated row the day a person publishes one.
2 sources on file.
Data Center Record, "Google Lancaster data center", https://datacenterrecord.org/projects/google-lancaster-data-center-oh, last verified September 19, 2026.
Data Center Record, "Google Lancaster data center", https://datacenterrecord.org/projects/google-lancaster-data-center-oh. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.