● Running First recorded September 14, 2026 · 3 Buildings

Google New Albany data center

Street address 1101 Beech Rd SW, New Albany, OH 43054, Franklin County permit coordinates Exact, the point of the EPA's facility record [2] EPA ECHO detailed facility report: Google New Albany Data Center (110070866661)

Overview, regulatory gates and specifications

Google lists a data center at New Albany, Ohio among the sites it operates. [1] Filings on the record specify 3 planned or operational buildings. [1] Google lists Google New Albany data center at New Albany, Ohio on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
3 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1101 Beech Rd SW, New Albany, OH 43054.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
3 buildings operator page
google.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2020 (6 years)
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Helena Volzer

director of water resources, Alliance for the Great Lakes

DID Recorded statement at News 5 Cleveland WEWS (September 16, 2026)
SAID Helena Volzer, director of water resources at the Alliance for the Great Lakes, said it's very difficult to craft conservation standards when the exact water consumption is unknown (September 16, 2026) news5cleveland.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google New Albany data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 3 buildings 3 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

2025 to 2026 hearings
March 11, 2026 Columbus, OH Columbus City Council Public Hearing on Central Ohio Data Center Water and Tax Impacts Columbus City Council 2 clips

Columbus City Council President Shannon Hardin convened a public hearing on March 11, 2026 examining how hyperscale data centers across Central Ohio affect Columbus municipal water supply, electric grid capacity, and local taxpayers.

  1. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "The goal of the hearing was to develop the city's strategy on how to address the challenges that come with these developments. Although most of the data centers located across central Ohio are not built within the city of Columbus, City council President Shannon Hardin said Columbus residents and service providers still bear the responsibility of supplying the electricity. and water they require, he noted that data centers use millions of gallons of water each day."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Data centers for me are a test of if we can get that balance right. 83% of data centers in Virginia use the same or less water than an average office building. some even use less than a typical household. Large data centers may require up to 5 million gallons of water per day. That compares to, to the water needs of a city of about 50,000 residents, about the size of the city of Dublin. Now,"
2019 to 2024 hearings
October 2, 2024 New Albany, OH New Albany residents express mixed opinions over incoming Microsoft data center New Albany City Council 3 clips

New Albany City Council approval of 100 percent 15 to 30 year Community Reinvestment Area property tax abatements for Meta, Google, and Amazon Web Services (October 2, 2024).

  1. New Albany Economic Development and Applicant Presentation (WBNS 10TV Report) Broadcast Report transcribed from local broadcast report
    "Central Ohio, joining companies like Intel, Amazon, and Google. All playing a role into turning Ohio into the Silicon Heartland and contributing to Central Ohio's explosive growth. Thanks for joining us tonight at 6:00. I'm Yolanda Harris. I'm Andrew Kinsey, and with the growth in boomtown comes challenges. These data centers absorb massive amounts of electricity and provide very few jobs."
  2. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "be the home of Microsoft's next project. And for some, the energy and resource use isn't the only concern they have. The wheels of progress continue to turn in Central Ohio, but that progress rarely happens without disrupting those around it. The sounds of a massive construction project echo through this subdivision built long before any of this was out here. Now, Microsoft's"
  3. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "they do. Data centers also consume a lot of power. According to real estate company Newmark, the largest consume enough electricity to power 80,000 homes. That requires new infrastructure by AEP and the power company wants them to pay for almost all of the projected power usage for the first 10 years of operation, even if they don't use it. AEP's argument is that if companies like"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Central Ohio Economic Development Officials and AWS Executives State and Municipal Economic Development Officials and AWS Representatives
Venue: Central Ohio $7.8 Billion AWS Expansion and CRA Tax Abatement Announcements
"Granting 100 percent 15 to 30 year Community Reinvestment Area property tax abatements and state sales tax exemptions is essential to anchor high paying technology jobs and net revenue growth for Central Ohio cities and school districts."
Column B · Primary Government Record
Ohio Tax Expenditure Report and PUCO Case No. 24-0508 EL ATA Data Center Minimum Demand Tariff Order
PUCO Case No. 24-0508 EL ATA · Franklin and Licking County CRA Compliance Filings
Agency or Venue: Public Utilities Commission of Ohio (PUCO) and County Auditors
"County CRA compliance filings show 100 percent property tax abatements forgave tens of millions in local school and municipal taxes for campuses requiring only 25 to 50 permanent employees per building, while AEP Ohio and PUCO Case No. 24-0508 EL ATA documented a 5,000 megawatt Central Ohio grid deficit requiring an 85 percent minimum demand charge."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google New Albany data center at New Albany, Ohio on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

Nearest data centers in Ohio

Verified data center records in Ohio within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Meta New Albany Data Center New Albany, Franklin County 1 mi Running Meta 5 buildings
STACK NAL01 New Albany, Franklin County 2 mi Running STACK Infrastructure 2 buildings
Microsoft New Albany datacenter New Albany, Franklin County 3 mi Running Microsoft 1 building
Vantage New Albany New Albany, Franklin County 3 mi Running Vantage Data Centers 2 buildings
QTS Data Centers New Albany New Albany, Franklin County 3 mi Being built QTS Data Centers 4 buildings
Edged New Albany data center New Albany, Franklin County 3 mi Running Edged 24 MW

Blank cell: not disclosed by any source on file.

Common questions about Google New Albany data center

Answered directly from the verified filings and local actions on this page.

Who is building Google New Albany data center?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google New Albany data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google New Albany data center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026
  2. EPA ECHO detailed facility report: Google New Albany Data Center (110070866661) (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. Google subsidiary acquires 85-acre site in New Albany - WSYX (opens in a new tab), WSYX, June 16, 2025, local outlet

3 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google New Albany data center", https://datacenterrecord.org/projects/google-new-albany-data-center-oh, last verified October 25, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google New Albany data center", https://datacenterrecord.org/projects/google-new-albany-data-center-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.05067, -82.7557
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO Detailed Facility Report (FRS ID 110070866661, NPDES OH0151491) at Morse Rd and Beech Rd SW, New Albany, Franklin County, Ohio.
Coordinate source
EPA ECHO FRS ID 110070866661
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
October 25, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Google New Albany data center · 3 sources, 1 entry · basis and source tier on every row · verified October 25, 2026

Download CSV JSON