Meta New Albany Data Center

Street address 1300 Beech Rd SW, New Albany, OH 43054, Franklin County permit coordinates Exact, the point of the EPA's facility record [2] EPA ECHO detailed facility report: Sidecat LLC / Meta New Albany Data Center (110070887474)

Overview, regulatory gates and specifications

Meta lists a data center at New Albany, Ohio among the sites it operates. [3] Filings on the record specify 5 planned or operational buildings. [1] Meta lists Meta New Albany Data Center at New Albany, Ohio on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
5 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1300 Beech Rd SW, New Albany, OH 43054.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 400 MW (Utah News Dispatch (opens in a new tab)). Their figure, not the record's.
Water usage
Not disclosed
Land area
Not disclosed
Buildings
5 buildings operator page
[1] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2020 (6 years)
Who leads it
Meta as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Cathy Cowan Becker

Advocate against fracking and data center expansion · Environmental advocacy group

DID Recorded statement at Ohio Power Siting Board hearing (October 7, 2026)
SAID At one time had 100% renewable energy goals and they have bought several power from several solar plants, but that was in the past. Just in this past year, they have moved to building out a lot of these gas plants. And not just in Ohio. So what I would say to Meta is you should be using renewable energy for this. (October 7, 2026) spectrumnews1.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

View all 2 statements on the record in Ohio →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta New Albany Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 5 buildings 5 operator page [1] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

2025 to 2026 hearings
March 11, 2026 Columbus, OH Columbus City Council Public Hearing on Central Ohio Data Center Water and Tax Impacts Columbus City Council 2 clips

Columbus City Council President Shannon Hardin convened a public hearing on March 11, 2026 examining how hyperscale data centers across Central Ohio affect Columbus municipal water supply, electric grid capacity, and local taxpayers.

  1. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "The goal of the hearing was to develop the city's strategy on how to address the challenges that come with these developments. Although most of the data centers located across central Ohio are not built within the city of Columbus, City council President Shannon Hardin said Columbus residents and service providers still bear the responsibility of supplying the electricity. and water they require, he noted that data centers use millions of gallons of water each day."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Data centers for me are a test of if we can get that balance right. 83% of data centers in Virginia use the same or less water than an average office building. some even use less than a typical household. Large data centers may require up to 5 million gallons of water per day. That compares to, to the water needs of a city of about 50,000 residents, about the size of the city of Dublin. Now,"
2019 to 2024 hearings
October 2, 2024 New Albany, OH New Albany residents express mixed opinions over incoming Microsoft data center New Albany City Council 3 clips

New Albany City Council approval of 100 percent 15 to 30 year Community Reinvestment Area property tax abatements for Meta, Google, and Amazon Web Services (October 2, 2024).

  1. New Albany Economic Development and Applicant Presentation (WBNS 10TV Report) Broadcast Report transcribed from local broadcast report
    "Central Ohio, joining companies like Intel, Amazon, and Google. All playing a role into turning Ohio into the Silicon Heartland and contributing to Central Ohio's explosive growth. Thanks for joining us tonight at 6:00. I'm Yolanda Harris. I'm Andrew Kinsey, and with the growth in boomtown comes challenges. These data centers absorb massive amounts of electricity and provide very few jobs."
  2. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "be the home of Microsoft's next project. And for some, the energy and resource use isn't the only concern they have. The wheels of progress continue to turn in Central Ohio, but that progress rarely happens without disrupting those around it. The sounds of a massive construction project echo through this subdivision built long before any of this was out here. Now, Microsoft's"
  3. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "they do. Data centers also consume a lot of power. According to real estate company Newmark, the largest consume enough electricity to power 80,000 homes. That requires new infrastructure by AEP and the power company wants them to pay for almost all of the projected power usage for the first 10 years of operation, even if they don't use it. AEP's argument is that if companies like"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Central Ohio Economic Development Officials and AWS Executives State and Municipal Economic Development Officials and AWS Representatives
Venue: Central Ohio $7.8 Billion AWS Expansion and CRA Tax Abatement Announcements
"Granting 100 percent 15 to 30 year Community Reinvestment Area property tax abatements and state sales tax exemptions is essential to anchor high paying technology jobs and net revenue growth for Central Ohio cities and school districts."
Column B · Primary Government Record
Ohio Tax Expenditure Report and PUCO Case No. 24-0508 EL ATA Data Center Minimum Demand Tariff Order
PUCO Case No. 24-0508 EL ATA · Franklin and Licking County CRA Compliance Filings
Agency or Venue: Public Utilities Commission of Ohio (PUCO) and County Auditors
"County CRA compliance filings show 100 percent property tax abatements forgave tens of millions in local school and municipal taxes for campuses requiring only 25 to 50 permanent employees per building, while AEP Ohio and PUCO Case No. 24-0508 EL ATA documented a 5,000 megawatt Central Ohio grid deficit requiring an 85 percent minimum demand charge."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta New Albany Data Center at New Albany, Ohio on its own page of data center locations, read September 14, 2026.

    [1] datacenters.atmeta.com

Nearest data centers in Ohio

Verified data center records in Ohio within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
STACK NAL01 New Albany, Franklin County 1 mi Running STACK Infrastructure 2 buildings
Google New Albany data center New Albany, Franklin County 1 mi Running Google 3 buildings
Microsoft New Albany datacenter New Albany, Franklin County 1 mi Running Microsoft 1 building
Vantage New Albany New Albany, Franklin County 2 mi Running Vantage Data Centers 2 buildings
Edged New Albany data center New Albany, Franklin County 3 mi Running Edged 24 MW
QTS Data Centers New Albany New Albany, Franklin County 3 mi Being built QTS Data Centers 4 buildings

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
Show each source's words
  • 400 MW, Utah News Dispatch: Meta data center in New Albany, Ohio powered by 400MW of dedicated natural gas turbines

Common questions about Meta New Albany Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Meta New Albany Data Center?

Meta is the developer. No construction contractor is named on the record yet.

Who will use Meta New Albany Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Meta New Albany Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta New Albany Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What is still unknown about Meta New Albany Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  2. EPA ECHO detailed facility report: Sidecat LLC / Meta New Albany Data Center (110070887474) (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. Ohio regulators approve construction of 200MW gas power plant to serve Meta's New Albany data center - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 10, 2025, news outlet
  2. Meta DC infrastructure partner purchases $42m land parcel in New Albany, Ohio - Data Center Dynamics (opens in a new tab), Data Center Dynamics, January 14, 2026, news outlet
  3. Meta will use nuclear power for its New Albany A.I. data center - NBC4 WCMH-TV (opens in a new tab), NBC4 WCMH-TV, January 9, 2026, local outlet
  4. Workers sent home after employee found with gun at Meta data center site in New Albany - NBC4 WCMH-TV (opens in a new tab), NBC4 WCMH-TV, November 17, 2025, local outlet
  5. Second Meta plant to power New Albany data centers nears approval - The Business Journals (opens in a new tab), The Business Journals, September 11, 2025, public registry
  6. New 200-MW Gas-Fired Plant in Ohio Will Power Meta Data Center - POWER Magazine (opens in a new tab), POWER Magazine, June 10, 2025, public registry
  7. Meta’s New Albany data center campus adds second power plant - The Business Journals (opens in a new tab), The Business Journals, September 19, 2025, public registry
  8. Facebook parent Meta buys 29 acres near New Albany data center campus - Columbus Business First - The Business Journals (opens in a new tab), The Business Journals, May 9, 2025, public registry
  9. Facebook parent Meta to expand New Albany data center by 1 million square feet - The Columbus Dispatch (opens in a new tab), The Columbus Dispatch, April 21, 2022, public registry
  10. New Albany Data Center announces expansion of its business - WSYX (opens in a new tab), WSYX, April 21, 2022, public registry
  11. Gun confiscated at Meta data center in New Albany, Ohio - Data Center Dynamics (opens in a new tab), Data Center Dynamics, November 18, 2025, news outlet
  12. Meta expanding New Albany site for the world's highest capacity data center - The Columbus Dispatch (opens in a new tab), The Columbus Dispatch, September 26, 2025, local outlet
8 more sources
  1. Meta data center firm Sidecat buys nearly $42 million New Albany parcel - The Columbus Dispatch (opens in a new tab), The Columbus Dispatch, January 14, 2026, local outlet
  2. Meta wants to draw power for unused New Albany electrical substation built for Intel project - WOSU Public Media (opens in a new tab), WOSU Public Media, November 26, 2025, local outlet
  3. Another on-site power plant for New Albany data center campus gets green light - The Business Journals (opens in a new tab), The Business Journals, November 21, 2025, local outlet
  4. New Albany Data Center Will Bring High Costs for Both Consumers and the Environment - KentStater (opens in a new tab), KentStater, October 10, 2025, news outlet
  5. Meta data center in New Albany evacuated, workers sent home after gun scare - The Columbus Dispatch (opens in a new tab), The Columbus Dispatch, November 17, 2025, local outlet
  6. Hollow Promises in Ohio’s Silicon Heartland - The American Prospect (opens in a new tab), The American Prospect, March 5, 2026, national outlet
  7. Meta lines up supply of nuclear power to energize AI data centers, including New Albany - WSYX (opens in a new tab), WSYX, January 9, 2026, local outlet
  8. Meta will use nuclear power for its New Albany A.I. data center - nbc4i.com (opens in a new tab), nbc4i.com, January 9, 2026, local outlet

22 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta New Albany Data Center", https://datacenterrecord.org/projects/meta-new-albany-data-center-oh, last verified October 25, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta New Albany Data Center", https://datacenterrecord.org/projects/meta-new-albany-data-center-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.06899, -82.7495
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO Detailed Facility Report (FRS ID 110070887474, Sidecat LLC / Meta New Albany Data Center) at 1300-1700 Beech Rd SW, New Albany, Franklin County, Ohio.
Coordinate source
EPA ECHO FRS ID 110070887474
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
October 25, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta New Albany Data Center · 22 sources, 1 entry · basis and source tier on every row · verified October 25, 2026