Microsoft lists a data center at New Albany, Ohio among the sites it operates. [3] Filings on the record specify 1 planned or operational building. [3] Microsoft lists Microsoft New Albany datacenter at New Albany, Ohio on its own page of data center locations, read September 14, 2026. [2]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 2200 Beech Rd NW, New Albany, OH 43054.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Microsoft New Albany datacenter.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Columbus City Council President Shannon Hardin convened a public hearing on March 11, 2026 examining how hyperscale data centers across Central Ohio affect Columbus municipal water supply, electric grid capacity, and local taxpayers.
"The goal of the hearing was to develop the city's strategy on how to address the challenges that come with these developments. Although most of the data centers located across central Ohio are not built within the city of Columbus, City council President Shannon Hardin said Columbus residents and service providers still bear the responsibility of supplying the electricity. and water they require, he noted that data centers use millions of gallons of water each day."
"Data centers for me are a test of if we can get that balance right. 83% of data centers in Virginia use the same or less water than an average office building. some even use less than a typical household. Large data centers may require up to 5 million gallons of water per day. That compares to, to the water needs of a city of about 50,000 residents, about the size of the city of Dublin. Now,"
Using this data in a report? Support the record.
New Albany City Council approval of 100 percent 15 to 30 year Community Reinvestment Area property tax abatements for Meta, Google, and Amazon Web Services (October 2, 2024).
"Central Ohio, joining companies like Intel, Amazon, and Google. All playing a role into turning Ohio into the Silicon Heartland and contributing to Central Ohio's explosive growth. Thanks for joining us tonight at 6:00. I'm Yolanda Harris. I'm Andrew Kinsey, and with the growth in boomtown comes challenges. These data centers absorb massive amounts of electricity and provide very few jobs."
"be the home of Microsoft's next project. And for some, the energy and resource use isn't the only concern they have. The wheels of progress continue to turn in Central Ohio, but that progress rarely happens without disrupting those around it. The sounds of a massive construction project echo through this subdivision built long before any of this was out here. Now, Microsoft's"
"they do. Data centers also consume a lot of power. According to real estate company Newmark, the largest consume enough electricity to power 80,000 homes. That requires new infrastructure by AEP and the power company wants them to pay for almost all of the projected power usage for the first 10 years of operation, even if they don't use it. AEP's argument is that if companies like"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
Meta seeks to use idle AEP Ohio substation for New Albany data center
(source date; the content gives no date of its own)
Microsoft postpones $1 billion data center plan in central Ohio
(source date; the content gives no date of its own)
Microsoft purchased $11.4 million in land in Pataskala, Ohio
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
Microsoft lists Microsoft New Albany datacenter at New Albany, Ohio on its own page of data center locations, read September 14, 2026.
Normalize vote tallies ('X to Y') and dollar figures ('$X million/billion') to house style.
Every correction on the record is on the corrections page.
Verified data center records in Ohio within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Vantage New Albany New Albany, Franklin County | Less than 1 mi | Running | Vantage Data Centers | 2 buildings |
| STACK NAL01 New Albany, Franklin County | Less than 1 mi | Running | STACK Infrastructure | 2 buildings |
| Meta New Albany Data Center New Albany, Franklin County | 1 mi | Running | Meta | 5 buildings |
| Edged New Albany data center New Albany, Franklin County | 2 mi | Running | Edged | 24 MW |
| Google New Albany data center New Albany, Franklin County | 3 mi | Running | 3 buildings | |
| QTS Data Centers New Albany New Albany, Franklin County | 3 mi | Being built | QTS Data Centers | 4 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Microsoft is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is running, as reported December 4, 2024. The newest entry, reported December 4, 2025: Meta seeks to use idle AEP Ohio substation for New Albany data center [12].
Official operator or facility campus page verified in 50 state website discovery pass.
14 sources on file.
This site is in the RFC West (RFCW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Microsoft New Albany datacenter. Last verified October 25, 2026. https://datacenterrecord.org/projects/microsoft-new-albany-datacenter-oh. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Microsoft New Albany datacenter
Data Center Record, "Microsoft New Albany datacenter", https://datacenterrecord.org/projects/microsoft-new-albany-datacenter-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.