Edged New Albany data center

New Albany, Franklin County, OHDeveloper: EdgedCensus GEOID 39049

Stage
Running
Operational since 2025 (1 year)
Power
24 MW
the developer's figure
Buildings
1 building
operator page
Undisclosed in public filings
Land, Water

Edged operates its 24 MW, 206,000 square foot Edged Columbus (CMH01) data center at 6526 New Albany Road East in New Albany, Franklin County, Ohio, commissioned in September 2025 with a waterless closed loop cooling system. It is running, since September 22, 2025.

How much water it would use and who would use it have not been disclosed.

Last verified · 2 sources, 1 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 37 other published records in Ohio
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Commissioned
Operational since 2025 (1 year)
Buildings
1 building operator page
[1] edged.us
Power it would draw
24 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
[1] edged.us
Who leads it
Edged as stated by the source
How it is cooled
Closed loop liquid as stated by the source
[1] edged.us
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Edged New Albany data center, capacity: 24 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 24 ÷ 10,245 = 0 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 24 MW the developer's figure [1] edged.us (opens in a new tab) October 25, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Edged as stated by the source October 25, 2026
Who is constructing it
How much land
Buildings 1 building operator page [1] edged.us (opens in a new tab) October 25, 2026
Where its power comes from
Grid connection
How it is cooled Closed loop liquid as stated by the source [1] edged.us (opens in a new tab) October 25, 2026
Cooling fluid

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: running (content date)

    Edged opened a 24 MW, 206,000 sq ft data center at 6526 New Albany Road East in New Albany, Ohio, with waterless cooling, having broken ground in August 2024.

    [1] edged.us

The full Edged New Albany data center timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
6526 New Albany Road East, New Albany, OH 43054, New Albany, Franklin County, Ohio [1] edged.us (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Edged New Albany data center
LAT 40.09560 / LON -82.78450 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Edged New Albany data center?

The record has 2 measures of its size: 24 MW (the developer's figure, edged.us (opens in a new tab)) and 1 building (operator page, edged.us (opens in a new tab)). Its acreage is not disclosed.

Who is building Edged New Albany data center?

Edged is the developer. No construction contractor is named on the record yet.

How much power and water does Edged New Albany data center say it needs?

Power: 24 MW (the developer's figure, edged.us (opens in a new tab)). Water: not disclosed by any source on file.

What has New Albany or Franklin County decided about it?

No decision by New Albany or Franklin County about data centers is on the record. The Franklin County page and the Ohio scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Edged US: Edged Columbus (6526 New Albany Road East, New Albany, OH) Facility Specifications (opens in a new tab), Edged

Reporting

  1. Edged opens data center in New Albany, Ohio - Data Center Dynamics (opens in a new tab), Data Center Dynamics, September 22, 2025, query feed

2 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Edged New Albany data center", https://datacenterrecord.org/projects/edged-new-albany-data-center-oh, last verified October 25, 2026. CSV · JSON
Cite this page

Data Center Record, "Edged New Albany data center", https://datacenterrecord.org/projects/edged-new-albany-data-center-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.0956, -82.7845
How the location is known
Location from the site's street address.
Location source
Edged Columbus (CMH01) facility specification page at 6526 New Albany Road East, New Albany, Franklin County, Ohio.
Coordinate source
operator address point
Cooling
Closed loop liquid
How capacity was disclosed
the developer's figure
Capacity, if disclosed
24 MW, the developer's figure
Published
October 21, 2026
Last verified
October 25, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows