Census GEOID: 39049 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and 3 reporting sources

● Running Recorded July 29, 2026 · 2 Buildings

Vantage New Albany

Street address 2500 Beech Rd NW, New Albany, OH 43054, Franklin County verified address Exact, at the address [2] Vantage Data Centers Ohio (OH1) campus specification at 2500 Beech Rd NW, New Albany, Franklin County, Ohio.

Overview, regulatory gates and specifications

Vantage Data Centers lists a data center at New Albany, Ohio among the sites it operates. [3] Filings on the record specify 2 planned or operational buildings. [2] Vantage Data Centers lists Vantage New Albany at New Albany, Ohio on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2500 Beech Rd NW, New Albany, OH 43054.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[2] vantage-dc.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2024 (2 years)
Who leads it
Vantage Data Centers as stated by the source
Official project website
vantage-dc.com (opens in a new tab) verified October 28, 2026
vantage-dc.com (opens in a new tab)
Archived promotional websites
vantage-dc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Vantage Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Vantage New Albany.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [2] vantage-dc.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

2025 to 2026 hearings
March 11, 2026 Columbus, OH Columbus City Council Public Hearing on Central Ohio Data Center Water and Tax Impacts Columbus City Council 2 clips

Columbus City Council President Shannon Hardin convened a public hearing on March 11, 2026 examining how hyperscale data centers across Central Ohio affect Columbus municipal water supply, electric grid capacity, and local taxpayers.

  1. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "The goal of the hearing was to develop the city's strategy on how to address the challenges that come with these developments. Although most of the data centers located across central Ohio are not built within the city of Columbus, City council President Shannon Hardin said Columbus residents and service providers still bear the responsibility of supplying the electricity. and water they require, he noted that data centers use millions of gallons of water each day."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Data centers for me are a test of if we can get that balance right. 83% of data centers in Virginia use the same or less water than an average office building. some even use less than a typical household. Large data centers may require up to 5 million gallons of water per day. That compares to, to the water needs of a city of about 50,000 residents, about the size of the city of Dublin. Now,"
2019 to 2024 hearings
October 2, 2024 New Albany, OH New Albany residents express mixed opinions over incoming Microsoft data center New Albany City Council 3 clips

New Albany City Council approval of 100 percent 15 to 30 year Community Reinvestment Area property tax abatements for Meta, Google, and Amazon Web Services (October 2, 2024).

  1. New Albany Economic Development and Applicant Presentation (WBNS 10TV Report) Broadcast Report transcribed from local broadcast report
    "Central Ohio, joining companies like Intel, Amazon, and Google. All playing a role into turning Ohio into the Silicon Heartland and contributing to Central Ohio's explosive growth. Thanks for joining us tonight at 6:00. I'm Yolanda Harris. I'm Andrew Kinsey, and with the growth in boomtown comes challenges. These data centers absorb massive amounts of electricity and provide very few jobs."
  2. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "be the home of Microsoft's next project. And for some, the energy and resource use isn't the only concern they have. The wheels of progress continue to turn in Central Ohio, but that progress rarely happens without disrupting those around it. The sounds of a massive construction project echo through this subdivision built long before any of this was out here. Now, Microsoft's"
  3. WBNS 10TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "they do. Data centers also consume a lot of power. According to real estate company Newmark, the largest consume enough electricity to power 80,000 homes. That requires new infrastructure by AEP and the power company wants them to pay for almost all of the projected power usage for the first 10 years of operation, even if they don't use it. AEP's argument is that if companies like"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: proposed (content date)

    Vantage Data Centers is building a $2 billion, 192 megawatt hyperscale campus in New Albany with Turner Construction as general contractor, targeting initial operations by late 2025 with completion by 2028.

    constructionreviewonline.com (opens in a new tab) news outlet

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Vantage Data Centers lists Vantage New Albany at New Albany, Ohio on its own page of data center locations, read September 14, 2026.

    [2] vantage-dc.com

Nearest data centers in Ohio

Verified data center records in Ohio within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Microsoft New Albany datacenter New Albany, Franklin County Less than 1 mi Running Microsoft 1 building
STACK NAL01 New Albany, Franklin County Less than 1 mi Running STACK Infrastructure 2 buildings
Meta New Albany Data Center New Albany, Franklin County 2 mi Running Meta 5 buildings
Edged New Albany data center New Albany, Franklin County 2 mi Running Edged 24 MW
Google New Albany data center New Albany, Franklin County 3 mi Running Google 3 buildings
QTS Data Centers New Albany New Albany, Franklin County 3 mi Being built QTS Data Centers 4 buildings

Blank cell: not disclosed by any source on file.

Common questions about Vantage New Albany

Answered directly from the verified filings and local actions on this page.

Who is building Vantage New Albany?

Vantage Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Vantage New Albany say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Vantage New Albany stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Vantage Data Centers: Data center locations (opens in a new tab), Vantage Data Centers, September 14, 2026
  2. Vantage Data Centers: Vantage New Albany (opens in a new tab), Vantage Data Centers, September 14, 2026

Reporting

  1. Data Center Investment Boom Rolls On: DigitalBridge, Yondr, Vantage, New Albany, AustralianSuper, DataBank - Data Center Frontier (opens in a new tab), Data Center Frontier, November 6, 2024, news outlet
  2. Vorys Assists Vantage Data Centers in Hyperscale Data Center Development Project - Vorys | Law Firm (opens in a new tab), Vorys | Law Firm, January 5, 2025, news outlet
  3. Turner Selected for $2B Expansion Project for Vantage Data Centers - Associated Construction Publications (opens in a new tab), Associated Construction Publications, November 21, 2024, news outlet

5 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Vantage New Albany", https://datacenterrecord.org/projects/vantage-new-albany-oh, last verified October 25, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Vantage New Albany", https://datacenterrecord.org/projects/vantage-new-albany-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.0912, -82.7548
How the location is known
Location from the site's street address.
Location source
Vantage Data Centers Ohio (OH1) campus specification at 2500 Beech Rd NW, New Albany, Franklin County, Ohio.
Coordinate source
operator address point
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
October 25, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Vantage New Albany · 5 sources, 2 entries · basis and source tier on every row · verified October 25, 2026