QTS Data Centers New Albany
QTS Data Centers lists 2 data centers at New Albany, Ohio and says they are being built. It is being built; the record holds no sourced date for when it reached that stage.
How much power it needs and how much water it would use have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened. An offer to the community is shown as its source states it, with its condition, and never added to another.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- 93 acres
- third party estimate [2]
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- QTS Data Centers
- as stated by the source
- Who would use it
- co-location
- as the source names them [2]
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | QTS Data Centers | as stated by the source | October 6, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | 93 acres | third party estimate | [2] abc6onyourside.com | October 6, 2026 |
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
-
· Status: being built (the day the page was read; it gives no date of its own)
QTS Data Centers lists QTS New Albany 1, QTS New Albany 2 at New Albany, Ohio on its own page of data center locations, read September 14, 2026. [1]
The site
Where in New Albany is not in the public record. The pin marks the center of New Albany, not a building, and the outline is Franklin County.
Tap a pin for the data center, the parcel for its record
- This record: Being built, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 29 other published records in Ohio
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- New Albany, Franklin County, Ohio
- How exactly it is located
- Town level, the center of the city
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at the center of its town.
What the developer has offered
payment to a government, from City of New Albany
-
Payment to a government offered
New Albany negotiated revenue structure with data centers produces same amount as income tax for Class A office sites [2]
- Offered by
- City of New Albany
- To
- “New Albany”
- Amount
- “revenue equivalent to Class A office site income tax”, in the source's words
- On what condition
- None stated by the source
- Date
- Reported October 23, 2023
Kind government_payment, recipients municipality, condition none_stated, status offered, date basis: source date; the content gives no date of its own.
Questions about this project
7 questions answered from the record
How big is QTS Data Centers New Albany?
-
The record has one measure of its size: 93 acres (third party estimate, source). Its power capacity is not disclosed.
Who is building QTS Data Centers New Albany?
-
QTS Data Centers is the developer. No construction contractor is named on the record yet.
Who will use QTS Data Centers New Albany?
-
The named tenant is co-location.
What has been offered to the community around QTS Data Centers New Albany?
-
Payment to a government from City of New Albany, to “New Albany” (offered), source. Each is shown with its condition under What the developer has offered.
How much power and water does QTS Data Centers New Albany say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does QTS Data Centers New Albany stand today?
-
It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: QTS Data Centers lists QTS New Albany 1, QTS New Albany 2 at New Albany, Ohio on its own page of data center locations, read September 14, 2026. [1]
What has New Albany or Franklin County decided about it?
-
No decision by New Albany or Franklin County about data centers is on the record. The Franklin County page and the Ohio scorecard list every rated row the day a person publishes one.
Sources
Primary documents
- QTS Data Centers: All locations, QTS Data Centers, September 14, 2026
Reporting
- Data center company QTS investing $1.5B into New Albany - WSYX, WSYX, October 23, 2023, local outlet
2 sources on file.
Cite this record
Data Center Record, "QTS Data Centers New Albany", https://datacenterrecord.org/projects/qts-data-centers-new-albany-oh, last verified October 6, 2026.
Cite this page
Data Center Record, "QTS Data Centers New Albany", https://datacenterrecord.org/projects/qts-data-centers-new-albany-oh. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- qts-data-centers-new-albany-oh
- Status value
- under_construction
- Stage
- Being built
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/oh/franklin-county/new-albany
- Coordinates
- 40.0878375, -82.7722735
- Location precision
- city
- Location source
- U.S. Census Bureau TIGERweb city centroid, public domain
- Coordinate source
- tigerweb city centroid
- Location source number
- Not disclosed
- Location last verified
- September 14, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- third_party_estimate
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-09-14
- Last verified
- 2026-10-06