Data Center Record.

Reported Built from one source

Wilmington Data Center

A proposed data center in Wilmington prompted an emergency rezoning lawsuit and a residents ballot fight taken to the Ohio Supreme Court. It is reported, as reported September 21, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 5 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Clinton County and Wilmington about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Wilmington The proposed ordinance would have regulated noise levels, water use, chemical discharge, light pollution, generator testing, heat generation, and required long term decommissioning plans for data centers wcpo.com
Wilmington Ohio Supreme Court ruled 6-1 on September 19, 2026 that the Clinton County Board of Elections was justified in blocking a citizen referendum that would have created new rules for data centers addressing noise, water usage, and generators wlwt.com
Wilmington Proposed Wilmington ordinance would set standards around noise, light pollution, water use, discharge and heat generation for data centers fox19.com
Wilmington Wilmington City Council passed data center noise ordinance with emergency language in August 2026 courtnewsohio.gov
Wilmington Wilmington City Council passed rezoning ordinance from Rural Residential to Light Industrial in early September 2026 for data center project courtnewsohio.gov
Wilmington Proposed ordinance would confer private right of action on affected residents with fines of $5,000 to $10,000 per day for data center operator violations courtnewsohio.gov
13 earlier decisions on the county's rows
DateWhoDecisionSource
Wilmington Proposed Wilmington ordinance would establish enforceable standards for noise, lighting, airborne emissions, generator testing frequency, water use and discharge, heat generation courtnewsohio.gov
Wilmington Ohio Supreme Court ruled 6-1 to block the citizen led ballot measure on Friday wcpo.com
Wilmington Clinton County Board of Elections voted unanimously in August 2026 not to certify the ballot initiative after the city law director raised concerns about the proposed right to sue. local12.com
Wilmington The ordinance would have allowed affected residents to bring lawsuits against data center operators with potential daily fines, suspended certificate of occupancy, or revoked conditional use of property for data center operations. local12.com
Wilmington The proposed ordinance would have set standards for noise, lighting, emissions, generator testing, water use, wastewater discharge, and heat generation. local12.com
Wilmington Ohio Supreme Court ruled on Friday that a proposed Wilmington ordinance regulating data centers cannot appear on the November 3, 2026 general election ballot because it included a provision allowing private citizens to sue data center operators. local12.com
Wilmington Referendum petition requires more than 1,100 valid signatures from registered voters in Wilmington to make the November ballot. wlwt.com
Wilmington Judge Jonathan Hein temporarily halted implementation of the ordinances until further review in October. wlwt.com
Wilmington Wilmington City Council passed emergency rezoning ordinance at September 3, 2026 meeting after federal judge forced compliance with open meetings law fox19.com
Wilmington Wilmington City Council approved two ordinances on emergency basis September 3 designating data centers as permitted use in light industrial zones and rezoning farmland to light industrial. wlwt.com
Wilmington Federal judge ruled that Wilmington violated open meeting laws regarding three ordinances for the Amazon data center project youtube.com
Wilmington A judge ruled that ordinances supporting the Wilmington data center were not legal wdtn.com
Wilmington A Clinton County judge ordered Wilmington to pause further movement on the Wilmington Amazon Data Services project until adequate time for public input is allowed wcpo.com

What happened

  1. (source date; the content gives no date of its own)

    Four separate Wilmington area referendums tied to rezoning land for another proposed data center project remain scheduled for the November ballot [2]

  2. · Status: rumored (source date; the content gives no date of its own)

    Wilmington City Council and Clinton County Port Authority submitted response to Amazon request for proposals for data centers in Ohio in 2024. [1]

The full Wilmington Data Center timeline, in order

6 corrections to this record

Every correction, with its reason
  1. · the speaker role of a statements row

    Speaker read again from the statement's source line, "Justice Jennifer Brunner, Ohio Supreme Court": the title in front of the name (Justice) is the role, not part of the name. The old and new text.

  2. · the speaker of a statements row

    Speaker read again from the statement's source line, "Justice Jennifer Brunner, Ohio Supreme Court": the title in front of the name (Justice) is the role, not part of the name. The old and new text.

  3. · the speaker role of a statements row

    Speaker read again from the statement's source line, "Justice Patrick Fischer, Ohio Supreme Court": the title in front of the name (Justice) is the role, not part of the name. The old and new text.

  4. · the speaker of a statements row

    Speaker read again from the statement's source line, "Justice Patrick Fischer, Ohio Supreme Court": the title in front of the name (Justice) is the role, not part of the name. The old and new text.

  5. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  6. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

The court's majority ruled cities cannot create new legal rights allowing residents to sue data center owners through a ballot initiative, citing limits on municipal power
Ohio Supreme Court · September 22, 2026 · paraphrased · WCPO 9 News local outlet
Three ordinances with defective public notice must be repealed, replaced, or re ratified before site plan approval
Jessica Sharp, Wilmington resident · July 14, 2026 · paraphrased · YouTube video

Every statement about data centers in Ohio, by speaker

8 more statements on this page

Citizens group opposing Wilmington data center

Citizens group opposed to proposed Amazon data center in Wilmington sought ballot initiative to establish local zoning standards for noise, lighting, emissions, generator testing, water use and discharge, and heat generation.

September 21, 2026, thecentersquare.com · thecentersquare.com local outlet · the record (Paraphrased; said in the source itself)

Justice, Ohio Supreme Court

Justice Jennifer Brunner concurred with the majority while noting sympathy for Fischer's arguments

September 20, 2026, WLWT · WLWT local outlet · the record (Paraphrased; said in the source itself)

Justice, Ohio Supreme Court

Justice Patrick Fischer dissented, arguing courts should make final determinations on referendum legality rather than election boards

September 20, 2026, WLWT · WLWT local outlet · the record (Paraphrased; said in the source itself)

Kim Georgeton, Ohio candidate

The proposed data center site is located half a mile from an elementary school

April 9, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Kim Georgeton, Ohio candidate

Data centers bring mostly temporary construction jobs and leave a skeleton crew once completed

April 9, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Kim Georgeton, Ohio candidate

Data centers emit loud buzzing noises, produce electromagnetic frequencies, and operate diesel generators continuously that cause unknown health effects

April 9, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Kim Georgeton, Ohio candidate

Data center facilities drain thousands of gallons of water per day from aquifers used by local farmers and families

April 9, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Kim Georgeton, Ohio candidate

Data centers consume high amounts of electricity, straining the grid and increasing utility bills for residents

April 9, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

The site

Where in Clinton County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 29 other published records in Ohio
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Wilmington, Clinton County, Ohio
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Wilmington Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Wilmington Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Wilmington Data Center stand today?

It is reported, as reported September 21, 2026. The newest entry, reported September 22, 2026: Four separate Wilmington area referendums tied to rezoning land for another proposed data center project remain scheduled for the November ballot [2].

What has Wilmington or Clinton County decided about it?

Wilmington: The proposed ordinance would have regulated noise levels, water use, chemical discharge, light pollution, generator testing, heat generation, and required long term decommissioning plans for data centers (reported September 22, 2026, source); and Wilmington: Ohio Supreme Court ruled 6-1 on September 19, 2026 that the Clinton County Board of Elections was justified in blocking a citizen referendum that would have created new rules for data centers addressing noise, water usage, and generators (September 19, 2026, source). 19 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Wilmington voters will not have say in data center - thecentersquare.com, thecentersquare.com, September 21, 2026, local outlet
  2. Ohio Supreme Court blocks Wilmington data center ballot measure; residents vow to try again - WCPO 9 News, WCPO 9 News, September 22, 2026, local outlet
  3. Citizens seek referenda over Wilmington data center ordinances - WLWT, WLWT, September 15, 2026, local outlet
  4. Wilmington residents take data center ballot fight to Ohio Supreme Court - Wilmington News Journal, Wilmington News Journal, September 4, 2026, local outlet
  5. Wilmington sued over ‘emergency’ rezoning for proposed data center - FOX19 | Cincinnati, FOX19 | Cincinnati, September 4, 2026, local outlet

5 sources on file.

Cite this record

Data Center Record, "Wilmington Data Center", https://datacenterrecord.org/projects/wilmington-data-center-oh, last verified September 22, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Wilmington Data Center", https://datacenterrecord.org/projects/wilmington-data-center-oh. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
wilmington-data-center-oh
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/oh/clinton-county/wilmington
Coordinates
39.4458, -83.8292
Location precision
county
Location source
County seat (Wilmington), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-09-22