Prologis proposed a data center campus in Trenton, Butler County, Ohio; on September 1, 2026, the Supreme Court of Ohio ordered the Trenton City Council to place a charter amendment referendum on a special election ballot. [2] A data center proposed in Trenton has spurred transparency concerns and citizen efforts to ban it, leading to Ohio Supreme Court intervention. [1]
How much power it needs, how much water it would use and who would use it have not been disclosed.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Trenton data center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | |||
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: proposed (content date)
A data center proposed in Trenton has spurred transparency concerns and citizen efforts to ban it, leading to Ohio Supreme Court intervention.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Ohio within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Flexential Cincinnati - CIN01/02 West Chester, Butler County | ~11 mi | Running | Flexential | 2 buildings |
| CyrusOne Lebanon CIN5 Lebanon, Warren County | ~14 mi | Running | CyrusOne | 1 building |
| Iron Mountain Data Center Ohio (OHS-1) Miamisburg, Montgomery County | ~15 mi | Running | Iron Mountain | 1 building |
| Encore Technologies Data Center Miamisburg, Montgomery County | ~15 mi | Running | Encore Technologies | 1 building |
| CyrusOne Cincinnati CIN2 Cincinnati, Hamilton County | ~26 mi | Running | CyrusOne | 1 building |
| H5 Data Centers Cincinnati Cincinnati, Hamilton County | ~27 mi | Running | H5 Data Centers | 2 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Prologis is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is proposed, since August 11, 2026. The newest entry, August 11, 2026: A data center proposed in Trenton has spurred transparency concerns and citizen efforts to ban it, leading to Ohio Supreme Court intervention. [1]
8 sources on file.
This site is in the RFC West (RFCW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Trenton data center. Last verified October 25, 2026. https://datacenterrecord.org/projects/trenton-data-center-oh. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Trenton data center
Data Center Record, "Trenton data center", https://datacenterrecord.org/projects/trenton-data-center-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.