Data Center Record.
Census GEOID: 18011 Location Precision: assessor parcel Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 2 reporting sources

● Being Built Recorded July 16, 2026 · 6 Buildings

Meta Lebanon data center

Street address LEAP Research and Innovation District, State Road 39, Lebanon, IN 46052, Boone County assessor parcel Exact, on the parcel [1] Meta: Our U.S. data center fleet

Overview, regulatory gates and specifications

Meta is constructing a 1,000 megawatt AI data center campus at the LEAP Research and Innovation District in Lebanon, Boone County, Indiana. [1] Filings on the record specify disclosed capacity of 1 GW (the developer's figure), 6 planned or operational buildings. [1] Meta's data center in Lebanon, Indiana plans a temporary off grid gas facility for power as the project advances. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
1 GW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand [1]
1 GW
the developer's figure

Equivalent to ~830,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 48% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
6 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: LEAP Research and Innovation District, State Road 39, Lebanon, IN 46052.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
1 GW developer figure Equivalent to the continuous electricity demand of about 830,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data, or about 0.5 times the 2,080 MW generating capacity of Hoover Dam. About 10 percent of New York City's summer peak demand in 2024.
[1] datacenters.atmeta.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
6 buildings operator page
[1] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Meta as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Meta Lebanon data center, capacity: 1,000 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 1,000 ÷ 10,245 = 0.1 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Meta

Public Record Speaker

DID Recorded statement at www.wfyi.org (June 9, 2026)
SAID The four to five week program will cover costs and requires no experience (June 9, 2026) wfyi.org (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

View all 6 statements on the record in Indiana →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Lebanon data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 1 GW the developer's figure [1] datacenters.atmeta.com
Site Footprint (Acres)
Data Hall Buildings 6 buildings operator page [1] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

February 11, 2026 Lebanon, IN Meta breaks ground on $10B data center campus at LEAP district Lebanon City Council 3 clips

WTHR report on Lebanon City Council and community proceedings in Lebanon, IN: Meta breaks ground on $10B data center campus at LEAP district (February 11, 2026).

  1. WTHR Broadcast Report Broadcast Report transcribed from local broadcast report
    "include 10 data center buildings. Meta is ready to call the LEAP district home to its $10 billion data center project. Here now, we're looking at something that's taking the nation and the country by storm, and that is how do we compete in the world of AI? Governor Mike Braun is calling the project a win win, saying it will bring 4,000 construction jobs and up to 300"
  2. WTHR Broadcast Report Broadcast Report transcribed from local broadcast report
    "jobs once online. Data centers are going to be important. They're going to lift wages in this state, and that's a goal of ours, too, to make sure that as we grow business, we're growing wages. Meta says it's committed to paying for all utility upgrades associated with the project, and electricity will be matched with 100% clean renewable energy. It will pay $20 million over 20 years to"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Residents have voiced concerns over how much water the LEAP district could use. Meta says this data center will be a closed loop water system. This means for the majority of the year, we're going to actually use zero water. So, we're minimizing water usage as much as possible, and for the water we do use, we're committed to restoring 100% of that here locally in the in the watershed. We are not doing anything that would harm the environment. You know, it's not"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: approved (content date)

    Meta's data center in Lebanon, Indiana plans a temporary off grid gas facility for power as the project advances.

    [1] datacenters.atmeta.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Indiana

Verified data center records in Indiana within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
DataOne Frankfort data center Frankfort, Clinton County 16 mi Proposed DataOne 4 buildings
Expedient Indianapolis Data Center (Carmel) Carmel, Hamilton County 18 mi Running Expedient 4 MW
DataBank Indianapolis data center Indianapolis, Marion County 26 mi Running DataBank 12 MW
Netrality Data Centers Indy Telcom Center Indianapolis, Marion County 26 mi Running Netrality Data Centers 12 MW
DC Blox Irvington data center campus Indianapolis, Marion County 26 mi Proposed DC Blox 60 MW
Metrobloks Indianapolis Data Center Indianapolis, Marion County 26 mi Proposed Metrobloks 45 MW

Blank cell: not disclosed by any source on file.

Common questions about Meta Lebanon data center

Answered directly from the verified filings and local actions on this page.

Who is building Meta Lebanon data center?

Meta is the developer. No construction contractor is named on the record yet.

How much power and water does Meta Lebanon data center say it needs?

Power: 1 GW (the developer's figure, datacenters.atmeta.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Meta Lebanon data center stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, July 16, 2026: Meta's data center in Lebanon, Indiana plans a temporary off grid gas facility for power as the project advances. [1]

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026

Reporting

  1. Meta breaks ground on $10 billion Lebanon data center for AI expansion - ppc.land (opens in a new tab), ppc.land, February 15, 2026, news outlet
  2. Meta data center in Lebanon plans temporary off-grid gas facility - IndyStar (opens in a new tab), IndyStar, July 16, 2026, local outlet

3 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Lebanon data center", https://datacenterrecord.org/projects/meta-lebanon-data-center-in, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Lebanon data center", https://datacenterrecord.org/projects/meta-lebanon-data-center-in. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
40.0522, -86.4717
How the location is known
Location from the county parcel record.
Location source
https://datacenters.atmeta.com/us-locations/
Coordinate source
Meta Lebanon LEAP District specification
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
1 GW, the developer's figure
Published
September 4, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows