Data Center Record.
Census GEOID: 18097 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and local source

● Running Announced October 27, 2026 · 2 Buildings · Netrality Data Centers

Netrality Data Centers Indy Telcom Center

Street address 733 West Henry Street, Indianapolis, IN 46225, Marion County verified address Exact, at the address [1] netrality.com

Overview, regulatory gates and specifications

Netrality Data Centers operates the Indy Telcom Center carrier hotel campus at 701 and 733 West Henry Street in downtown Indianapolis, Marion County, Indiana. [1] Filings on the record specify disclosed capacity of 12 MW (the developer's figure), 2 planned or operational buildings. [1] Verified facility status from Indiana IDEM permits, IURC dockets, municipal zoning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
12 MW
the developer's figure

Equivalent to ~9,960 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 733 West Henry Street, Indianapolis, IN 46225.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
12 MW developer figure Equivalent to the continuous electricity demand of about 9,960 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.1 percent of New York City's summer peak demand in 2024.
[1] netrality.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] netrality.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2015 (11 years)
Who leads it
Netrality Data Centers as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Netrality Data Centers Indy Telcom Center, capacity: 12 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 12 ÷ 10,245 = 0.0012 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Netrality Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Netrality Data Centers Indy Telcom Center.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 12 MW 12 MW the developer's figure [1] netrality.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [1] netrality.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Marion County and Indianapolis about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Indianapolis closed MDC passed 10 year property tax abatement and 15 year enhanced personal property tax abatement for Indianapolis data center insideindianabusiness.com (opens in a new tab)
Indianapolis closed Indianapolis approved construction of three data centers before agreeing to a moratorium through 2027 inputfortwayne.com (opens in a new tab)
September 22, 2025 Indianapolis, IN Indianapolis City County Council Franklin Township Google Data Center Rezoning Hearing Indianapolis City County Council 3 clips

Minutes before the Indianapolis City County Council was scheduled to vote on September 22, 2025, Google withdrew its rezoning petition for a 468 acre data center campus in Franklin Township after a majority of councilors signaled they would vote to reject the project following months of resident opposition.

  1. Michael Paul Hart, Councilor, Indianapolis City County Council Elected Official transcribed from local broadcast report
    "vote that was needed to secure this big project. Our Alex Almanzo was at tonight's meeting and got reaction from both sides. Just minutes before counselors were set to vote on the project, Google threw in the towel. What was supposed to be a billion dollars investment in Franklin Township disappeared in an instant. And I'd like to announce our intention to withdraw this proposal. Hundreds of residents cheering after Google dropped the proposal that would"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "have brought a nearly 470 acre data center to town. We're all so happy that this was the right choice tonight. The project, shrouded in secrecy for a majority of its lifetime, received sharp criticism from residents and both sides of the council. I think that's the reason why Google. Their petition today because I've seen how many people came out in 6 years that I've been on this council. I haven't seen both of these overflow rooms and that room full."
  3. WTHR Broadcast Report Broadcast Report transcribed from local broadcast report
    "a majority of the council but also flipped opinions. Franklin Township Schools was originally against the project, but after meeting with Google, the school's superintendent said it would bring. Tax relief stemming from funding shortfalls from Senate Bill 1. Though the school didn't share the exact figures that Google provided. Councilor Ron Gibson supported the project. He stands by what would have been a yes vote. A billion dollars is a lot to pass up and in terms"
September 8, 2025 Indianapolis, IN City County Council set to vote on data center proposed for Franklin Township Indianapolis City County Council 2 clips

WTHR report on Indianapolis City County Council and community proceedings in Indianapolis, IN: City County Council set to vote on data center proposed for Franklin Township (September 8, 2025).

  1. WTHR Broadcast Report Broadcast Report transcribed from local broadcast report
    "development meetings, council meetings. It seems the number of signs and the number of people saying no continues to grow. This all started earlier this year when a secretive project titled Project Flow entered the chat, which brought various community meetings. As Hooser started to learn what they called concerning details of the massive project, including the people behind it, they began to question how it'll actually benefit them. With today's"
  2. WTHR Broadcast Report Broadcast Report transcribed from local broadcast report
    "opposing this project. People saying no data center. You can see some of the signs saying data centers hurt vulnerable children. There's a sign that says, "Hey Google, where's my clean water?" A lot of different messages being displayed here. Now, as of this afternoon, District 9 councilor Keith Graves was the latest to publicly oppose the project. We've reached out to Google for comment, but they did not immediately respond to our request. Now,"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Google LLC Development Counsel & Metropolitan Development Commission Project Applicant & Planning Commission
Venue: Marion County Metropolitan Development Commission Hearing on Petition 2025 CZN 840
"Recommended approval of rezoning 468 acres of agricultural land in Franklin Township for a hyperscale Google data center campus and advanced the petition to the full Indianapolis City County Council."
Column B · Subsequent Recorded Position
Withdrawal of Rezoning Petition 2025 CZN 840 Minutes Before Indianapolis City County Council Vote
Marion County Rezoning Petition 2025 CZN 840 (Withdrawn Sept 22, 2025)
Agency or Venue: Indianapolis City County Council
"Minutes before the September 22, 2025 Indianapolis City County Council roll call vote, Google formally withdrew rezoning petition 2025 CZN 840 after Councilor Michael Paul Hart and a bipartisan council majority announced they had the votes to reject the campus."
WTHR 13 Indianapolis

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Indiana IDEM permits, IURC dockets, municipal zoning filings, or operator campus specifications.

    [1] netrality.com

Nearest data centers in Indiana

Verified data center records in Indiana within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
DataBank Indianapolis data center Indianapolis, Marion County Less than 1 mi Running DataBank 12 MW
DC Blox Irvington data center campus Indianapolis, Marion County Less than 1 mi Proposed DC Blox 60 MW
Metrobloks Indianapolis Data Center Indianapolis, Marion County 5 mi Proposed Metrobloks 45 MW
Lifeline Data Centers Indianapolis Eastgate Indianapolis, Marion County 7 mi Running Lifeline Data Centers 10 MW
Sabey Data Centers Indianapolis Campus (Decatur Township) Indianapolis, Marion County 10 mi Proposed Sabey Data Centers 250 MW
Google Franklin Township Data Center (Indianapolis) Indianapolis, Marion County 10 mi Stalled or cancelled Google 4 buildings

Blank cell: not disclosed by any source on file.

Common questions about Netrality Data Centers Indy Telcom Center

Answered directly from the verified filings and local actions on this page.

Who is building Netrality Data Centers Indy Telcom Center?

Netrality Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Netrality Data Centers Indy Telcom Center say it needs?

Power: 12 MW (the developer's figure, netrality.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Netrality Data Centers Indy Telcom Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Indianapolis or Marion County decided about it?

Indianapolis (rated closed): MDC passed 10 year property tax abatement and 15 year enhanced personal property tax abatement for Indianapolis data center (reported September 16, 2026, insideindianabusiness.com (opens in a new tab)); and Indianapolis: Indianapolis approved construction of three data centers before agreeing to a moratorium through 2027 (reported August 29, 2026, inputfortwayne.com (opens in a new tab)). 2 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Netrality Data Centers Indy Telcom Center Official Disclosure (opens in a new tab), Netrality Data Centers, news outlet

1 source on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Netrality Data Centers Indy Telcom Center", https://datacenterrecord.org/projects/netrality-indy-telcom-center-733-w-henry-indianapolis-in, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Netrality Data Centers Indy Telcom Center", https://datacenterrecord.org/projects/netrality-indy-telcom-center-733-w-henry-indianapolis-in. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
39.75988, -86.172275
How the location is known
Location from the site's street address.
Location source
https://netrality.com/locations/indianapolis/
Coordinate source
Netrality Indy Telcom Center (733 West Henry Street) specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
12 MW, the developer's figure
Rating of the county's rows
Closed
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · Netrality Data Centers Indy Telcom Center · 1 source, 1 entry, 2 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON