AZ · Maricopa County · Mesa
EdgeCore Mesa North Campus
waiting on permits Skeleton record, unreviewed
EdgeCore's Mesa North Campus in Mesa, Arizona, resized and approved by the city in March 2026.
Last verified
- Where it stands
- waiting on permits
- Who is building it
- EdgeCore
- How much power it needs
- Not disclosed
- What it is for
- Not disclosed
- Who it serves
- Not disclosed
- County
- Maricopa County
- First recorded
- September 8, 2026
What has been disclosed
| Figure | Value | Who says so | Source |
|---|---|---|---|
| How much power it needs | Not disclosed | ||
| How much water it would use | Not disclosed | ||
| How loud it would be | Not disclosed | ||
| Jobs once it runs | Not disclosed | ||
| Tax it would pay each year | Not disclosed |
Each figure says who gave it. The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Nothing here is estimated by the record. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
What it is for and whom it serves
No source on file says what this facility is for. The use is recorded as not disclosed until one does.
Tenants, tenancy and promises to the community: not disclosed.
What happened, and when
- March 16, 2026 (content date) waiting on permits
Generator testing restricted to 9 a.m. to 9 p.m. at EdgeCore facility bisnow.com, query feed
- March 16, 2026 (content date) waiting on permits
EdgeCore scaled back proposed data center from 2.1 million square feet to 1.2 million square feet bisnow.com, query feed
- March 15, 2026 (content date) waiting on permits
EdgeCore will build a 1.2 million-square-foot data center in southeast Mesa, cut from the original 2.1 million-square-foot plan themesatribune.com, query feed
- March 11, 2026 (content date) waiting on permits
EdgeCore exploring 750-acre site in Florence for future data center campus as part of 1,500-acre industrial technology park realestatedaily-news.com, query feed
- March 11, 2026 (content date) waiting on permits
Full buildout includes original 180,000 square foot data center and two additional buildings PH02 and PH03 under construction realestatedaily-news.com, query feed
- March 11, 2026 (content date) waiting on permits
EdgeCore acquired 43.87 acres in Mesa for $43.95 million in May 2025 realestatedaily-news.com, query feed
- March 11, 2026 (content date) waiting on permits
Original plan featured three separate buildings and 350,000 square foot SRP substation with 250 megawatts capacity realestatedaily-news.com, query feed
- March 11, 2026 (content date) waiting on permits
EdgeCore revised plan reduces expansion to two buildings totaling 1,236,960 square feet realestatedaily-news.com, query feed
- March 11, 2026 (content date) waiting on permits
EdgeCore originally secured approval in January 2024 for 2.1 million square foot expansion realestatedaily-news.com, query feed
- March 10, 2026 (content date) waiting on permits
EdgeCore data center campus in Mesa being scaled back bizjournals.com, query feed
- May 21, 2025 (content date) rumored
EdgeCore expands Mesa data center campus in May 2025 datacenterdynamics.com, query feed
Newest first. Earlier entries are never overwritten; each carries the source it rests on. The badge on each entry is the status the record moved to.
Sources
Reporting
- Denver's EdgeCore scales back Mesa data center campus, The Business Journals, March 10, 2026, query feed
- EdgeCore Gains Zoning Approval For Scaled-Back Mesa Data Center, Bisnow, March 16, 2026, query feed
- Re-sized data center in Mesa sails to approval, themesatribune.com, March 15, 2026, query feed
- EdgeCore expands Mesa data center campus in Arizona, Data Center Dynamics, May 21, 2025, query feed
- EdgeCore Returns With Revised Mesa Data Center Plan, Real Estate Daily News, March 11, 2026, query feed
5 sources on file. Primary documents are filings, minutes, dockets and official pages; reporting is how an event was found, and the document is what gets cited where one exists.
Cite this page
Data Center Record, "EdgeCore Mesa North Campus", https://datacenterrecord.org/projects/edgecore-mesa-north-campus-az. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- edgecore-mesa-north-campus-az
- Status value
- permitting
- Tier
- skeleton
- Place id
- us/az/maricopa-county/mesa
- Coordinates
- Not disclosed
- Location precision
- Not disclosed
- Location source
- Not disclosed
- Coordinate source
- Not disclosed
- Use type values
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Published
- 2026-09-08
- Last verified
- 2026-09-08