Verrus Oakline Mill Creek Data Center

Street address 5650 Mill Creek Dr SE, Salem, OR 97317, Marion County assessor parcel Exact, on the parcel [13] cityofsalem.net

Overview, regulatory gates and specifications

Verrus proposes a data center campus of three buildings and a substation on about 75 acres at the Mill Creek Corporate Center in southeast Salem, with a land use application filed on July 31, 2026 and a city moratorium initiated on August 3, 2026. [15] Verrus $5.1 billion data center project at Mill Creek Corporate Center prohibited from construction phase as long as moratorium is in effect [18]

1. Land & Parcel
75 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [22]
75 acres
the developer's figure

3 planned or operational data hall buildings.

Location: 5650 Mill Creek Dr SE, Salem, OR 97317.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
75 acres developer figure
[22] salemreporter.com
Buildings
3 buildings operator page
[13] cityofsalem.net
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Verrus as stated by the source
[22] salemreporter.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Dan Atchison

Salem city attorney

DID Recorded statement at Salem Reporter (September 21, 2026) [17]
SAID The city could extend the moratorium by six months if approved. (September 21, 2026) [17]

Salem city officials

Public Record Speaker

DID Recorded statement at KPTV (September 16, 2026)
SAID Town hall focused on hearing input on data center water usage, noise, job creation and electricity consumption (September 16, 2026) kptv.com (opens in a new tab)

Verrus

Public Record Speaker

DID Recorded statement at salemreporter.com (September 9, 2026) [16]
SAID Verrus hired a lobbyist, Drew Hagedorn, registered September 4, 2026, for data center development, energy and utilities, land use and permitting (September 9, 2026) [16]

Salem city planning staff

Public Record Speaker

DID Recorded statement at Salem Reporter (August 28, 2026) [30]
SAID Verrus, the Google backed company, must resubmit application with noise study, separate application for each development site, and archaeological review (August 28, 2026) [30]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Verrus
UTILITIES
Electric utility: Not disclosed

View all 10 statements on the record in Oregon →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Verrus Oakline Mill Creek Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 75 acres 75 acres the developer's figure [22] salemreporter.com
Data Hall Buildings 3 buildings developer [13] cityofsalem.net
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

July 28, 2026 Salem, OR 'Signing the city's death warrant': Salem residents push back against data center at contentious cou Salem City Council 2 clips

KOIN 6 report on Salem City Council and community proceedings in Salem, OR: 'Signing the city's death warrant': Salem residents push back against data center at contentious cou (July 28, 2026).

  1. KOIN 6 Broadcast Report Broadcast Report transcribed from local broadcast report
    "Data center worth billions of dollars that a lot of people here in Salem say no because it's really the case. The 5th. People that you're standing in front of have just been kept in the dark and you've been complicit. Shame on you. Shame on you. Salem is constantly at risk of losing. Our parks are 50 plus centre and our library this year, Salem keizer public schools announced 23 million dollars in cuts. If you allow this contract to go through, you"
  2. KOIN 6 Broadcast Report Broadcast Report transcribed from local broadcast report
    "Residents worried about what a data center could mean using large amounts of water and electricity tearing up former farmland. The city says it did end a nondisclosure agreement with verus earlier this month. After word of it leaked out council the process last night discussing the project which could break ground next year. But the idea of a secret agreement didn't sit well that the NDA was in effect for so long. Tells me that all parties"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Moratorium (source date; the content gives no date of its own)

    Verrus $5.1 billion data center project at Mill Creek Corporate Center prohibited from construction phase as long as moratorium is in effect

    [18] salemreporter.com

  2. Filing (source date; the content gives no date of its own)

    Verrus application was deemed incomplete on August 28, 2026.

    [17] salemreporter.com

  3. Filing (source date; the content gives no date of its own)

    Verrus submitted a data center application for the Mill Creek Corporate Center on July 31, 2026, for a $5.1 billion project.

    [17] salemreporter.com

  4. (source date; the content gives no date of its own)

    Verrus is building a $5.1 billion data center in Salem's Mill Creek Corporate Center

    [16] salemreporter.com

  5. Filing (source date; the content gives no date of its own)

    Verrus CEO Nelson Abramson filed land use application for data center with two 600,000 square foot buildings in late July 2026

    [19] statesmanjournal.com

  6. Filing (source date; the content gives no date of its own)

    Verrus submitted a land use application for the first phase of a $5.1 billion AI data center at Mill Creek Corporate Center

    [21] salemreporter.com

  7. Filing (source date; the content gives no date of its own)

    Application for roughly 100 acre AI data center in Salem Mill Creek Corporate Center deemed incomplete by city planning staff

    [30] salemreporter.com

  8. (content date)

    City officials deemed the Verrus application incomplete, citing a missing noise study and archaeological review.

    [30] salemreporter.com

6 earlier entries
  1. (source date; the content gives no date of its own)

    SEDCOR selected Verrus over multiple other prospective companies for a data center at Mill Creek Corporate Center despite Verrus having never built a data center before

    [33] salemreporter.com

  2. (content date)

    Salem City Council voted unanimously at a special meeting to initiate a moratorium on new data center applications.

    [28] salemreporter.com

  3. · waiting on permits (content date)

    Alderstone LLC filed a land use application with the City of Salem for two data center buildings on three lots at the Mill Creek Corporate Center.

    [27] salembusinessjournal.org

  4. (content date)

    Governor Tina Kotek directed the Department of Administrative Services to terminate the sale of 32 acres of state land at Mill Creek to Verrus.

    [25] katu.com

  5. (content date)

    Residents filled Salem City Council chambers for about five hours of public comment on the proposal.

    [24] kptv.com

  6. · proposed (content date)

    The City of Salem disclosed a proposed Verrus data center campus at the Mill Creek Corporate Center after being released from a nondisclosure agreement.

    [22] salemreporter.com

Every event in order

15 corrections to this record

Every correction, with its reason
  1. · Timeline entry

    Normalize vote tallies ('X to Y') and dollar figures ('$X million/billion') to house style.

  2. · Timeline entry

    Normalize vote tallies ('X to Y') and dollar figures ('$X million/billion') to house style.

  3. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  4. · Project summary

    the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  9. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  10. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  11. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  12. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  13. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  14. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  15. · Source link

    The source was a google.com goto redirect, which names no publisher; it now cites the page the redirect leads to. The fact and its date did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Oregon

Verified data center records in Oregon within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Digital Fortress Portland (PTL2 Beaverton) Beaverton, Washington County 42 mi Running Digital Fortress 1 building
Crane Data Center Forest Grove Forest Grove, Washington County 44 mi Running Principal Asset Management 1 building
Beaver Ventures OR1 Data Center (PDX11 / PDX12) Hillsboro, Washington County ~44 mi Proposed Beaver Ventures LLC
Showers Development Hillsboro Data Center (Croeni Avenue) Hillsboro, Washington County ~44 mi Proposed Showers Development LLC
STACK Infrastructure Hillsboro POR01 (Brookwood Parkway) Hillsboro, Washington County ~44 mi Proposed STACK Infrastructure
Aligned PDX-01 Hillsboro, Washington County 46 mi Running Aligned Data Centers 72 MW

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Permanent jobs

1 figure, 1 source
Show each source's words
  • 75 jobs, Salem Reporter: Proposed Salem data center (Verrus project) expected to employ 75 people, according to public comment discussion

Common questions about Verrus Oakline Mill Creek Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Verrus Oakline Mill Creek Data Center?

Verrus is the developer, salemreporter.com (opens in a new tab). No construction contractor is named on the record yet.

Who will use Verrus Oakline Mill Creek Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Verrus Oakline Mill Creek Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Verrus Oakline Mill Creek Data Center stand today?
What is still unknown about Verrus Oakline Mill Creek Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. As Oregon cities buck data centers, a committee is set to propose statewide regulations - Oregon Public Broadcasting - OPB (opens in a new tab), OPB, August 4, 2026, local outlet
  2. 5 takeaways ahead of Salem City Council’s data center moratorium meeting - Salem Reporter (opens in a new tab), Salem Reporter, August 3, 2026, local outlet
  3. Verrus must get archeological clearance to proceed with Mill Creek data center - Salem Reporter (opens in a new tab), Salem Reporter, August 27, 2026, local outlet
  4. Verrus plans three-building data center campus outside Portland, Oregon - Data Center Dynamics (opens in a new tab), Data Center Dynamics, July 15, 2026, news outlet
  5. A small Central Oregon town shoots down data center development - Oregon Public Broadcasting - OPB (opens in a new tab), Oregon Public Broadcasting - OPB, May 28, 2026, local outlet
  6. Salem residents rage against proposed data center and city NDA that kept plans secret - OregonLive.com (opens in a new tab), OregonLive.com, July 30, 2026, local outlet
  7. Data company advances Salem plan, replacing state land and beating moratorium - Salem Reporter (opens in a new tab), Salem Reporter, August 1, 2026, local outlet
  8. Hillsboro residents push back on ‘data center explosion’ - Oregon Public Broadcasting - OPB (opens in a new tab), Oregon Public Broadcasting - OPB, June 3, 2026, local outlet
  9. Verrus attempts to push on with data center campus in Salem, Oregon - Data Center Dynamics (opens in a new tab), Data Center Dynamics, August 4, 2026, news outlet
  10. Hillsboro approves data center moratorium - Oregon Public Broadcasting - OPB (opens in a new tab), Oregon Public Broadcasting - OPB, July 27, 2026, local outlet
  11. Salem data center project likely to proceed - salemreporter.com (opens in a new tab), salemreporter.com, July 16, 2026, local outlet
  12. While Salem project is uncertain, Verrus advances data center in Michigan - Salem Reporter (opens in a new tab), Salem Reporter, July 31, 2026, local outlet
28 more sources
  1. City of Salem Planning Division: Site Plan Review Case SPR-ADJ-UGA26-10 (5650 Mill Creek Dr SE) (opens in a new tab), City of Salem, news outlet
  2. Verrus data center filing sidesteps land sale block and looming moratorium (opens in a new tab), W.Media, August 3, 2026, trade press
  3. Oregon Gov. Kotek orders state to cancel land sale for Salem data center - OregonLive.com (opens in a new tab), OregonLive.com, July 30, 2026, local outlet
  4. Verrus hires lobbyist as Kotek slams breaks on data center development on public lands - salemreporter.com (opens in a new tab), salemreporter.com, September 9, 2026, local outlet
  5. Salem City Council to hold public hearing on data center moratorium tonight at 6 p.m. (opens in a new tab), Salem Reporter, September 21, 2026, local outlet
  6. City attorney: Salem data center moratorium means Verrus can’t build until it expires (opens in a new tab), Salem Reporter, September 22, 2026, local outlet
  7. Salem wants your thoughts on data centers. How to participate - Statesman Journal (opens in a new tab), Statesman Journal (via Google News), September 8, 2026, local outlet
  8. Salem City Council votes in favor on moratorium on AI data centers - statesmanjournal.com (opens in a new tab), Statesman Journal (via Google News), August 4, 2026, local outlet
  9. Newly formed data center task force meets Wednesday for its first public meeting - Salem Reporter (opens in a new tab), Salem Reporter, September 2, 2026, local outlet
  10. Salem discloses proposed Mill Creek data center project after city released from NDA (opens in a new tab), Salem Reporter, July 14, 2026, local outlet
  11. Massive $5.1B data center proposed for Salem draws praise and pushback (opens in a new tab), KATU, July 14, 2026, local outlet
  12. Salem residents fill city council chambers for data center testimony (opens in a new tab), KPTV, July 28, 2026, local outlet
  13. Gov. Tina Kotek orders Oregon to withdraw land sale for Salem area data center (opens in a new tab), KATU, July 30, 2026, local outlet
  14. Kotek blocks sale of 32 acres of Mill Creek Corporate Center land for Verrus data center (opens in a new tab), Salem Reporter, July 30, 2026, local outlet
  15. Salem City Council initiates data center moratorium as Oakline filing lands (opens in a new tab), Salem Business Journal, August 3, 2026, news outlet
  16. Salem City Council convenes special meeting on data center moratorium (opens in a new tab), Salem Reporter, August 3, 2026, local outlet
  17. Think Out Loud: proposed Salem data center (opens in a new tab), OPB, August 11, 2026, local outlet
  18. Verrus application for Mill Creek data center deemed incomplete by city officials (opens in a new tab), Salem Reporter, August 28, 2026, local outlet
  19. Contract shows state agreed to sell 32 acres to Verrus for $6.7 million (opens in a new tab), Salem Reporter, September 3, 2026, local outlet
  20. Oregon Gov. Kotek stops state from selling land for Salem data center - Oregon Public Broadcasting - OPB (opens in a new tab), OPB, July 30, 2026, local outlet
  21. SEDCOR chose Verrus over multiple companies eyeing Salem for data center buildouts - Salem Reporter (opens in a new tab), Salem Reporter, August 14, 2026, local outlet
  22. Verrus surprised, disappointed by Kotek's move to block sale of 32-acres of land at Mill Creek Corporate Center - salemreporter.com (opens in a new tab), salemreporter.com, July 30, 2026, local outlet
  23. Gov. Kotek orders state to cancel land sale for proposed $5B Salem data center - KGW (opens in a new tab), KGW, July 30, 2026, local outlet
  24. Hostility to data centers boils over at Oregon city council meeting - Seattle Red (opens in a new tab), Seattle Red, July 30, 2026, news outlet
  25. Who is Verrus, the company behind Salem’s proposed data center? - Salem Reporter (opens in a new tab), Salem Reporter, August 19, 2026, local outlet
  26. Testimony fiercely against proposed Salem data center at council meeting - Statesman Journal (opens in a new tab), Statesman Journal, July 28, 2026, local outlet
  27. 75-acre data center proposed in Salem - KPTV (opens in a new tab), KPTV, July 15, 2026, local outlet
  28. Salem’s proposed data center faces months of review. Here’s how you can weigh in - salemreporter.com (opens in a new tab), salemreporter.com, July 23, 2026, local outlet

40 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Verrus Oakline Mill Creek Data Center", https://datacenterrecord.org/projects/oakline-mill-creek-salem-or, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Verrus Oakline Mill Creek Data Center", https://datacenterrecord.org/projects/oakline-mill-creek-salem-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
44.885124, -122.964954
How the location is known
Location from the county parcel record.
Location source
https://www.cityofsalem.net/business/land-use-zoning/current-land-use-decisions
Coordinate source
City of Salem Site Plan Review Case SPR-ADJ-UGA26-10 (Mill Creek Corporate Center)
Location last verified
September 4, 2026
How acreage was disclosed
the developer's figure
Published
September 4, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Verrus Oakline Mill Creek Data Center · 40 sources, 14 entries · basis and source tier on every row · verified October 26, 2026

Download CSV JSON