Data Center Record.

Not yet verified Built from one source

Crane Data Center

Forest Grove, Washington County, ORCensus GEOID 41067

Undisclosed in public filings
Power, Land, Buildings, Water

The EPA's facility registry lists Crane Data Center at 3993 Heather ST, Forest Grove, OR 97116 in Forest Grove, Oregon, with a water permit. It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Not yet verified, ringed
  • data center
  • Smaller pins: 17 other published records in Oregon
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who leads it, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind it A land record, a zoning application or a company's own announcement.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Washington County and Forest Grove about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Hillsboro restrictive Hillsboro enacted a 120 day moratorium on new data center and battery storage applications in late July 2026 kptv.com (opens in a new tab)
Hillsboro restrictive Hillsboro City Council enacted a 120 day moratorium on new data center developments. kptv.com (opens in a new tab)
Hillsboro restrictive Hillsboro pushing back against data center expansion katu.com (opens in a new tab)
Hillsboro restrictive Hillsboro put 120 day moratorium on data center projects at end of July 2026 datacenterdynamics.com (opens in a new tab)
Washington County Washington County Commissioner Nafisa Fai announced her intention to bring forward a proposal that would temporarily pause new data center and AI computing facility development and permitting countywide katu.com (opens in a new tab)
Hillsboro restrictive Hillsboro's 120 day moratorium on data centers went into effect katu.com (opens in a new tab)
6 earlier decisions on the county's rows
DateWhoDecisionSource
Hillsboro restrictive Hillsboro City Council unanimously approved a 120 day moratorium on new data center and battery energy storage system proposals, effective July 27, 2026, through at least November 24, 2026. hillsboronewstimes.com (opens in a new tab)
Hillsboro restrictive Hillsboro City Council voted for a moratorium on all new data center construction. klcc.org (opens in a new tab)
Hillsboro restrictive Hillsboro City Council adopted a 120 day moratorium on accepting new data center applications katu.com (opens in a new tab)
Hillsboro restrictive Hillsboro City Council unanimously adopted 120 day moratorium on data center and battery energy storage land use applications on July 28 2026 opb.org (opens in a new tab)
Hillsboro restrictive Hillsboro, Oregon also approved its own pause at a last minute July 27 meeting yahoo.com (opens in a new tab)
Hillsboro restrictive A legal challenge has been filed to stop Hillsboro, Oregon data center deals hillsboroherald.com (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA water permit.

The site map is at the top of the page.

Where
3993 Heather ST, Forest Grove, OR 97116, Forest Grove, Washington County, Oregon [1] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Crane Data Center
LAT 45.51397 / LON -123.07412 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Crane Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Crane Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Crane Data Center stand today?

It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record. No dated entry is on the record yet.

What has Forest Grove or Washington County decided about it?

Hillsboro (rated restrictive): Hillsboro enacted a 120 day moratorium on new data center and battery storage applications in late July 2026 (reported September 15, 2026, kptv.com (opens in a new tab)); and Hillsboro: Hillsboro City Council enacted a 120 day moratorium on new data center developments (reported September 14, 2026, kptv.com (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Crane Data Center (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Crane Data Center", https://datacenterrecord.org/projects/crane-data-center-forest-grove-or, last verified October 20, 2026. CSV · JSON
Cite this page

Data Center Record, "Crane Data Center", https://datacenterrecord.org/projects/crane-data-center-forest-grove-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Not yet verified
Tier
built from one source
Tags
Built from one source
Coordinates
45.51397, -123.07412
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO facility record 110071995316: the registry placed its point by address matching house number, accurate to 50 m
Coordinate source
epa frs point
Location source number
[1]
Location last verified
October 20, 2026
EPA registry id
110071995316
Rating of the county's rows
Restrictive
Published
October 20, 2026
Last verified
October 20, 2026
Undisclosed in public filings
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Crane Data Center · 1 source, 0 entries, 12 decisions nearby · basis and source tier on every row · verified October 20, 2026

Download CSV JSON