QTS officials offered input on a hyperscale data center project planned for Clinton, Iowa, while Clinton residents requested steep restrictions on the facility. It is reported, as reported August 29, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | QTS | as stated by the source | September 17, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
(source date; the content gives no date of its own)
QTS is currently constructing a data center on 612 acres in Cedar Rapids at the Big Cedar Industrial Center [2]
· Status: rumored (source date; the content gives no date of its own)
QTS proposes a 1,100 acre hyperscale data center estimated to cost 10 billion dollars between Clinton Municipal Airport, Valley Oaks Golf Course and Branden Hills residential area [2]
The full QTS Clinton Data Center timeline, in order
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
Every correction on the record is on the corrections page.
NO Data Center Concert organized by Robbie Bahr held in protest on September 13 from 2 to 10 p.m. at Clinton, Iowa Bandshell
Clintonians Against Data Centers raised concerns about displacement of wildlife, local job creation, tax abatement, water usage, and effects on wildlife at the proposed QTS Clinton data center
Every statement about data centers in Iowa, by speaker
Robbie Bahr
Free concert and peaceful protest scheduled for Sunday, September 13 from 2 to 10 p.m. at Riverview Bandshell in opposition to data center
former concert promoter and Clinton resident
Robbie Bahr called for a moratorium of roughly 500 to 600 days to allow additional study and public discussion
Where in Clinton County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
QTS is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is reported, as reported August 29, 2026. The newest entry, reported August 29, 2026: QTS is currently constructing a data center on 612 acres in Cedar Rapids at the Big Cedar Industrial Center [2].
No decision by Clinton or Clinton County about data centers is on the record. The Clinton County page and the Iowa scorecard list every rated row the day a person publishes one.
4 sources on file.
Data Center Record, "QTS Clinton Data Center", https://datacenterrecord.org/projects/qts-clinton-data-center-ia, last verified September 17, 2026.
Data Center Record, "QTS Clinton Data Center", https://datacenterrecord.org/projects/qts-clinton-data-center-ia. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.