● Proposed Campus Reported August 29, 2026 · 2 Buildings

QTS Clinton Data Center Proposal

Street address Lincolnway Industrial Rail and Air Park, Clinton, IA 52732, Clinton County verified address Exact, at the address [2] wvik.org

Overview, regulatory gates and specifications

QTS Data Centers proposed a data center campus at the Lincolnway Industrial Rail and Air Park in Clinton, Clinton County, Iowa. [2] Filings on the record specify 2 planned or operational buildings. [1] QTS officials offered input on a hyperscale data center project planned for Clinton, Iowa, while Clinton residents requested steep restrictions on the facility. [2]

Verified Site & Permit Summary
Verified address
Lincolnway Industrial Rail and Air Park, Clinton, IA 52732, Clinton County verified address
Operator / developer
QTS Data Centers
Permit / registry ID
WVIK, Quad Cities NPR on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] q.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
QTS Data Centers as stated by the source
Official project website
q.com (opens in a new tab) verified October 28, 2026
q.com (opens in a new tab)
Archived promotional websites
q.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Robbie B.

Public Record Speaker

DID Recorded statement at quadcities.com (September 10, 2026)
SAID NO Data Center Concert organized by Robbie B. held in protest on September 13 from 2 to 10 p.m. at Clinton, Iowa Bandshell (September 10, 2026) quadcities.com (opens in a new tab)

Clintonians Against Data Centers

Public Record Speaker

DID Recorded statement at WVIK, Quad Cities NPR (August 29, 2026) [2]
SAID Clintonians Against Data Centers raised concerns about displacement of wildlife, local job creation, tax abatement, water usage, and effects on wildlife at the proposed QTS Clinton data center (August 29, 2026) [2]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: QTS Data Centers
UTILITIES
Electric utility: Not disclosed

View all 4 statements on the record in Iowa →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for QTS Clinton Data Center Proposal.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings agency filing [1] q.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    QTS officials offered input on a hyperscale data center project planned for Clinton, Iowa, while Clinton residents requested steep restrictions on the facility.

    [2] wvik.org

  2. (source date; the content gives no date of its own)

    QTS is currently constructing a data center on 612 acres in Cedar Rapids at the Big Cedar Industrial Center

    [2] wvik.org

  3. · Status: proposed (source date; the content gives no date of its own)

    QTS proposes a 1,100 acre hyperscale data center estimated to cost $10 billion between Clinton Municipal Airport, Valley Oaks Golf Course and Branden Hills residential area

    [2] wvik.org

Every event in order

3 corrections to this record

Every correction, with its reason
  1. · Timeline entry

    Normalize vote tallies ('X to Y') and dollar figures ('$X million/billion') to house style.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Iowa

Verified data center records in Iowa within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Meta Davenport Data Center Campus Davenport, Scott County 21 mi Being built Meta 200 MW
Bluebird Network Quad Cities Data Center (Bettendorf) Bettendorf, Scott County 22 mi Running Bluebird Network 4 MW

Blank cell: not disclosed by any source on file.

Common questions about QTS Clinton Data Center Proposal

Answered directly from the verified filings and local actions on this page.

Who is building QTS Clinton Data Center Proposal?

QTS Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does QTS Clinton Data Center Proposal say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does QTS Clinton Data Center Proposal stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. QTS Data Centers: All locations (opens in a new tab), QTS Data Centers, September 14, 2026

Reporting

  1. Clinton data center ordinance to be discussed at Tuesday meeting - WVIK, Quad Cities NPR (opens in a new tab), WVIK, Quad Cities NPR, August 29, 2026, local outlet
  2. QTS officials offer input on Clinton data center plans - WVIK, Quad Cities NPR (opens in a new tab), WVIK, Quad Cities NPR, September 3, 2026, local outlet
  3. Clinton residents request steep restrictions in the face of QTS hyperscale data center - Iowa Public Radio (opens in a new tab), Iowa Public Radio, July 16, 2026, local outlet

4 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "QTS Clinton Data Center Proposal", https://datacenterrecord.org/projects/qts-clinton-data-center-ia, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "QTS Clinton Data Center Proposal", https://datacenterrecord.org/projects/qts-clinton-data-center-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
41.8245, -90.2862
How the location is known
Location from the site's street address.
Location source
https://www.cityofclintoniowa.gov/
Coordinate source
City of Clinton industrial park parcel
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows