Meta Davenport Data Center Campus

Davenport, Scott County, IADeveloper: MetaCensus GEOID 19163

Stage
Being built
Power
200 MW
the developer's figure
Buildings
3 buildings
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

Meta is constructing an $800 million, 3 building hyperscale data center campus on a 328 acre site at the Eastern Iowa Industrial Center in Davenport, Scott County, Iowa. It is being built; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Being built, ringed
  • data center
  • Smaller pins: 25 other published records in Iowa
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
3 buildings operator page, verified October 27, 2026
Power it would draw
200 MW the developer's figure About 2 percent of New York City's summer peak demand in 2024.
Who leads it
Meta as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Meta Davenport Data Center Campus, capacity: 200 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 200 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 200 MW the developer's figure datacenters.atmeta.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Meta as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 3 buildings operator page, verified October 27, 2026 datacenters.atmeta.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: proposed (content date)

    As of February 2026, no ground has been broken on Meta's proposed data center in Davenport, Iowa.

    [1] qctimes.com

The full Meta Davenport Data Center Campus timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
Enterprise Way and Research Parkway, Davenport, IA 52806, Davenport, Scott County, Iowa [source] (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Meta Davenport Data Center Campus
LAT 41.60850 / LON -90.58420 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Meta Davenport Data Center Campus?

The record has 2 measures of its size: 200 MW (the developer's figure, datacenters.atmeta.com (opens in a new tab)) and 3 buildings (operator page, verified October 27, 2026, datacenters.atmeta.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Meta Davenport Data Center Campus?

Meta is the developer. No construction contractor is named on the record yet.

How much power and water does Meta Davenport Data Center Campus say it needs?

Power: 200 MW (the developer's figure, datacenters.atmeta.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Meta Davenport Data Center Campus stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, February 23, 2026: As of February 2026, no ground has been broken on Meta's proposed data center in Davenport, Iowa. [1]

What has Davenport or Scott County decided about it?

No decision by Davenport or Scott County about data centers is on the record. The Scott County page and the Iowa scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Still no ground broken for Meta data center in Davenport; Here's what we know - The Quad-City Times (opens in a new tab), The Quad-City Times, February 23, 2026, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Davenport Data Center Campus", https://datacenterrecord.org/projects/meta-davenport-data-center-ia, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Davenport Data Center Campus", https://datacenterrecord.org/projects/meta-davenport-data-center-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
41.6085, -90.5842
How the location is known
Location from the site's street address.
Location source
https://datacenters.atmeta.com/
Coordinate source
IEDA Board approval and Eastern Iowa Industrial Center parcel
How capacity was disclosed
the developer's figure
Capacity, if disclosed
200 MW, the developer's figure
Published
October 2, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Meta Davenport Data Center Campus · 1 source, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON