Data Center Record.
Census GEOID: 19113 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 6 reporting sources

● Being Built Reported October 22, 2025 · 6 Buildings

QTS Cedar Rapids Data Center Campus

Street address 76th Avenue SW and Big Cedar Way, Cedar Rapids, IA 52404, Linn County verified address Exact, at the address [2] indianola-ia.com

Overview, regulatory gates and specifications

QTS Data Centers is constructing a $750 million, 6 building hyperscale data center campus at the Big Cedar Industrial Center in Cedar Rapids, Linn County, Iowa. [2] Filings on the record specify disclosed capacity of 300 MW (the developer's figure). [2] QTS Data Centers lists QTS Cedar Rapids at Cedar Rapids, Iowa on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
300 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand [2]
300 MW
the developer's figure

Equivalent to ~249,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 14% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
6 buildings
agency filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 76th Avenue SW and Big Cedar Way, Cedar Rapids, IA 52404.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
300 MW developer figure Equivalent to the continuous electricity demand of about 249,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 3 percent of New York City's summer peak demand in 2024.
[2] indianola-ia.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
6 buildings operator page
[1] q.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
QTS Data Centers as stated by the source
Official project website
q.com (opens in a new tab) verified October 28, 2026
q.com (opens in a new tab)
Archived promotional websites
q.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. QTS Cedar Rapids Data Center Campus, capacity: 300 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 300 ÷ 10,245 = 0.03 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: QTS Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for QTS Cedar Rapids Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 300 MW the developer's figure [2] indianola-ia.com
Site Footprint (Acres)
Data Hall Buildings 6 buildings agency filing [1] q.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 20, 2026 Cedar Rapids, IA Cedar Rapids Linn County Solid Waste Agency Data Center Construction Waste Policy Cedar Rapids Linn County Solid Waste Agency Board 1 clip

In September 2026, the Cedar Rapids Linn County Solid Waste Agency enacted mandatory construction waste diversion rules after massive volumes of recyclable materials from Google and QTS hyperscale data center builds in southwest Cedar Rapids strained county landfill capacity.

  1. Cedar Rapids Linn County Solid Waste Agency Official Board & Planning Staff transcribed from local broadcast report
    "that increase, the biggest change was waste coming from data center construction. Load after load included recyclable things like clean wood pallets and scrap metal, but cardboard was the biggest concern. Cardboard has been banned from our landfill since 1999. And the way that the ban is written is if the load contains cardboard, their tipping fee doubles. And so, they were getting fined for it, but it wasn't slowing it down. So, we really realized we had to take another step."
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Southwest Cedar Rapids Hyperscale Data Center Developers Hyperscale Operators
Venue: Cedar Rapids Economic Development & Sustainability Briefings
"Promised zero waste construction practices and high environmental diversion rates for the 1.3 billion dollar southwest Cedar Rapids hyperscale campuses."
Column B · Primary Government Record
Cedar Rapids Linn County Solid Waste Agency Mandatory Construction Waste Diversion Policy
Linn County Solid Waste Agency Landfill Policy (Sept 20, 2026)
Agency or Venue: Cedar Rapids Linn County Solid Waste Agency
"In September 2026, the Cedar Rapids Linn County Solid Waste Agency enacted mandatory landfill bans on recyclable construction materials after inspecting massive volumes of unrecycled wood, metal, and cardboard dumped from data center construction sites."
Iowas News Now CBS2

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Eastern Iowa Airport investigating QTS drones in airspace

    [6] thegazette.com

  2. (source date; the content gives no date of its own)

    Cedar Rapids airport investigates drones in flight path

    [4] kwwl.com

  3. (source date; the content gives no date of its own)

    U.S. Energy Secretary visited QTS data center in Cedar Rapids

    [3] kwwl.com

  4. (source date; the content gives no date of its own)

    Scope of QTS data project in Cedar Rapids continuing to grow

    [5] corridorbusiness.com

  5. · Status: being built (source date; the content gives no date of its own)

    QTS reached topping out milestone at Cedar Rapids data center

    [7] cbs2iowa.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    QTS Data Centers lists QTS Cedar Rapids at Cedar Rapids, Iowa on its own page of data center locations, read September 14, 2026.

    [1] q.com

Nearest data centers in Iowa

Verified data center records in Iowa within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Cedar Rapids Data Center Cedar Rapids, Linn County 1 mi Being built Google 3 buildings
Oppidan Connect Cedar Rapids Data Center (CLOP Cedar Rapids) Cedar Rapids, Linn County 1 mi Proposed Oppidan Investment Company 2 buildings
Enseva Cedar Rapids Data Center (Hiawatha) Hiawatha, Linn County 10 mi Running Enseva 8 MW

Blank cell: not disclosed by any source on file.

Common questions about QTS Cedar Rapids Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building QTS Cedar Rapids Data Center Campus?

QTS Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does QTS Cedar Rapids Data Center Campus say it needs?

Power: 300 MW (the developer's figure, indianola-ia.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does QTS Cedar Rapids Data Center Campus stand today?

It is being built, as reported October 22, 2025. The newest entry, reported June 4, 2026: Eastern Iowa Airport investigating QTS drones in airspace [6].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. QTS Data Centers: All locations (opens in a new tab), QTS Data Centers, September 14, 2026

Reporting

  1. TOM PHILLIPS: Leading the Future: Why Iowa should base data center policy on facts, not fear or rumors - Indianola Independent Advocate (opens in a new tab), Indianola Independent Advocate, July 13, 2026, news outlet
  2. U.S. Energy Secretary visits QTS data center in Cedar Rapids - KWWL (opens in a new tab), KWWL, April 24, 2026, local outlet
  3. Cedar Rapids airport investigates drones in flight path - KWWL (opens in a new tab), KWWL, June 3, 2026, local outlet
  4. Scope of QTS data project in Cedar Rapids continuing to grow - corridorbusiness.com (opens in a new tab), corridorbusiness.com, December 2, 2025, local outlet
  5. Eastern Iowa Airport investigating QTS drones in airspace - thegazette.com (opens in a new tab), thegazette.com, June 4, 2026, local outlet
  6. QTS celebrates topping out milestone at Cedar Rapids data center - KGAN (opens in a new tab), KGAN, October 22, 2025, local outlet

7 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "QTS Cedar Rapids Data Center Campus", https://datacenterrecord.org/projects/qts-cedar-rapids-ia, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "QTS Cedar Rapids Data Center Campus", https://datacenterrecord.org/projects/qts-cedar-rapids-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
41.9025, -91.6895
How the location is known
Location from the site's street address.
Location source
https://qtsdatacenters.com/
Coordinate source
IEDA Board approval and Big Cedar Industrial Center parcel
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
300 MW, the developer's figure
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · QTS Cedar Rapids Data Center Campus · 7 sources, 6 entries · basis and source tier on every row · verified November 6, 2026