Census GEOID: 19113 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary sources

● Running First recorded October 21, 2026 · 1 Building

Enseva Cedar Rapids Data Center (Hiawatha)

Street address 755 Metzger Drive, Hiawatha, IA 52233, Linn County verified address Exact, at the address [1] echo.epa.gov

Overview, regulatory gates and specifications

Enseva operates a commercial colocation data center at 755 Metzger Drive in Hiawatha, Linn County, Iowa. [1] Filings on the record specify disclosed capacity of 8 MW (the developer's figure), 1 planned or operational building. [2] Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Iowa Department of Natural R
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
8 MW
the developer's figure

Equivalent to ~6,640 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.4% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 755 Metzger Drive, Hiawatha, IA 52233.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
8 MW developer figure Equivalent to the continuous electricity demand of about 6,640 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.078 percent) of New York City's summer peak demand in 2024.
[2] enseva.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] enseva.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
Enseva as stated by the source
[2] enseva.com
State permit status
Iowa Department of Natural Resources Stationary Emergency Generator and Commercial Facility Record (755 Metzger Drive, Hiawatha, IA 52233) the state's permit register, as of November 6, 2026
[1] echo.epa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Enseva Cedar Rapids Data Center (Hiawatha), capacity: 8 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 8 ÷ 10,245 = 0.00078 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Enseva
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Enseva Cedar Rapids Data Center (Hiawatha).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 8 MW 8 MW the developer's figure [2] enseva.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [2] enseva.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 20, 2026 Cedar Rapids, IA Cedar Rapids Linn County Solid Waste Agency Data Center Construction Waste Policy Cedar Rapids Linn County Solid Waste Agency Board 1 clip

In September 2026, the Cedar Rapids Linn County Solid Waste Agency enacted mandatory construction waste diversion rules after massive volumes of recyclable materials from Google and QTS hyperscale data center builds in southwest Cedar Rapids strained county landfill capacity.

  1. Cedar Rapids Linn County Solid Waste Agency Official Board & Planning Staff transcribed from local broadcast report
    "that increase, the biggest change was waste coming from data center construction. Load after load included recyclable things like clean wood pallets and scrap metal, but cardboard was the biggest concern. Cardboard has been banned from our landfill since 1999. And the way that the ban is written is if the load contains cardboard, their tipping fee doubles. And so, they were getting fined for it, but it wasn't slowing it down. So, we really realized we had to take another step."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] echo.epa.gov

Nearest data centers in Iowa

Verified data center records in Iowa within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Cedar Rapids Data Center Cedar Rapids, Linn County 10 mi Being built Google 3 buildings
Oppidan Connect Cedar Rapids Data Center (CLOP Cedar Rapids) Cedar Rapids, Linn County 10 mi Proposed Oppidan Investment Company 2 buildings
QTS Cedar Rapids Data Center Campus Cedar Rapids, Linn County 10 mi Being built QTS Data Centers 300 MW

Blank cell: not disclosed by any source on file.

Common questions about Enseva Cedar Rapids Data Center (Hiawatha)

Answered directly from the verified filings and local actions on this page.

Who is building Enseva Cedar Rapids Data Center (Hiawatha)?

Enseva is the developer, enseva.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Enseva Cedar Rapids Data Center (Hiawatha) say it needs?

Power: 8 MW (the developer's figure, enseva.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Enseva Cedar Rapids Data Center (Hiawatha) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. US EPA ECHO and Iowa Department of Natural Resources Stationary Generator & Parcel Record (755 Metzger Drive, Hiawatha, IA 52233) (opens in a new tab), U.S. Environmental Protection Agency and Iowa Department of Natural Resources, November 6, 2026
  2. Enseva Facility Specifications (755 Metzger Drive, Hiawatha, IA 52233) (opens in a new tab), Enseva, November 6, 2026

2 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Enseva Cedar Rapids Data Center (Hiawatha)", https://datacenterrecord.org/projects/enseva-cedar-rapids-hiawatha-ia, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Enseva Cedar Rapids Data Center (Hiawatha)", https://datacenterrecord.org/projects/enseva-cedar-rapids-hiawatha-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
42.0468, -91.6892
How the location is known
Location from the site's street address.
Location source
https://enseva.com/
Coordinate source
Enseva Hiawatha specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
8 MW, the developer's figure
Published
October 21, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Enseva Cedar Rapids Data Center (Hiawatha) · 2 sources, 1 entry · basis and source tier on every row · verified November 6, 2026