Data Center Record.
Census GEOID: 51087 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 5 primary and 1 reporting sources

● Running Recorded June 27, 2019

Meta Henrico Data Center

Street address 6200 Technology BLVD, Sandston, VA 23150, Henrico County permit coordinates Exact, the point of the EPA's facility record [4] EPA ECHO detailed facility report: Scout Development LLC

Overview, regulatory gates and specifications

Meta lists a data center at Henrico, Virginia among the sites it operates. [1] Filings on the record specify evaporative cooling. [1] Meta lists Meta Henrico Data Center at Henrico, Virginia on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
92 generators permitted
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [5]
71,072 gal/day
measured

Equivalent to ~237 U.S. households (U.S. EPA 300 gal/day household baseline).

Cooling: Evaporative. No local property tax abatement amount disclosed in public filings.

Site & Buildings
Not disclosed
Acreage not stated in public filings yet

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 6200 Technology BLVD, Sandston, VA 23150.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
25,941,276 gallons a year (withdrawal) permitted Equivalent to the annual water use of about 237 average U.S. households based on the U.S. Environmental Protection Agency baseline of 109,500 gallons per year per home, or about 39 Olympic size swimming pools of 660,000 gallons each. What at most 237 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
[5] sustainability.atmeta.com
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
92 generators (272 MW) permitted
[1] deq.virginia.gov
Capital investment
Not disclosed
Commissioned
Operational since 2020 (6 years)
Who leads it
Meta as stated by the source
How it is cooled
Evaporative as stated by the source
[5] sustainability.atmeta.com
Permitted legal entity
Scout Development LLC what a permit allows
[1] deq.virginia.gov [4] echo.epa.gov
State air permit registration
52629 state air permit register
[1] deq.virginia.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Meta Henrico Data Center, water: 25,941,276 gallons a year.
  2. 25,941,276 gallons a year ÷ 365 = 71,072 gallons a day.
  3. Water used at home each day by the average American family, more than: 300 gallons a day.
  4. 71,071.99 ÷ 300 = 236.91 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Rachel Peterson

Vice President for Data Center Strategy, Meta

DID Recorded statement at VEDP (September 7, 2026) [3]
SAID Rachel Peterson is Vice President for Data Center Strategy at Meta. (September 7, 2026) [3]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta · Applicant / Shell LLC: Scout Development LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Henrico Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System 25,941,276 gal/yr measured [5] sustainability.atmeta.com
Backup Diesel / Gas Generators 92 units (272 MW) what a permit allows [1] deq.virginia.gov
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

February 27, 2026 Henrico, VA Henrico zoning board denies Eastern Henrico data center Henrico City Council 2 clips

WTVR CBS 6 report on Henrico City Council and community proceedings in Henrico, VA: Henrico zoning board denies Eastern Henrico data center (February 27, 2026).

  1. WTVR CBS 6 Broadcast Report Broadcast Report transcribed from local broadcast report
    "Center, but whether the proposed site is zoned for a hyperscale data center. The county's board of suning appeals unanimously agree thursday that the developer behind the potential darby town road project located rikers east end. It does not have the vested right to build the facility. David wagner, centrist owner, it says the county encourage them to build a data center. But last year, the Henrico County board of supervisors decided that data"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Part of diligence and early 2025. We met directly with county staff and we're consistently told that this site some of them want industrial was appropriate and allowed that in some spots of black community. And I would do anything for my community and on to spell I we've been fighting this and felt like finally, heard us. And this all happened the same day that dozens of"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    The Henrico Data Center campus was completed in 2023.

    [3] vedp.org

  2. (source date; the content gives no date of its own)

    The first phase went online in August 2020.

    [3] vedp.org

  3. (source date; the content gives no date of its own)

    Site work began in February 2018.

    [3] vedp.org

  4. (source date; the content gives no date of its own)

    Meta announced a $1 billion additional investment in September 2018 for three new 500,000 square foot buildings.

    [3] vedp.org

  5. (source date; the content gives no date of its own)

    In October 2017, Meta announced plans to invest $750 million initially.

    [3] vedp.org

  6. (source date; the content gives no date of its own)

    In 2017, Meta began searching for a site for its eighth East Coast data center.

    [3] vedp.org

  7. · Status: running (content date)

    Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Scout Development LLC, registration 52629 (permit action 52629-4), Henrico County, on June 27, 2019. The permit document authorizes 92 emergency backup generators totaling 272 MW of permitted backup generator rating at 6200 Technology Boulevard (White Oak Technology Park), Sandston, Virginia 23150.

    [1] deq.virginia.gov

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta Henrico Data Center at Henrico, Virginia on its own page of data center locations, read September 14, 2026.

    [2] datacenters.atmeta.com

11 corrections to this record

Every correction, with its reason
  1. · Site coordinates

    Henrico is the county; no city of that name exists, so the record files at the county level. On the editor's word of October 16, 2026.

  2. · City

    Henrico is the county; no city of that name exists, so the record files at the county level. On the editor's word of October 16, 2026.

  3. · Site acreage

    The site read 970,000 acres. The source's figure was 970,000 square feet, a floor area, and the approval wrote it as acres. Returned to not disclosed, as it was before.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.

  9. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.

  10. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.

  11. · Source tier

    Tier after resolution (September 21, 2026). The source on file is vedp.org, the publisher's own page. The item reached the record through Google News: Meta Henrico Data Center, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 2 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.

Every correction on the record is on the corrections page.

Nearest data centers in Virginia

Verified data center records in Virginia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
QTS Richmond Mega Data Center (RIC1 Sandston) Sandston, Henrico County 5 mi Running QTS Data Centers 1 building
QTS Data Centers Sandston Sandston, Henrico County 5 mi Running QTS Data Centers 4 buildings
QTS Richmond Campus (RIC5 Sandston) Sandston, Henrico County 5 mi Running QTS Data Centers 1 building
Iron Mountain Information Management LLC Sandston, Henrico County ~6 mi Proposed Iron Mountain Data Centers
QTS Richmond V LLC Sandston, Henrico County ~6 mi Proposed QTS Data Centers
Bank of America-Sandston Sandston, Henrico County ~6 mi Proposed Bank of America

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Permanent jobs

1 figure, 1 source
200 jobs Company

VEDP, Sep 7, 2026

Show each source's words
  • 200 jobs, VEDP: Meta created 200 new jobs in Virginia with the data center.

Common questions about Meta Henrico Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Meta Henrico Data Center?

Meta is the developer. No construction contractor is named on the record yet.

Who will use Meta Henrico Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Meta Henrico Data Center say it needs?

Power: not disclosed by any source on file. Water: 25,941,276 gallons a year (withdrawal) (measured, sustainability.atmeta.com (opens in a new tab)).

Where does Meta Henrico Data Center stand today?

It is running, since June 27, 2019. The newest entry, reported September 7, 2026: The Henrico Data Center campus was completed in 2023. [3]

What is still unknown about Meta Henrico Data Center?

Not disclosed by any source on file: how much power it needs, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, buildings, where its power comes from, grid connection. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Virginia DEQ Air Permit 52629-4: Scout Development LLC (Scout Development LLC) (opens in a new tab), Virginia Department of Environmental Quality, June 27, 2019
  2. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  3. Meta Friends Virginia | VEDP - VEDP (opens in a new tab), VEDP, September 7, 2026
  4. EPA ECHO detailed facility report: Scout Development LLC (opens in a new tab), U.S. Environmental Protection Agency
  5. Meta 2026 Sustainability Report (FY2025 Data Index: Henrico Data Center Water Withdrawal) (opens in a new tab), Meta

Reporting

  1. Data centers keep growing in Virginia — and so does energy demand - VPM (opens in a new tab), VPM, November 14, 2024, local outlet

6 sources on file.

Regional grid context

This site is in the SERC Virginia and Carolina North (SRVC-N) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Henrico Data Center", https://datacenterrecord.org/projects/meta-henrico-data-center-va, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Henrico Data Center", https://datacenterrecord.org/projects/meta-henrico-data-center-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
37.4375205, -77.300333
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO Detailed Facility Report (FRS ID 110070072383) for Scout Development LLC (Meta Henrico Data Center) at 6200 Technology Boulevard, Sandston, VA 23150.
Coordinate source
EPA ECHO FRS ID 110070072383
Location last verified
October 24, 2026
Cooling
Evaporative
How water was disclosed
measured
Published
September 14, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta Henrico Data Center · 6 sources, 8 entries · basis and source tier on every row · verified October 26, 2026

Download CSV JSON