Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 5 primary and 1 reporting sources
Meta lists a data center at Henrico, Virginia among the sites it operates. [1] Filings on the record specify evaporative cooling. [1] Meta lists Meta Henrico Data Center at Henrico, Virginia on its own page of data center locations, read September 14, 2026. [2]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
Equivalent to ~237 U.S. households (U.S. EPA 300 gal/day household baseline).
Cooling: Evaporative. No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 6200 Technology BLVD, Sandston, VA 23150.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Rachel Peterson is Vice President for Data Center Strategy at Meta.(September 7, 2026) [3]
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Henrico Data Center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | |||
| Cooling & Water System | 25,941,276 gal/yr | measured [5] sustainability.atmeta.com | |
| Backup Diesel / Gas Generators | 92 units (272 MW) | what a permit allows [1] deq.virginia.gov | |
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
WTVR CBS 6 report on Henrico City Council and community proceedings in Henrico, VA: Henrico zoning board denies Eastern Henrico data center (February 27, 2026).
"Center, but whether the proposed site is zoned for a hyperscale data center. The county's board of suning appeals unanimously agree thursday that the developer behind the potential darby town road project located rikers east end. It does not have the vested right to build the facility. David wagner, centrist owner, it says the county encourage them to build a data center. But last year, the Henrico County board of supervisors decided that data"
"Part of diligence and early 2025. We met directly with county staff and we're consistently told that this site some of them want industrial was appropriate and allowed that in some spots of black community. And I would do anything for my community and on to spell I we've been fighting this and felt like finally, heard us. And this all happened the same day that dozens of"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
The Henrico Data Center campus was completed in 2023.
(source date; the content gives no date of its own)
The first phase went online in August 2020.
(source date; the content gives no date of its own)
Site work began in February 2018.
(source date; the content gives no date of its own)
Meta announced a $1 billion additional investment in September 2018 for three new 500,000 square foot buildings.
(source date; the content gives no date of its own)
In October 2017, Meta announced plans to invest $750 million initially.
(source date; the content gives no date of its own)
In 2017, Meta began searching for a site for its eighth East Coast data center.
· Status: running (content date)
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Scout Development LLC, registration 52629 (permit action 52629-4), Henrico County, on June 27, 2019. The permit document authorizes 92 emergency backup generators totaling 272 MW of permitted backup generator rating at 6200 Technology Boulevard (White Oak Technology Park), Sandston, Virginia 23150.
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
Meta lists Meta Henrico Data Center at Henrico, Virginia on its own page of data center locations, read September 14, 2026.
Henrico is the county; no city of that name exists, so the record files at the county level. On the editor's word of October 16, 2026.
· City
Henrico is the county; no city of that name exists, so the record files at the county level. On the editor's word of October 16, 2026.
The site read 970,000 acres. The source's figure was 970,000 square feet, a floor area, and the approval wrote it as acres. Returned to not disclosed, as it was before.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives vedp.org. The link did not change.
Tier after resolution (September 21, 2026). The source on file is vedp.org, the publisher's own page. The item reached the record through Google News: Meta Henrico Data Center, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 2 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.
Every correction on the record is on the corrections page.
Verified data center records in Virginia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| QTS Richmond Mega Data Center (RIC1 Sandston) Sandston, Henrico County | 5 mi | Running | QTS Data Centers | 1 building |
| QTS Data Centers Sandston Sandston, Henrico County | 5 mi | Running | QTS Data Centers | 4 buildings |
| QTS Richmond Campus (RIC5 Sandston) Sandston, Henrico County | 5 mi | Running | QTS Data Centers | 1 building |
| Iron Mountain Information Management LLC Sandston, Henrico County | ~6 mi | Proposed | Iron Mountain Data Centers | |
| QTS Richmond V LLC Sandston, Henrico County | ~6 mi | Proposed | QTS Data Centers | |
| Bank of America-Sandston Sandston, Henrico County | ~6 mi | Proposed | Bank of America |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Meta is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: 25,941,276 gallons a year (withdrawal) (measured, sustainability.atmeta.com (opens in a new tab)).
It is running, since June 27, 2019. The newest entry, reported September 7, 2026: The Henrico Data Center campus was completed in 2023. [3]
Not disclosed by any source on file: how much power it needs, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, buildings, where its power comes from, grid connection. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Official operator or facility campus page verified in 50 state website discovery pass.
6 sources on file.
This site is in the SERC Virginia and Carolina North (SRVC-N) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Meta Henrico Data Center. Last verified October 26, 2026. https://datacenterrecord.org/projects/meta-henrico-data-center-va. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Meta Henrico Data Center
Data Center Record, "Meta Henrico Data Center", https://datacenterrecord.org/projects/meta-henrico-data-center-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.