Data Center Record.

Being built Built from one source

Google Columbia County data center

Google lists a data center at Columbia County, Georgia and says it is being built. It is being built, as reported August 31, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 7 sources, 1 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
3,358 acres
third party estimate [5]
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Google
as stated by the source [6]
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Where its power comes from
96 MW from nuclear uprates
as stated by the source [3]
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Google as stated by the source [6] wfxg.com September 25, 2026
Who is constructing it Not disclosed
How much land 3,358 acres third party estimate [5] wrdw.com September 25, 2026
Where its power comes from 96 MW from nuclear uprates as stated by the source [3] augustachronicle.com September 25, 2026
Grid connection Not disclosed
How it is cooled Not disclosed

Jobs once it runs, also reported: 1,600 jobs, households, students, 2026 (WFXG FOX54: The study projects the development could lead to roughly 1,600 new jobs, 472 new local households and 307 additional students in the Columbia County School System., WRDW: The study projects the project could create 1,600 new jobs, 472 new local households and 307 new students in the Columbia County School System.) .

Tax it would pay each year, also reported: 22,000 USD, 2026 (WRDW: The land currently generates $22,000 a year in taxes for the county and schools. The county's projected tax revenue from the site is $12 billion.) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Columbia County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Columbia County Economic Development Authority of Columbia County is working with Google on a Memorandum of Understanding for a data center partnership yahoo.com

What happened

  1. (source date; the content gives no date of its own)

    Georgia Power wants to upgrade two reactors at Plant Vogtle near Augusta and two at Plant Hatch west of Savannah to put roughly 100 megawatts total of emission free electricity on the power grid. [4]

  2. (the day the page was read; it gives no date of its own)

    Google lists Google Columbia County data center at Columbia County, Georgia on its own page of data center locations, read September 14, 2026. [1]

  3. (source date; the content gives no date of its own)

    Agreement mandates 65 decibel noise ceiling and 500 foot buffer zone from residential areas. [7]

  4. (source date; the content gives no date of its own)

    First payments expected late 2026 or early 2027 depending on construction milestones. [7]

  5. (source date; the content gives no date of its own)

    Two major sites: White Oak and Pumpkin Center area in Columbia County. [7]

  6. · Status: being built (source date; the content gives no date of its own)

    Economic Development Authority approved memorandum of understanding for Google Data Center in Columbia County, Georgia. [7]

The full Google Columbia County data center timeline, in order

What was said

Dr. Christopher Kadlec warned that emergency backup power systems present environmental considerations, particularly diesel powered generators during severe weather in south Georgia.
Dr. Christopher Kadlec, Georgia Southern University applied cyber education director · September 23, 2026 · paraphrased · WRDW local outlet
Jen Ryan stated that Google worked with Columbia County leadership to exceed decibel standards and buffers for the data center.
Jen Ryan, Google representative · September 10, 2026 · paraphrased · AOL.com local outlet

Every statement about data centers in Georgia, by speaker

10 more statements on this page

Dr. Christopher Kadlec, Georgia Southern University applied cyber education director, explained that data centers are attracted to Georgia because of infrastructure, power, and Plant Vogtle nuclear generation.

September 23, 2026, WRDW · WRDW local outlet · the record (Paraphrased; said in the source itself)

Google agreed to pay a premium for new electricity from planned upgrades as part of a new program Georgia Power submitted to state regulators on Monday.

September 22, 2026, ajc.com · ajc.com local outlet · the record (Paraphrased; said in the source itself)

Georgia Power stated the plan would use federal and state tax credits and a pending loan guarantee from the U.S. Department of Energy to offset some upgrade costs.

September 22, 2026, The Augusta Chronicle · The Augusta Chronicle local outlet · the record (Paraphrased; said in the source itself)

Georgia Power

Google agreed to subscribe to a new tariff and receive zero emission credits in exchange for supporting the nuclear upgrades.

September 22, 2026, The Augusta Chronicle · The Augusta Chronicle local outlet · the record (Paraphrased; said in the source itself)

Google representative Jen Ryan spoke at the Future Forward Summit about the Google data center coming to Columbia County, discussing standards for noise, lighting, and water usage.

September 10, 2026, AOL.com · AOL.com local outlet · the record (Paraphrased; said in the source itself)

Also reported by 1 source: Yahoo national outlet

Google representative

Jen Ryan said data centers employ many people, citing hundreds of employees at the Douglas County data center on any given day.

September 10, 2026, Yahoo · Yahoo national outlet · the record (Paraphrased; said in the source itself)

Also reported by 1 source: AOL.com local outlet

Columbia County Commissioner Doug Duncan stated that Google was an opponent during negotiations but understood the county's vision.

September 10, 2026, AOL.com · AOL.com local outlet · the record (Paraphrased; said in the source itself)

Google representative

Jen Ryan said the data center will follow certain standards when it comes to noise, lighting, and water usage.

September 10, 2026, Yahoo · Yahoo national outlet · the record (Paraphrased; said in the source itself)

Scott Johnson, Columbia County Manager, said the goal is to find innovative ways to grow the economy, protect residents, and reduce the burden of property taxes through the partnership

August 26, 2026, WJBF · WJBF national outlet · the record (Paraphrased; said in the source itself)

Doug Duncan, Columbia County Chairman, said the county is building a partnership that has the potential to generate billions of dollars in revenue for Columbia County and provide meaningful property tax relief for homeowners

August 26, 2026, WJBF · WJBF national outlet · the record (Paraphrased; said in the source itself)

The site

Where in Columbia County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Being built, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 19 other published records in Georgia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Columbia County, Georgia
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Permanent jobs

1 figure, 2 sources
1,600 jobs, households, studentsReported

WFXG FOX54, Sep 23, 2026; WRDW, Sep 23, 2026

Show each source's words
  • 1,600 jobs, households, students, WFXG FOX54: The study projects the development could lead to roughly 1,600 new jobs, 472 new local households and 307 additional students in the Columbia County School System.
  • 1,600 jobs, households, students, WRDW: The study projects the project could create 1,600 new jobs, 472 new local households and 307 new students in the Columbia County School System.

Tax each year

1 figure, 1 source
22,000 USDReported

WRDW, Sep 23, 2026

Show each source's words
  • 22,000 USD, WRDW: The land currently generates $22,000 a year in taxes for the county and schools. The county's projected tax revenue from the site is $12 billion.

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Google Columbia County data center?

The record has one measure of its size: 3,358 acres (third party estimate, source). Its power capacity is not disclosed.

Who is building Google Columbia County data center?

Google is the developer, source. No construction contractor is named on the record yet.

Who will use Google Columbia County data center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Google Columbia County data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

What has Columbia County decided about it?

Columbia County: Economic Development Authority of Columbia County is working with Google on a Memorandum of Understanding for a data center partnership (reported August 26, 2026, source). 1 event is on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Google Columbia County data center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Google: Data center locations, Google, September 14, 2026

Reporting

  1. Columbia County pitches Google project as path to property tax relief - The Augusta Chronicle, The Augusta Chronicle, August 28, 2026, query feed
  2. Georgia Power, Google to upgrade Plant Vogtle? What's happening - The Augusta Chronicle, The Augusta Chronicle, September 22, 2026, local outlet
  3. Georgia Power nuclear reactors to get huge face lift, paid partly by Google - ajc.com, ajc.com, September 22, 2026, local outlet
  4. Google data center could generate billions, add jobs, and new households - WRDW, WRDW, September 23, 2026, local outlet
  5. What Google’s Data Center could mean for Columbia County’s Economy - WFXG FOX54, WFXG FOX54, September 23, 2026, local outlet
  6. $17bn Google Data Center in Columbia County Advances as Firm Finalizes Agreement with Officials - Construction Review, Construction Review, August 31, 2026, local outlet

7 sources on file.

Cite this record

Data Center Record, "Google Columbia County data center", https://datacenterrecord.org/projects/google-columbia-county-data-center-ga, last verified September 25, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Google Columbia County data center", https://datacenterrecord.org/projects/google-columbia-county-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
google-columbia-county-data-center-ga
Status value
under_construction
Stage
Being built
Tier
skeleton
Tags
skeleton
Place id
us/ga/columbia-county
Coordinates
33.5458, -82.3158
Location precision
county
Location source
County seat (Appling), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
third_party_estimate
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-14
Last verified
2026-09-25