Data Center Record.

Proposed Built from one source

3 G Investments, LLC Richmond data center

Richmond County, GADeveloper: 3 G Investments, LLCCensus GEOID 13245

Stage
Proposed
Undisclosed in public filings
Power, Land, Buildings, Water

3 G Investments, LLC Richmond data center It is reported; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 2 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 46 other published records in Georgia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
3 G Investments, LLC as stated by the source
[1] datacenterdynamics.com
How it is cooled
Closed loop liquid as stated by the source
[2] augustachronicle.com
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it 3 G Investments, LLC as stated by the source [1] datacenterdynamics.com (opens in a new tab) October 21, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled Closed loop liquid as stated by the source [2] augustachronicle.com (opens in a new tab) October 21, 2026
Cooling fluid

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Richmond County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Augusta Augusta Commission planned to vote on data center ordinance on September 15, 2026 wfxg.com (opens in a new tab)
Augusta Augusta released final draft of data center ordinance with redline version showing all revisions wfxg.com (opens in a new tab)
Augusta Augusta leaders hosted meeting on data center ordinance wrdw.com (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

Where in Richmond County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

The site map is at the top of the page.

Where
Richmond County, Georgia
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building 3 G Investments, LLC Richmond data center?

3 G Investments, LLC is the developer, datacenterdynamics.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does 3 G Investments, LLC Richmond data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does 3 G Investments, LLC Richmond data center stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Richmond County decided about it?

Augusta: Augusta Commission planned to vote on data center ordinance on September 15, 2026 (reported September 9, 2026, wfxg.com (opens in a new tab)); and Augusta: Augusta released final draft of data center ordinance with redline version showing all revisions (reported September 9, 2026, wfxg.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Application filed for 3.3 million sq ft data center campus in Augusta, Georgia - Data Center Dynamics (opens in a new tab), Data Center Dynamics, October 14, 2026, trade press
  2. Another data center could be coming to Augusta. Here's where| Exclusive - The Augusta Chronicle (opens in a new tab), The Augusta Chronicle, October 13, 2026, local outlet

2 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "3 G Investments, LLC Richmond data center", https://datacenterrecord.org/projects/3-g-investments-llc-richmond-data-center-ga, last verified October 21, 2026. CSV · JSON
Cite this page

Data Center Record, "3 G Investments, LLC Richmond data center", https://datacenterrecord.org/projects/3-g-investments-llc-richmond-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.47, -81.975
How the location is known
Location is the county seat; exact site not disclosed.
Coordinate source
county seat, the county seat list
Cooling
Closed loop liquid
Published
October 21, 2026
Last verified
October 21, 2026
Undisclosed in public filings
Location source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · 3 G Investments, LLC Richmond data center · 2 sources, 0 entries, 3 decisions nearby · basis and source tier on every row · verified October 21, 2026

Download CSV JSON