3 G Investments, LLC Richmond data center
Richmond County, GADeveloper: 3 G Investments, LLCCensus GEOID 13245
- Stage
- Proposed
- Undisclosed in public filings
- Power, Land, Buildings, Water
3 G Investments, LLC Richmond data center It is reported; the record holds no sourced date for when it reached that stage.
How much power it needs, how much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 46 other published records in Georgia
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Undisclosed in public filings
- Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | ||||
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | 3 G Investments, LLC | as stated by the source | [1] datacenterdynamics.com (opens in a new tab) | October 21, 2026 |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | ||||
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled | Closed loop liquid | as stated by the source | [2] augustachronicle.com (opens in a new tab) | October 21, 2026 |
| Cooling fluid |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Richmond County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Augusta | Augusta Commission planned to vote on data center ordinance on September 15, 2026 | wfxg.com (opens in a new tab) | |
| Augusta | Augusta released final draft of data center ordinance with redline version showing all revisions | wfxg.com (opens in a new tab) | |
| Augusta | Augusta leaders hosted meeting on data center ordinance | wrdw.com (opens in a new tab) |
What happened
No dated entry is on the record yet.
The site
Where in Richmond County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
- Where
- Richmond County, Georgia
- How exactly it is located
- County level, the county seat
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at a county seat.
Keep going
Questions about this project
4 questions answered from the record
Who is building 3 G Investments, LLC Richmond data center?
-
3 G Investments, LLC is the developer, datacenterdynamics.com (opens in a new tab). No construction contractor is named on the record yet.
How much power and water does 3 G Investments, LLC Richmond data center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does 3 G Investments, LLC Richmond data center stand today?
-
It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Richmond County decided about it?
-
Augusta: Augusta Commission planned to vote on data center ordinance on September 15, 2026 (reported September 9, 2026, wfxg.com (opens in a new tab)); and Augusta: Augusta released final draft of data center ordinance with redline version showing all revisions (reported September 9, 2026, wfxg.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Reporting
- Application filed for 3.3 million sq ft data center campus in Augusta, Georgia - Data Center Dynamics (opens in a new tab), Data Center Dynamics, October 14, 2026, trade press
- Another data center could be coming to Augusta. Here's where| Exclusive - The Augusta Chronicle (opens in a new tab), The Augusta Chronicle, October 13, 2026, local outlet
2 sources on file.
About this data
Last verified and first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about 3 G Investments, LLC Richmond data center
Cite this page
Data Center Record, "3 G Investments, LLC Richmond data center", https://datacenterrecord.org/projects/3-g-investments-llc-richmond-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Stage
- Proposed
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 33.47, -81.975
- How the location is known
- Location is the county seat; exact site not disclosed.
- Coordinate source
- county seat, the county seat list
- Cooling
- Closed loop liquid
- Published
- October 21, 2026
- Last verified
- October 21, 2026
- Undisclosed in public filings
- Location source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows