Data Center Record.
Census GEOID: 13073 Location Precision: assessor parcel Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and local sources

● Proposed Campus Announced May 5, 2026 · 3 Buildings · The Whiting-Turner Contracting Company

Project Squash Data Center Campus (Columbia County, DRI #4735)

Street address 6423 Wrightsboro Rd, Harlem, GA 30814, Columbia County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

The Whiting-Turner Contracting Company filed Georgia DCA DRI #4735 on May 5, 2026 for Project Squash, a 200 MW data center campus on 325 acres at 6423 Wrightsboro Road near Harlem in unincorporated Columbia County. [1] Filings on the record specify 3 planned or operational buildings. [1] On the regulatory record, state permit status is Georgia DCA DRI #4735 regional review filing. [1]

1. Land & Parcel
325 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
$20,000,000/yr stated
4. Utility Grid Queue
200 MW disclosed
5. Air & Water Permits
Georgia DCA DRI #4735 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
200 MW
the developer's figure

Equivalent to ~166,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 9.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water [1]
148,000 gal/day
the developer's figure

Equivalent to ~493 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $20,000,000.

Site & Buildings [2]
325 acres
the developer's figure

3 planned or operational data hall buildings.

Location: 6423 Wrightsboro Rd, Harlem, GA 30814.

Taxes & Permanent Jobs [1]
$20,000,000/yr
the developer's figure

30 permanent on site jobs disclosed.

Stated annual local tax revenue: $20,000,000.

Key specifications on the record

Power capacity
200 MW developer figure Equivalent to the continuous electricity demand of about 166,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 2 percent of New York City's summer peak demand in 2024.
apps.dca.ga.gov (opens in a new tab)
Water usage
148,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 493 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 493 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
325 acres developer figure
[2] apps.dca.ga.gov
Buildings
3 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
The Whiting-Turner Contracting Company as stated by the source
[1] apps.dca.ga.gov
Jobs once it runs
30 the developer's figure
Tax each year
$20,000,000 the developer's figure
Permitted legal entity
The Whiting-Turner Contracting Company the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4735 state air permit register
State permit status
Georgia DCA DRI #4735 regional review filing the state's permit register, as of May 5, 2026, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it
The math behind the comparison
  1. Project Squash Data Center Campus (Columbia County, DRI #4735), capacity: 200 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 200 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

  1. Project Squash Data Center Campus (Columbia County, DRI #4735), water: 148,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 148,000 ÷ 300 = 493.33 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: The Whiting-Turner Contracting Company
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Project Squash Data Center Campus (Columbia County, DRI #4735).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 200 MW the developer's figure
Site Footprint (Acres) 325 acres 325 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 3 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 148,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $20,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.

What was decided

Acts of Columbia County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Columbia County Economic Development Authority of Columbia County is working with Google on a Memorandum of Understanding for a data center partnership yahoo.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    The Whiting-Turner Contracting Company filed Georgia DCA DRI #4735 on May 5, 2026 for Project Squash, a 200 MW data center campus on 325 acres at 6423 Wrightsboro Road near Harlem in unincorporated Columbia County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Columbia County Data Center (White Oak Technology Park) Appling, Columbia County 1 mi Being built Google 12 buildings
Project JGK Data Center Campus (Columbia County, DRI #4736) Columbia County 4 mi Proposed Turner Construction Company 1.4 GW
Project Azelea Data Center Campus (McDuffie County, DRI #4602) McDuffie County 5 mi Proposed Project Azelea Applicant 400 MW
Project Eisenhower Data Center Campus (Augusta, DRI #4171) Augusta, Richmond County 12 mi Proposed Eagle South, LLC 6 buildings
Nixon Technology Center (Augusta, DRI #4853) Richmond County 21 mi Proposed 3 G Investments, LLC 600 MW
QTS Augusta Data Center Campus Augusta, Richmond County 22 mi Being built QTS Data Centers 8 buildings

Blank cell: not disclosed by any source on file.

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Permanent jobs

2 figures, 3 sources
Show each source's words
  • 1,600 jobs, households, students, WFXG FOX54: The study projects the development could lead to roughly 1,600 new jobs, 472 new local households and 307 additional students in the Columbia County School System.
  • 1,600 jobs, households, students, WRDW: The study projects the project could create 1,600 new jobs, 472 new local households and 307 new students in the Columbia County School System.

Tax each year

2 figures, 2 sources
Show each source's words
  • 22,000 USD, WRDW: The land currently generates $22,000 a year in taxes for the county and schools. The county's projected tax revenue from the site is $12 billion.

Common questions about Project Squash Data Center Campus (Columbia County, DRI #4735)

Answered directly from the verified filings and local actions on this page.

Who is building Project Squash Data Center Campus (Columbia County, DRI #4735)?

The Whiting-Turner Contracting Company is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

Who will use Project Squash Data Center Campus (Columbia County, DRI #4735)?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Project Squash Data Center Campus (Columbia County, DRI #4735) say it needs?
Where does Project Squash Data Center Campus (Columbia County, DRI #4735) stand today?
What has Columbia County decided about it?

Columbia County: Economic Development Authority of Columbia County is working with Google on a Memorandum of Understanding for a data center partnership (reported August 26, 2026, yahoo.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Project Squash Data Center Campus (Columbia County, DRI #4735)?

Not disclosed by any source on file: how loud it would be, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4735 Application Summary (Project Squash Data Center Campus (Columbia County, DRI #4735)) (opens in a new tab), Georgia Department of Community Affairs, May 5, 2026
  2. Georgia DCA DRI #4735 Initial Form (Project Squash Data Center Campus (Columbia County, DRI #4735)) (opens in a new tab), Georgia Department of Community Affairs, May 5, 2026

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Project Squash Data Center Campus (Columbia County, DRI #4735)", https://datacenterrecord.org/projects/project-squash-harlem-columbia-county-ga, last verified May 5, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Project Squash Data Center Campus (Columbia County, DRI #4735)", https://datacenterrecord.org/projects/project-squash-harlem-columbia-county-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.485464, -82.325346
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4735
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4735
Location last verified
November 11, 2026
How capacity was disclosed
the developer's figure
How water was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
200 MW, the developer's figure
Published
November 11, 2026
Last verified
May 5, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, Interconnection, Rating of the county's rows

Researcher view · Project Squash Data Center Campus (Columbia County, DRI #4735) · 2 sources, 1 entry, 1 decision nearby · basis and source tier on every row · verified May 5, 2026

Download CSV JSON