The Whiting-Turner Contracting Company filed Georgia DCA DRI #4735 on May 5, 2026 for Project Squash, a 200 MW data center campus on 325 acres at 6423 Wrightsboro Road near Harlem in unincorporated Columbia County. [1] Filings on the record specify 3 planned or operational buildings. [1] On the regulatory record, state permit status is Georgia DCA DRI #4735 regional review filing. [1]
Equivalent to ~166,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 9.6% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
Equivalent to ~493 U.S. households (U.S. EPA 300 gal/day household baseline).
Stated annual local tax revenue: $20,000,000.
3 planned or operational data hall buildings.
Location: 6423 Wrightsboro Rd, Harlem, GA 30814.
30 permanent on site jobs disclosed.
Stated annual local tax revenue: $20,000,000.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Sources:
The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Project Squash Data Center Campus (Columbia County, DRI #4735).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 200 MW | the developer's figure | |
| Site Footprint (Acres) | 325 acres | 325 acres | the developer's figure [2] apps.dca.ga.gov |
| Data Hall Buildings | 3 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | 148,000 gal/day | the developer's figure | |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue | $20,000,000/yr | the developer's figure |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Columbia County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Columbia County | Economic Development Authority of Columbia County is working with Google on a Memorandum of Understanding for a data center partnership | yahoo.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
The Whiting-Turner Contracting Company filed Georgia DCA DRI #4735 on May 5, 2026 for Project Squash, a 200 MW data center campus on 325 acres at 6423 Wrightsboro Road near Harlem in unincorporated Columbia County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Google Columbia County Data Center (White Oak Technology Park) Appling, Columbia County | 1 mi | Being built | 12 buildings | |
| Project JGK Data Center Campus (Columbia County, DRI #4736) Columbia County | 4 mi | Proposed | Turner Construction Company | 1.4 GW |
| Project Azelea Data Center Campus (McDuffie County, DRI #4602) McDuffie County | 5 mi | Proposed | Project Azelea Applicant | 400 MW |
| Project Eisenhower Data Center Campus (Augusta, DRI #4171) Augusta, Richmond County | 12 mi | Proposed | Eagle South, LLC | 6 buildings |
| Nixon Technology Center (Augusta, DRI #4853) Richmond County | 21 mi | Proposed | 3 G Investments, LLC | 600 MW |
| QTS Augusta Data Center Campus Augusta, Richmond County | 22 mi | Being built | QTS Data Centers | 8 buildings |
Blank cell: not disclosed by any source on file.
The Whiting-Turner Contracting Company, May 5, 2026 (opens in a new tab)
WFXG FOX54, Sep 23, 2026 (opens in a new tab); WRDW, Sep 23, 2026 (opens in a new tab)
The Whiting-Turner Contracting Company, May 5, 2026 (opens in a new tab)
Answered directly from the verified filings and local actions on this page.
The Whiting-Turner Contracting Company is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: 200 MW (the developer's figure, apps.dca.ga.gov (opens in a new tab)). Water: 148,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).
Columbia County: Economic Development Authority of Columbia County is working with Google on a Memorandum of Understanding for a data center partnership (reported August 26, 2026, yahoo.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.
Not disclosed by any source on file: how loud it would be, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Project Squash Data Center Campus (Columbia County, DRI #4735). Last verified May 5, 2026. https://datacenterrecord.org/projects/project-squash-harlem-columbia-county-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Project Squash Data Center Campus (Columbia County, DRI #4735)
Data Center Record, "Project Squash Data Center Campus (Columbia County, DRI #4735)", https://datacenterrecord.org/projects/project-squash-harlem-columbia-county-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.